First Drive on New Silk Board Double Decker Flyover | All you need to know about this elevated road

Поділитися
Вставка
  • Опубліковано 5 лип 2024
  • Double decker flyover Bangalore | Silk board flyover | Silk board flyover plan | Silk board flyover opening date | yellow line metro | Ragigudda to Silk board flyover Silk Board junction traffic | Silk Board flyover | Double decker flyover | Yellow line metro | Ragigudda metro station | Silk Board to Electronic city | HSR Layout traffic | Namma Metro
    The long awaited metro cum elevated road which aims to cut down traffic jams at the Silk Board junction in Bengaluru is finally ready for inauguration.
    DH gets exclusive access to drive from Ragigudda to Silk Board, before the flyover is open to the public.
    Will this new double decker flyover make the commute to Electronic City easier? Will it reduce the traffic snarls?
    DH’s Udbhavi has all the details. Watch the video to find out more about this new flyover.
    #silkboard #nammametro #flyover #traffic #trafficjam #yellowline #electronicity #hsrlayout #btmlayout
    ------------
    Liked the video? Tell us how we are doing in the comments section and don't forget to subscribe to our channel.
    Hit the Bell icon & never miss a video from Deccan Herald.
    For latest news, views & analysis log on to www.deccanherald.com/
    Subscribe to our Telegram notifications: t.me/DeccanHeraldNews
    Facebook: / deccanherald

КОМЕНТАРІ • 1 тис.

  • @owl_tradigrade
    @owl_tradigrade 14 днів тому +618

    woahh!!! soo excited for this 😂 Can't believe my life now revolves around the dream of the opening of this flyover ✌😅👀

    • @priyabratadash1833
      @priyabratadash1833 14 днів тому +4

      So true even for me

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 14 днів тому +13

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @im_gunari
      @im_gunari 14 днів тому

      🤣🤣

    • @djay6543
      @djay6543 13 днів тому +3

      As if silk board doesn't already have flyovers. Hebbal traffic is not even 20% of what silk board traffic is. Bullshit comparison.

    • @SupreethDT
      @SupreethDT 13 днів тому

      😅

  • @ameyhinge5352
    @ameyhinge5352 14 днів тому +412

    Unpopular opinion: I have faced worse traffic at Hebbal even with all the flyovers then at the Silk board junction.

    • @sabarisk2005
      @sabarisk2005 14 днів тому +68

      Now imagine if that fly over wasn't there at hebbal

    • @owl_tradigrade
      @owl_tradigrade 14 днів тому +15

      not an unpopular opinion at all. Both are equally infamous 🥲

    • @neelj5155
      @neelj5155 14 днів тому +9

      Id rather be in silk board than hebbal 😊

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 14 днів тому +15

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @madhukeshnp
      @madhukeshnp 14 днів тому +2

      100% Agreed. Your points are valid. But none from Deccan herald have replied to your comment... i hope someone relays your message to authorities.

  • @SharathRamachandra
    @SharathRamachandra 14 днів тому +337

    Honestly speaking Silk board junction is improved from what it was few years ago.
    Government/BBMP and media as well should now focus on Madivala to Nexus/Forum Mall signal, as this is notorious during peak time and takes around 40mins to cross. Also Hebbal flyover as well (from airport to City). During peak times, takes around 1hour or more to just cross the flyover.

    • @mohammedishaq6238
      @mohammedishaq6238 14 днів тому +8

      Very good observation Dear
      Very Madival and St jhansi hospital Siglnal it's very bad stretch

    • @kishan5481
      @kishan5481 14 днів тому +3

      ​@@mohammedishaq6238Honestly Koramangala is ignored to the fullest..

    • @mysterious_billionaire
      @mysterious_billionaire 14 днів тому +3

      Learn from Chennai. There are hardly any signals there, all junctions have flyovers

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 14 днів тому +2

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +3

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

  • @raghavendrasunkollu3198
    @raghavendrasunkollu3198 14 днів тому +296

    Ragigudda exit will become next silk-board trust me

    • @TheOneCity1
      @TheOneCity1 14 днів тому +24

      Yes it will stupid people don't know how to design!

    • @anandpokale2755
      @anandpokale2755 14 днів тому +40

      @@TheOneCity1 no problem, they design one more flyover there. maybe after 10 .. 20 years

    • @TheOneCity1
      @TheOneCity1 14 днів тому +5

      @@anandpokale2755 🤣🤣

    • @prasannacs5358
      @prasannacs5358 14 днів тому +8

      One day they will make flying cars. Wait for it till then😅

    • @TheOneCity1
      @TheOneCity1 14 днів тому

      @@prasannacs5358 we already have flying cars but there are may problems

  • @ashu0895
    @ashu0895 14 днів тому +207

    By the time it is inaugrated, the numbers for which it is designed will become 1.5 times and then there will be traffic above as well as below

    • @Sam-rl5hs
      @Sam-rl5hs 14 днів тому +30

      Why are you crying instead of appreciating what is being done. There is metro also coming up on that road which should further help reducing the traffic.

    • @bonmec101
      @bonmec101 14 днів тому +2

      People are using 2w to commute instead of 4w even though they can afford unlike west. That reduces lot of traffic. The main problem with this junction is it obstructs free flow of traffic which this flyover aims to solve. Hopefully, people use metro for commute when ready. Last mile connectivity should be included in metro ticket.

    • @whykoks
      @whykoks 14 днів тому

      100% correct, capacity planning is poor

    • @tejasm5324
      @tejasm5324 14 днів тому

      You're right the problem is that this will encourage people more to use this and people will get stuck up and down aswell

    • @bhabanibehera5737
      @bhabanibehera5737 14 днів тому +4

      If u r not a civil engineer pls remember that while designing they do the traffic surveys and consider a factor to cater the future traffic..so no need to worry

  • @bagrisapna
    @bagrisapna 14 днів тому +41

    I spend 3 hours everyday to reach veerasandra from Banashankari 2nd stage. Eagerly waiting for the inauguration, it will ease my life and I will be with more energy to play with my son on return.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @Sandeep-sg8dk
    @Sandeep-sg8dk 14 днів тому +66

    biggest flyover traffic in the world opening shortly :-)

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 14 днів тому

      I read this as - traffic on flyover opening shortly.
      See my comments below.

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 14 днів тому +4

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      ​@@krishnankuppaswamy7553Exactly

    • @chaluvadigowtham7573
      @chaluvadigowtham7573 13 днів тому

      ​@@krishnankuppaswamy7553😢😢😢😢 true

  • @ShreyasBharadwaj
    @ShreyasBharadwaj 13 днів тому +21

    Everyone is excited about the flyover, I'm excited about a journalist with accurate Kannada diction 🙏

    • @ptj1ptj172
      @ptj1ptj172 10 днів тому +3

      Which is why they are journalists

    • @ashokp9260
      @ashokp9260 6 днів тому +1

      Ok u are excited about the kannada.. not the news!!.. en guro idhu!😂

  • @akshayleo3
    @akshayleo3 14 днів тому +107

    Excellent video as always!
    Thanks for the update 👏
    Nobody covers Namma B'gluru like DH.

    • @siddharthtiwari4546
      @siddharthtiwari4546 14 днів тому +3

      @@akshayleo3 DH is the best media ever

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      ​@@siddharthtiwari4546Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @DeccanHerald
      @DeccanHerald  13 днів тому +3

      Much appreciated!

    • @movieteamkannada7669
      @movieteamkannada7669 13 днів тому

      Namma bengaluru is only for kannadigas not for outsiders.

  • @deepakkudalkar3006
    @deepakkudalkar3006 14 днів тому +12

    Awaiting for the opening of this flyovers. Thanks for making such a detailed video on this

  • @sugunrajiv5404
    @sugunrajiv5404 13 днів тому +3

    More than the new flyover constructed ,I really appreciate the way you, Madam, explained the details!! GREAT AND CLEAR !!
    👌👌👌👌👌👏

  • @mgspec
    @mgspec 14 днів тому +10

    This is definitely a good bypass surgery for namma silk board traffic problem!! Hope the up ramp and down ramps don't get blocked with piled up traffic.. Important to maintain the uniform traffic flow.
    Some traffic cops manually allow one side 10 minutes and this results in cascading of traffic for all other sides. Very important to maintain traffic flow in all directions!

    • @sowmyaacharya8618
      @sowmyaacharya8618 12 днів тому

      @@mgspec bommanahalli HSR new nightmare in the making

  • @MrVSMANI
    @MrVSMANI 14 днів тому +29

    Good news! Hopefully the quality of construction will meet the standards.
    True colours will come out after six months.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KaaruMYA
      @KaaruMYA 13 днів тому +1

      Karnataka construction is better than BJP supported Nitish Kumar's Bihar construction. 😂
      Hopefully, it is better than Ram Mandir newly constructed roads 😅

  • @adyar78
    @adyar78 14 днів тому +8

    Very well presented Udbhavi. You have a beautiful smile and may that smile reflect on the public, once the flyover is open.

    • @udbhavibalakrishna3416
      @udbhavibalakrishna3416 11 днів тому

      Thank you so much!

    • @mathewrajan8514
      @mathewrajan8514 9 днів тому

      Probably she suffers from the csb traffic every day. This is a dream come true moment,but I really hope this is enough

  • @priyabratadash1833
    @priyabratadash1833 14 днів тому +6

    This is my 2nd home in Bangalore silk board junction is like the most historic place in my heart all is going to change am emotional.

  • @Saif_Ali_Khan_1301
    @Saif_Ali_Khan_1301 14 днів тому +1

    Well done 👏🏻 that's how reporting should be done in detail and efficient manner. Kudos 👏🏻

  • @Divyanavin
    @Divyanavin 14 днів тому +56

    Silk board signal is an emotion

    • @gawdpromaxultra703
      @gawdpromaxultra703 14 днів тому +11

      That emotion is sadness and anxiety

    • @MO-fg2cm
      @MO-fg2cm 14 днів тому +1

      Why ? are you a chakka clapping for money at silk board signal ?

    • @vizdrom
      @vizdrom 13 днів тому +4

      Because for traffic there is no motion

    • @KResu-nc8bk
      @KResu-nc8bk 9 днів тому

      Road infrastructure has been completely chaos and messed up by Congress.
      Congress ideas are worse .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      About CONGRESS projects which are senseless.
      1. FYI, Metro tunnel connect to entire city.
      So Tunnel roads are not conducive for entire city.
      whereas entire city road infrastructure is worst of worst.
      2. Tunnels roads are meant to use only a few for certain smaller areas .
      3. Metro tunnel doesn't not create bottleneck in the corner, unlike tunnels.
      Tunnel roads creates messy in the tunnel road corners.
      complete traffic jam in
      the Tunnel corners.
      4. there are many more issues of feasibility
      Best SOLUTION are:
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      Utter nonsense n newsense ideas of Congress

  • @viswasparameshiah8680
    @viswasparameshiah8680 14 днів тому +28

    While this is a great improvement over the existing conditions, Deccan Herald ( @DeccanHerald )should do a video to highlight the atrocities of the private & public buses who stop to pick up passengers at the beginning of the Hosur Road (near to Silk Board junction) leading to Electronic City. Even at 12 in the night there are jams caused by these buses who stop most of the times middle of the road leading to traffic jams and at times I have witnessed people fighting over to pass these buses. Wonder why traffic police department & media is giving a blind eye to this situation.

    • @01abhinavrajput
      @01abhinavrajput 14 днів тому +1

      Obviously because they dont care. They know nobody will question them. As soon as somebody questions them, there will be many idiots who will ask them to go back to their state.

    • @thenameisrizwan
      @thenameisrizwan 14 днів тому

      Well said on the private buses thing, they are a nightmare for the road users . Those buses stop in the main carriageway literally blocking one lane completely, and these stops continue till almost after agara lake.. really pathetic state of things

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @senthilkumarvenkatachalam2974
      @senthilkumarvenkatachalam2974 13 днів тому +1

      where should they pickup the passengers then? in hosur?

    • @KResu-nc8bk
      @KResu-nc8bk 13 днів тому +1

      @@senthilkumarvenkatachalam2974 They need to have 2 more new Bus terminals nearby Silkboard area.

  • @nandeeshrai5234
    @nandeeshrai5234 14 днів тому +2

    Loved the coverage.

  • @arunkumar-pb8gh
    @arunkumar-pb8gh 8 днів тому

    Super proud of reporters like you 👌...Factual narration and at the same time keeping it simple . Otherwise the kind of media people today just shout ! shout !! and shout only 😂😂

  • @chowdarypothula4233
    @chowdarypothula4233 14 днів тому +11

    We are just moving trafic jam problem from silk board to Ragi guda. After making ORR signal free, we just made some places worst. All the traffic comes to those bottleneck areas. All the traffic comes to these areas and we don't find anything useful. The complete circle should be signal free.

    • @prismaticindia9046
      @prismaticindia9046 14 днів тому +1

      Next Banashankari area on the oiter ring road needs to be made traffic jam free. It is too messed up.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      ​@@prismaticindia9046Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @shamikbera9617
      @shamikbera9617 13 днів тому

      We can conclude that building more roads doesn’t solve traffic problems. It will only make it worse due to induced demand.

    • @prismaticindia9046
      @prismaticindia9046 13 днів тому

      @@chowdarypothula4233 those coming from agara lake should have signal free ride at the silk board. And from silk board to banashankari the entire route needs to be made signal free. For all the crossings and signals in that route there should be option to use fly over or to get down from the fly over. Without this comprehensive solution even if one signal is blocking on the route then it can cause bottle necks from the banashankari busstand to agara. At banashankari the flyover/underpass should be constructed for those who want to go to banashankari nagar or padmanabhanagar.

  • @stephendsouza7969
    @stephendsouza7969 14 днів тому +23

    Finally some relief for commuters. Hope it will ease the traffic congestion. urge people to use more public transport and hopefully when metro opens it will be much better. Transport dept should start feeder busses from metro station to near by areas to ease the public connectivity. lets make namma bengaluru better.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @movieteamkannada7669
      @movieteamkannada7669 13 днів тому

      Namma bengaluru is only for kannadigas. Before calling namma bengaluru first learn kannada

    • @stephendsouza7969
      @stephendsouza7969 13 днів тому

      @@movieteamkannada7669 hello. Thamma Bengaluru huduga nannu. Born and brought up in Bangalore. Madiwala don Kano. KRV and Jai Karnataka associate. Namma Bengaluru.

    • @hemalpatil2152
      @hemalpatil2152 13 днів тому

      @@movieteamkannada7669 first you idiots cry about a person not speaking Kannada. Then when someone tries to make Bengaluru their own, you try to gatekeep it by spewing such ignorance. Keep your elitist attitude to yourself and go cry somewhere else.

  • @sheshadrivenkatadri6427
    @sheshadrivenkatadri6427 13 днів тому +1

    Kudos and more power to DH for covering topics most relevant to Bangalore!

    • @KResu-nc8bk
      @KResu-nc8bk 9 днів тому

      Road infrastructure has been completely chaos and messed up by Congress.
      Congress ideas are worse .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      About CONGRESS projects which are senseless.
      1. FYI, Metro tunnel connect to entire city.
      So Tunnel roads are not conducive for entire city.
      whereas entire city road infrastructure is worst of worst.
      2. Tunnels roads are meant to use only a few for certain smaller areas .
      3. Metro tunnel doesn't not create bottleneck in the corner, unlike tunnels.
      Tunnel roads creates messy in the tunnel road corners.
      complete traffic jam in
      the Tunnel corners.
      4. there are many more issues of feasibility
      Best SOLUTION are:
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      Utter nonsense n newsense ideas of Congress

  • @myownperfectdisaster
    @myownperfectdisaster 9 днів тому +1

    Well done! This is some neat reporting

  • @jeethuutube
    @jeethuutube 14 днів тому +12

    Great! More traffic dumped into silkboard direct

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @harish123az
      @harish123az 9 днів тому +1

      How is it "more" traffic? And its not being dumped to silk board, all are avoiding it and going over that to other stops.

    • @madhuguru3130
      @madhuguru3130 6 днів тому

      @@harish123az Until Electronic city to Marathahalli side is cleared I am thinking this won't solve much because the problem is that route.

    • @harish123az
      @harish123az 6 днів тому

      @@madhuguru3130 Exactly, I agree, this is focused on the other side which was never a huge problem.

  • @vijayakumarbs8578
    @vijayakumarbs8578 14 днів тому +6

    Coming from E-City side, there’s no up-ramp to take Ragigudda flyover. This represents a missed opportunity and a failure in design. Without this connectivity, congestion at Silk Board Junction persists.

    • @vishruthkm4675
      @vishruthkm4675 14 днів тому +3

      There is free left turn hence they might have not considered ramp

    • @PavanKumar-rg8cd
      @PavanKumar-rg8cd 14 днів тому

      True, even after designed this much big flyover, they missed ramp down/up between Silkboard and ragigudda. A very bad design, or not thinking holistically.

    • @harshaldesai5393
      @harshaldesai5393 14 днів тому

      I think there is a ramp up right before Silkboard metro station after taking the free left at silk board

    • @yourbff1484
      @yourbff1484 14 днів тому

      India has free left turn on major roads and it's no brainer to have up ramp

    • @rrarjun8
      @rrarjun8 14 днів тому

      It's there in the design in front of the silk board gate or just after silk board metro building via btm
      Not yet started the constitution..

  • @darlingdileep3971
    @darlingdileep3971 14 днів тому

    Fabulous you are doing 😍 fantastic happy to see you 😊❣️ on this way profuctly talking sence good explanation at all thank you

  • @guruprasadbombore3879
    @guruprasadbombore3879 14 днів тому +5

    When is the final opening date?

  • @chowdarypothula4233
    @chowdarypothula4233 14 днів тому +3

    Please make some video on kanakapura ORR junction. Every small road has flyover like delmia circle, JP nagar 6th phase road, devegowda petrol bunk road. I don't know why there is no flyover at kanakpura road. Some footpath extension work has started which decongests the road.

  • @PRAKASHKULKARNI-pq5jy
    @PRAKASHKULKARNI-pq5jy 10 днів тому

    It will certainly make life of the silk board signal users much more easier. Congratulations!!!

  • @rajeshhs8
    @rajeshhs8 14 днів тому

    Thank you for the details!! This is more worth waiting all this days😂

  • @siddharthtiwari4546
    @siddharthtiwari4546 14 днів тому +33

    Bangalore is going to change very soon completely after the metro work completion is done
    Traffic congestion will reduce public will be happy to use metro instead of any public transport

    • @shreyass5664
      @shreyass5664 14 днів тому +4

      DEFINITELY Bengaluru will come out of this traffic issue very soon already it is improved from 2 to 6th position in tom tom index.😊 Let us help the city to solve the traffic issue and bring back its glory which has given life to many people😊❤BLR

    • @siddharthtiwari4546
      @siddharthtiwari4546 14 днів тому +4

      @@shreyass5664 Yes for sure , I'm not kannada but atleast I can help here to decrease traffic congestion..
      Where atleast ambulance shouldn't get stuck
      We can all take Bengaluru as no.1 city

    • @shreyass5664
      @shreyass5664 14 днів тому

      @@siddharthtiwari4546 Let us make 1% change in our driving habits like following lane discipline, not stopping on zebra crossing etc it will help in long way.👍A true bengalureans dream is BLR should become like Singapore one day .Let us not waste the 35yrs of hardwork the city has come this level let us all support and help each other and take the city to next level BLR 👍

    • @alexsmart2612
      @alexsmart2612 14 днів тому

      And unicorns will fly amongst rainbows of colors in a valley of flowers.

    • @siddharthtiwari4546
      @siddharthtiwari4546 14 днів тому

      @@alexsmart2612 Bengaluru city special flower which is 🪷

  • @abhishekn9871
    @abhishekn9871 14 днів тому +11

    Hope they do something for Goraguntepalya junction as well...

    • @madhusudang8433
      @madhusudang8433 14 днів тому

      For that u can't build any flyover. Only solution is underground tunnel.for.ring road so.veichles in ring road flow without issue

    • @abhishekn9871
      @abhishekn9871 14 днів тому +1

      @@madhusudang8433 they could've planned underpass many years ago but they didn't...

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      ​@@madhusudang8433Underground tunnel is Utter nonsense.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      ​​@@madhusudang8433
      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      ​@@abhishekn9871Well said

  • @amruthkesari3440
    @amruthkesari3440 10 днів тому +2

    The emphasis should be on public transport. Unless citizens don't show interest in public transport and keep traveling in their own private vehicles, no flyovers will help. One bus can remove around 20 to 30 vehicles from the road it plies on. Imagine the impact of just 10 buses.
    The government should push people to take public transportation as the primary means of commute. With Metro line almost ready, the government should now think about point to point accessibility. Shared auto/cabs, car pooling and more importantly private buses should be allowed to operate. If women are allowed free bus rides through out the day, I don't think there is going to be much harm in allowing free bus for everyone during peak 2 hours in the morning and another 2 hours in the evening in select routes only.

  • @satishk759
    @satishk759 13 днів тому

    Amazing construction hopefully ease traffic congestion and help people to decrease stress and pollution!! Nice presentation 😊

  • @siddheshshivraj3534
    @siddheshshivraj3534 14 днів тому +2

    Hopefully it doesnt collapse on itself like many wonderful infrastructure we have.

  • @sohanthkumar6170
    @sohanthkumar6170 14 днів тому +7

    Bangalore has the best of busses within city. Only thing they need to improve is frequency and timetable. No other state has so many busses for public transport.
    People just want to show off their cars on the road. Especially IT employees go to office in a suv while being alone. Then complain that they have too much traffic. If all employees go to office in 2 wheelers or pool(Indian sentiment will not allow this) this will reduce traffic by 30%. Some companies do not provide cab facilities as well as it is cost for them and bad for business. I can take names of such companies if someone challenges me. Also, WFO is made compulsory atleast for 3 days. Whereas before lockdown also these companies didn't have any fixed WFO days. There was no restriction before on how many days you work from home/office. I think people from govt are forcing companies to make this rule. Collaboration is all bullshit that these companies make up. I know a lot of them who just go to office, swipe and come back. This will just increase revenue for govt. Vehicle registration, rent, property taxes. Growing city= more investments= more options for corruption= more slaves. I have no shame in telling that Bangalore will be home of the homeless and rowdies in future.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @sugumarmukambikeswaran8449
      @sugumarmukambikeswaran8449 12 днів тому +1

      But it is only for short distance. For example if you want to go to jayanagar from bannarghatta road there is no straight bus. You have to get down at Gopalakrishnan mall and walk on km to catch bus to jayanahar. There are no buses to cover long distance in bangalore.

    • @KResu-nc8bk
      @KResu-nc8bk 12 днів тому +1

      @@sugumarmukambikeswaran8449 Exactly. totally nonsense service.

    • @KResu-nc8bk
      @KResu-nc8bk 12 днів тому +1

      @@sohanthkumar6170 Only you have to say so.

    • @KResu-nc8bk
      @KResu-nc8bk 12 днів тому +1

      @@sohanthkumar6170 You are naive person

  • @nandanbellare6445
    @nandanbellare6445 14 днів тому

    Informative video, thank you.

  • @abhiishot2007
    @abhiishot2007 14 днів тому +5

    Bengaluru will always be full of traffic. Karnataka should start two child policy urgently and tell all companies to stop giving jobs to families having more than 2 kids

    • @ApulicaOfficial
      @ApulicaOfficial 14 днів тому +7

      what nonsense

    • @rrarjun8
      @rrarjun8 14 днів тому +2

      Not only Bengaluru,all major cities in India have traffic.. don't blame our Bengaluru..

    • @abhiishot2007
      @abhiishot2007 14 днів тому

      @@ApulicaOfficial So do u love to get stuck in traffic if u are in an ambulance?

    • @movieteamkannada7669
      @movieteamkannada7669 13 днів тому +1

      ​@@abhiishot2007first non kannadigas should move out from bengaluru

  • @sauravjaiswal2204
    @sauravjaiswal2204 14 днів тому +3

    Current congress Freebies rewadi government is worst ..... Busy in making money and appeasements Politics 🤐🤐🤐🤐🤐
    We middle class hard tax payer are not getting anything 🤒🤒🤒🤒

  • @PolitiVoyager
    @PolitiVoyager 8 днів тому

    Finally, a big relief for daily commuters. 👏🎉

  • @guruprasaddattatribhatt6164
    @guruprasaddattatribhatt6164 13 днів тому +2

    ಪ್ರಜಾವಾಣಿ ಡೆಕ್ಕನ್ ಹೆರಾಲ್ಡ್ ವಿಡಿಯೋ ಗಳು ವಿವರಣೆ ತುಂಬಾ ಚೆನ್ನಾಗಿರುತ್ತೆ

  • @prithvi1225
    @prithvi1225 14 днів тому +3

    All because of non native people

    • @SebinMatthew
      @SebinMatthew 14 днів тому +1

      This is one country. Even you are not native to Bengaluru. Your ancestors might have come from some rural place to Bengaluru. Just because your family did it a few generations ago does not make you native.

    • @prithvi1225
      @prithvi1225 14 днів тому

      @@SebinMatthew my ancestors are #KANNADIAGS from here ಬೆಂಗಳೂರು.. yes one country we all are in, but we'll are one family but in a different house's 🏡 yet I don't go to others home's whine about their 🏡... Bengaluru is for Karnataka native people just like howz Cochin is for Kerala, Chennai for Tamil nadu etc.... you learn Kannada pal

    • @madhuguru3130
      @madhuguru3130 6 днів тому

      Right... people whom you hire because it's too expensive to hire locals.

    • @madhuguru3130
      @madhuguru3130 6 днів тому

      ​@@prithvi1225 outsiders build this city. Locals only complain about outsiders.

    • @prithvi1225
      @prithvi1225 6 днів тому

      @@madhuguru3130 that's what people do when they've been hired by native owners

  • @sachinhj9910
    @sachinhj9910 14 днів тому +1

    In love with the anchor❤

  • @tronzi2131
    @tronzi2131 14 днів тому +1

    This is what a coverage should look like ❤❤ nice work

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @udbhavibalakrishna3416
      @udbhavibalakrishna3416 11 днів тому

      Thanks for watching!

  • @jatind3
    @jatind3 13 днів тому

    Excellent video. I travel between Bannerghatta road and HSR so this DD flyover is definitely going to help. Even if half the traffic currently passing thru BTM just to go towards Electronics city/Sarjapur road used this flyover, it will help decongest BTM layout and Silk board signal.

  • @shaabdulmanan9980
    @shaabdulmanan9980 14 днів тому +1

    Great work DH

  • @ramalingamdara6262
    @ramalingamdara6262 7 днів тому +1

    I suggest you to play old situation video and the present one. That keeps viewers recognize benefits and your efforts of covering the event. I congratulate your channel for the efforts.

  • @girishkumarbkable
    @girishkumarbkable 14 днів тому

    Awesome coverage by Deccan Herald. I like their details from birds eye view, markings ... very nice. Next Bannerghatta road metro ...please.

  • @manishjha4224
    @manishjha4224 14 днів тому +1

    Fastest and most exclusive report. Appreciate journalism

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @udbhavibalakrishna3416
      @udbhavibalakrishna3416 11 днів тому

      Thanks for watching!

  • @tvm73836
    @tvm73836 14 днів тому +2

    I hope they have constructed this well and followed all the safety norms. Given the high level of corruption with any Karnataka government the contractors have very little profit margin so they then to cut corners during design and construction

  • @prasulpradeep
    @prasulpradeep 14 днів тому +1

    Great coverage

  • @Dnabkhz
    @Dnabkhz 11 днів тому

    thank you for making video, i love big infra

  • @anuragpandey2635
    @anuragpandey2635 9 днів тому

    Really great to see this finally being open.. Great work govt.

  • @sjunjur
    @sjunjur 8 днів тому

    Silk board junction has improved a lot, I had visited this double decker flyover.

  • @sanjayng3233
    @sanjayng3233 13 днів тому

    happy to see the new #double decker flyover access.
    now, we can say that crossing of silk board traffic will not be under acheivement category.
    appending vehicles and pollution, even the people also should be concerned about controllong the pollution by using eco frendly vehicles like eletric and bicycles to cummute in the banglore traffic.
    once agian, looking forward to see smooth flow of traffic in and near silkboard junctions

  • @sawannanjappa1942
    @sawannanjappa1942 14 днів тому +2

    Nice video…. Showing critics at the end that this double decker flyover has taken 2 years to years to complete….. which also includes a metro line .. was a nice touch …
    Can you please make a video on the flyover being constructed on Ejipura junction…. Where commuters are struggling from a decade to cross Sony world signal …… between those pillars there are called “stone henge” of Bangalore….

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Completely half information.
      Mostly old information as well.
      Nothing details. UA-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @sampathacharya1285
    @sampathacharya1285 14 днів тому

    Informative 😊

  • @ganeshks9344
    @ganeshks9344 4 дні тому

    Always DH is covering the bangalore things with very informative

  • @achuthanp464
    @achuthanp464 14 днів тому

    Very good. Thanks to the authorities. It saves not only time but also Fuel in lacs of litters.

  • @pandian.esakki
    @pandian.esakki 10 днів тому

    Excellent news, waiting for the opening!

  • @krishnakumarmenon5879
    @krishnakumarmenon5879 12 днів тому +1

    Well presented and explained by Balakrishnan

  • @DharaneeshKH
    @DharaneeshKH 14 днів тому +1

    Excellent report ! And you have such a beautiful smile 😊.. Pleasure to watch your report 👍

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @rajavishnuvardhana6830
    @rajavishnuvardhana6830 14 днів тому +1

    God please make it soon❤

  • @shankar49677
    @shankar49677 14 днів тому

    Very much. Coming from outside Bengaluru last week, i left at 5 am so that i cross this junction. While entering i took 3 hours to reach Hennur Road from Electronic City.

  • @khajajirazak607
    @khajajirazak607 12 днів тому

    Beautiful , coverage.

  • @mohanbabupm5778
    @mohanbabupm5778 14 днів тому

    Useful information by the speaker hefty thanks to the bridge engineers who had deployed the prestressed techniques worked day and night toiled hard which had translated into reality which is there to see for everyone kudos to govt of Karnataka this double decker technology will reduce the traveling time of the bridge users

  • @piyushgaurav4368
    @piyushgaurav4368 14 днів тому +2

    Hey DH Team , Consider covering the Mayhem/Jam at Balagere road - Limbavali Underpass. It is a huge issue impacting a wide number of population living in Varthur, Balagere Road..

  • @AllMidis
    @AllMidis 12 годин тому

    I have my colleagues commuting using this Flyover and they feel much relieved

  • @sparshgoil3768
    @sparshgoil3768 14 днів тому

    Amazing!!!

  • @palasaiteja3324
    @palasaiteja3324 13 днів тому +1

    That intro was great😂😂😂😂

  • @noorulameen4605
    @noorulameen4605 10 днів тому

    Execulent coverage well done

  • @MohammedHaris-z5i
    @MohammedHaris-z5i 13 годин тому

    It already has worked wonders 😁

  • @Boykajjk
    @Boykajjk 13 днів тому

    You guys amazing❤

  • @kiranks1984
    @kiranks1984 12 днів тому

    nice one DH! Surprised that no ramp for entry from BTM towards ragigudda....the ramp from hsr to btm seems redundant at the same time....time will tell...and ofcourse like few have already pointed it out, ragigudda and banashankari signal will be the new bottlenecks

  • @krs-ramaswamy9406
    @krs-ramaswamy9406 11 днів тому

    Hope the traffic will improve

  • @KaaruMYA
    @KaaruMYA 14 днів тому

    Definitely it will help in reducing traffic congestion. Waiting to open.

  • @AbhishekSingh-oy5lv
    @AbhishekSingh-oy5lv 13 днів тому

    This helps, nice video

  • @panchuiyer
    @panchuiyer 14 днів тому

    Hi congrats for making a excellent video which is very informative. However even though the the travel time gets reduced to few minutes between Raghigudda and Silk Board, it will be a big bottle neck at the exit in both sides.

  • @mathematicalninja2756
    @mathematicalninja2756 14 днів тому +1

    What a beautiful host ❤

    • @KResu-nc8bk
      @KResu-nc8bk 14 днів тому +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @inculding1974-x6d
    @inculding1974-x6d 12 днів тому

    Good news for the builder

  • @sanjaysharma9761
    @sanjaysharma9761 13 днів тому

    Good coverage. Now it's clear after your report about Double Decker. Other wise I was new person. So fully confused. How is Double Decker

  • @arjunkg7207
    @arjunkg7207 2 дні тому +1

    The anchor is cute though! :P

  • @padmanabhas3676
    @padmanabhas3676 14 днів тому

    Informative video

  • @ajaychebbi
    @ajaychebbi 13 днів тому

    This is great!! will help reduce the traffic below for people travelling to Madivala from BTM.
    BTW can the BMRCL take over the Ejipura flyover 😀?

  • @LearnNgrow_12
    @LearnNgrow_12 12 днів тому

    Great News 🔥

  • @manjunathams8865
    @manjunathams8865 9 днів тому

    Reporter❤👏

  • @virupakshagowda8375
    @virupakshagowda8375 14 днів тому

    Yes it really helps and reduces traffic load in CSB junction

  • @Pradeep_rides
    @Pradeep_rides 12 днів тому +1

    I can go meet my friend from HSR sector 1 to Ragigudda in minutes, which usually takes 30 to 40mins now.

  • @girishbharatwaj90
    @girishbharatwaj90 8 днів тому +1

    As far as people have self disciplined driving culture , no bridge or double decker can help the state! 😂

  • @lharikrishna2011
    @lharikrishna2011 11 днів тому

    Looking similar video for panathur underpass road problems and solutions

  • @karthikmurali6012
    @karthikmurali6012 11 днів тому +1

    So many negative comments. Lets be optimistic 🙂. Been working in Bangalore for 15 yrs now. The people influx is insane. The city was never built for so much people. Lets support the gov and do more from our side also. I see people going to office in innova with just one person driving. Lets do our bit and push the gov to do faster work 😊

    • @madhuguru3130
      @madhuguru3130 6 днів тому

      Government doing very well banning carpooling apps (yes that was sarcasm). People are negative because whatever little we get in the form of civil infrastructure is late, over budget and misses one or two things.
      Roads are a mess across the city with drilling work constantly ruining good roads. Flyover roads have potholes. Sarajapur Junction has no flyover for traffic going from silk board to marathahalli, so genius traffic policemen opened a lane on the flyover coming from marathahalli to silk board... which is slower than the lower level traffic going through the sarjapur signal.

  • @proteemmukherjee5405
    @proteemmukherjee5405 12 днів тому

    I travel every day through silk board lol it's just another hour of my day gone lol.. I am used to it now

  • @YuvanBalaji
    @YuvanBalaji 12 днів тому

    Diverting traffic to Marathahalli, Well done!!

  • @kavithadeshpande3383
    @kavithadeshpande3383 14 днів тому

    Also am in good agreement with Mr. Sharat Ramachandra's and Mr. Viswas Parameshaia's genuine observations.

  • @azadlaxman1
    @azadlaxman1 10 днів тому

    Very excited

  • @sujitkumarsingh3200
    @sujitkumarsingh3200 8 днів тому

    I didn't know that Bansankari to Silk board metro line has as road as well.
    Informative video 🎉

  • @amolsinha
    @amolsinha 11 днів тому

    As of now it will help modestly to my commute from ecity to bellandur

  • @adthya9209
    @adthya9209 14 днів тому +1

    I hope all 600 series BMTC will use this ramp to turn right at silk board towards Hosur road .. during peak hours the jam often goes for 30mins+

    • @EeyyWakee
      @EeyyWakee 14 днів тому

      I think I saw a height restriction barrier, so buses won’t go on the flyover.

  • @arunmoh
    @arunmoh 8 днів тому +1

    today there a huge jam in front of the ecity ramp.. the design should have had a ramp directly connecting to ecity fly over.. i think traffic will only increase