EG4 6000XP Settings Walkthrough | Commissioning and Important Settings
Вставка
- Опубліковано 30 тра 2024
- Join Brayden as he steps through all of the settings currently available on the 6000XP during commissioning. The 6000XP is very versatile in its operation as an off-grid inverter, so it's important to be familiar with your settings!
Our Website: eg4electronics.com/
Our Distributors: eg4electronics.com/distributors
#6000XP #EG4 #powermorewithEG4 #energygeneration4everyone - Наука та технологія
There is a lot of confusion about charging Lifepo4 batteries in lead acid mode. I already had 4 100ah off the shelf batteries and added 4 more. We spend a lot of money with you for these inverters and it seems this area is lacking. thanks
If setting #11is initial cut off and setting #12 is the final cut off why can't setting #11 be higher than setting #12? The Inverter will not allow me to set the value in #11 higher than the value in #12.
How do I turn them this off of UPS mode for some reason it starts to charge my batteries from grid randomly
You just started by skipping the switch state for the battery before doing anything. Shouldn't the battery breakers be off?
Can this be used in Europe 240v 50hz?
I am running my 6 Lifepower4 batteries in lead acid mode. They need updating to work and the software patch wouldn't work. I was promised an updating device but it hasn't arrived yet.
I didn't see the card or link for the GenBoost feature overview. Can you point me to it?
Absolutely, here is a link to that video:
ua-cam.com/video/EcLp__CDLf0/v-deo.html
Wonder if this is compatible with AOlithium 48v batteries?
I don't believe AOlithium is a BMS that is supported in closed loop, unless it utilizes a protocol that one of the supported battery brands has. You can find the compatibility list here: eg4electronics.com/wp-content/uploads/2024/04/EG4-6000XP-Battery-Compatibility-List.pdf
Otherwise, you should be able to utilize them in open loop (set as Lead-Acid on the 6000XP).
Are these settings applied the same to all inverters in parallel
Ex. 4 inverters in parallel
AFAIK, you make the changes on the primary inverter. It publishes the settings to the secondary inverters.
If you have an existing GT system you can force AC charge while your GT is producing, like time of use... keep what you make, island as much as you can. Unless you have a 1 to 1, then this doesn't apply.
Agree, too fast for me. Great equipment, but could use some help to improve this video and more important the app.
Wish they had a proper UL listing for building codes. Just watched a video where they all had to be removed and replaced to meet electrical code. Just ordered my panels from you but skipped the inverters because of that and looking at alternatives. Will these ever receive proper UL ratings for use under the NEC so they can be legally used?
Can you post a link to the video?
@kenthiergartner1506 ua-cam.com/video/i7CsDm1FfbI/v-deo.html
@@AndrewVanTil watch the video. He explains how it is illegal according to the NEC and can't get a permit to finalize the installation.
From my understanding, they have been tested to comply with UL 1741, but are not UL listed, which only happens when UL tests them. Not a third party.
UL fills two roles in this area. First, generating the standards for NRTLs to certify against. Second, as an NRTL. The NRTLs are functionally equivalent. It doesn't matter if UL or Interek (for e.g.) perform the certification. It is the same thing. You can view the certification of compliance with UL 1741 here: eg4electronics.com/wp-content/uploads/2024/04/EG4-6000XP-UL1741-Certificate-of-Compliance.pdf.
Far too fast for those not familiar with it already.Much more detail needed, on every single step, again slower. Such as matching audio to finger settings, he is not synching slowly enough to catch and how do you change the date is the order yr / mo / day ? etc etc all along way to confusing for some.