  • We scheduled the footing inspection for Thursday, and now we have three days to get ready! All 24 Rebar cages need to be placed and secured in the holes prior to inspection. Rebar cages need to be finished. We have to install 3" rebar chairs on the bottom of each cage. The cages will sit on these chairs and it will keep the rebar 3" from the surface of the ground to meet code. The rebar cages must be secured in place for the inspection. We build 24 fixtures out of 2x4s to secure the rebar cages in the center of the holes. Justin works a full time job and Lil runs the homestead and homeschools, so we work under moonlight and spiders to get it done. Will we get everything done in time to pass our first building inspection?

КОМЕНТАРІ • 22

  • @ModernMountainLiving
    @ModernMountainLiving 10 місяців тому +1

    It suprises me how many don't know code regarding rebar and ground contact. Nice job

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому +1

      Thanks, I'm just trying to go by the book.

  • @loucinci3922
    @loucinci3922 10 місяців тому +1

    Good man taking care of family and working late to make it happen. Holding down the 9-5 AND working on the homestead will be so worth the effort. Thanks for sharing.

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      Thanks, it's not easy!

  • @USA-GreedyMenOfNoIntegrity
    @USA-GreedyMenOfNoIntegrity 10 місяців тому +1

    Looking great.

  • @joshuacross7717
    @joshuacross7717 10 місяців тому +1

    Love the videos!! Keep em coming! How big is your home going to be?

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      Thanks! It will be about 1600 sqft, single story.

    • @joshuacross7717
      @joshuacross7717 10 місяців тому +1

      Awesome!

  • @loucinci3922
    @loucinci3922 10 місяців тому +1

    What if you get a 4' length of galvanized steel pipe to extend the rebar cutter handle. Maybe momma will have an easier time snapping through the rebar. Just a thought.

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      It's all good, we are finished with the rebar and moving on to the next phase.

  • @centexan
    @centexan 10 місяців тому +1

    Why not just start off with sonotubes at the finished height you're going to need?

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      That was the plan originally, but it just worked out easier logistically for us to split it into two pours. I was going to need two trucks anyways to get the amount of concrete I needed and the holes were already dug and ready to pour. I also wanted to see how the first inspection went so this was a perfect opportunity to see how it would go. I was also concerned about being able to fit the truck in between rows and possibly causing holes to cave in. If things went wrong it would have been a lot easier to fix without the tubes already installed.

    • @centexan
      @centexan 10 місяців тому

      @@DIY_or_DIE I hope you are using a bonding agent between layers. Hate to see problems down the years with water seeping in between the two layers.

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      I guess time will tell! Have you experienced that problem before?

    • @centexan
      @centexan 10 місяців тому +1

      @@DIY_or_DIE Not in a foundation pier. Saw it on a slab that was added to part of an existing slab.

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      @centexan ahh, gotcha. Well I can understand that for sure, but these piers and footings are tied together with the rebar so I don't think it will be an issue.

  • @rkeantube
    @rkeantube 10 місяців тому +1

    dude get a lazer level will save you lots of time

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      Which application would you use it for?

    • @rkeantube
      @rkeantube 10 місяців тому +1

      @@DIY_or_DIE leveling the pier and floor, you would not need to do lines and work around them, and squaring things to each other

    • @DIY_or_DIE
      @DIY_or_DIE  10 місяців тому

      Stay tuned and you'll see more laser leveling. I also used it for setting the Batter Boards. Didn't need it for setting the rebar because I had already squared my center lines.