Hornby Pendolinos running as they should?

Поділитися
Вставка
  • Опубліковано 15 вер 2024
  • Hornby Pendolinos running as they should at a scale speed of 125mph. British rail Class 390. I have 4 sets running on two tracks with 2 DC controllers with a total of 40 coaches on my OO gauge loft model railway. This is how trains should run. Enjoy, kind regards, Philip

КОМЕНТАРІ • 57

  • @henryjones6693
    @henryjones6693 4 місяці тому +9

    Hi Phillip, the camera point of view is great to see how quick the trains are really going. Great video!

  • @tjfSIM
    @tjfSIM 4 місяці тому +5

    Never ceases to amaze me how much you achieve with just DC control. And a lovely fleet of Pendolinos!

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +3

      DC does have its advantages and I over voltage them for extra speed. Thankyou, my favourite trains

  • @paulrb894
    @paulrb894 5 місяців тому +6

    A Hornby APT would look superb zooming around your layout. Cheers 😊

  • @ewhurstgreen
    @ewhurstgreen 4 місяці тому +4

    Thank you Philip! 👍
    Travelling south a few years back the tilt failed just north of Tebay.😒
    While we were awaiting authority to proceed without tilt, I naively asked the Polmadie driver
    _'Does the tilt fail very often?'_
    "Well, when an 87 failed it was something to talk about back in the depot".
    "When a Pendolino doesn't fail it is something to talk about back in the depot" 🤔

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +3

      Sadly true. They should have got Hornby to make them all

    • @ewhurstgreen
      @ewhurstgreen 4 місяці тому +1

      @MrMiller-vc5rv When the tilt fails, after informing the signalman it takes about ten minutes to obtain authority to proceed without. At busy times NRIL will not want the train blocking the line so will be keen to get it moved out of the way quickly.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +2

      A few people have told me their nightmare Pendolino journeys

    • @ewhurstgreen
      @ewhurstgreen 4 місяці тому +1

      @@model.train.railway. Despite using TGVs with regularity my partner tried one once from Manchester to London - she was quite unwell when she arrived.... 🥴

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      My brother who is really into trains feels seasick on Pendolinos.

  • @Proper_Chuffed
    @Proper_Chuffed 4 місяці тому +2

    Hello Phillip, just discovered your channel, what a stunning layout! Great video and nice bit of history. Subscribed 👌😎

  • @monsvillerailways5736
    @monsvillerailways5736 4 місяці тому +2

    Nice Session Phillip.
    DC is still a lot of fun and definitely the way to go for someone new to the hobby in my mind.
    Happy Modelling
    Mon

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +2

      It is nice and easy and much cheaper and can run many trains at the same time.

  • @Jasper_4444
    @Jasper_4444 4 місяці тому +2

    3:33 "I was too busy filming to watch the trains." - Quote of the day. 😊 👍
    Don't get me wrong, I do understand what you mean. Still it's hilarious.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +2

      I sometimes lose control of things, but the good thing is the Pendolinos can catch up with each other without crashing.

  • @alexdrennan6185
    @alexdrennan6185 4 місяці тому +2

    absolutely lovely video

  • @CliveWherrell-qz2ui
    @CliveWherrell-qz2ui 4 місяці тому +2

    Love the sound of those pendolinos at speed.

  • @ianmccarthy2733
    @ianmccarthy2733 4 місяці тому +1

    Really Great videos

  • @samstergti9812
    @samstergti9812 4 місяці тому +1

    Great Video!
    Too add realism, announce a signalling issue and a replacement bus service 😂

    • @model.train.railway.
      @model.train.railway.  4 місяці тому

      On some of the other levels there are two signals are not working properly and 3 people have pointed it out. I just run through red.

  • @OOElectronics
    @OOElectronics 4 місяці тому +2

    Very impressive. I travelled many, many journeys on the 1:1 versions between Glasgow and London.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      Thankyou. I have never been on one yet

    • @OOElectronics
      @OOElectronics 4 місяці тому +1

      I was nearing the end of going to London regularly when Virgin lost the franchise; the replacement was nothing like as good in terms of value and service. Rolling stock still good of course.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      Interesting to know

  • @Razer_-fe9mo
    @Razer_-fe9mo 4 місяці тому

    Some great shots in here! Great job!

  • @jonelson1983
    @jonelson1983 4 місяці тому +2

    Cool....they are fast!

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      I do run much faster sometimes, but it is nice to just nice to leave them running on their own as a realistic speed.

  • @tomlee9534
    @tomlee9534 4 місяці тому +3

    I’m interested to hear your reasons for wrong line running.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      All of my lines are built so that they can be turned into one continuous line, but to do this requires a compromise so what is wrong line running for one track is correct for the the others it just so happens my track 6 and 7 are reversed. I had very steep gradients to go up between lines as well.

  • @chrisuddin9760
    @chrisuddin9760 4 місяці тому +2

    Nice video it's a very good look you have with all those. I'm Interested to know how much did all those pendolinos cost you?, I'm interested in doing an 11 car but how can I do the car that looks like it has the pantograph part at the top but doesn't have the pantograph if you know what I mean??.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      All were second hand and most of the coaches were about £18. The see second hand price is much higher now

    • @model.train.railway.
      @model.train.railway.  4 місяці тому

      Some of my pantographs have dropped off. Another job that needs going

  • @jonsloftrailway
    @jonsloftrailway 4 місяці тому

    I like the specially adapted Go Pro camera - want to do something like that myself eventually

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      There are better newer designs, but it is nice to watch your own trains from a different angle.

  • @SpringCottageModelRailway
    @SpringCottageModelRailway 4 місяці тому +1

    Great video I like the speed. How do you keep all your track clean? I would like a video on that if you have special techniques!
    David

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      I use a CMX cleaner wagon. There is a whole video I did recently if you want to see it. kind regards. Philip

  • @stewartshackleton7825
    @stewartshackleton7825 4 місяці тому +1

    Love the video. I have a loft layout - much smaller than yours. My Pendolino drive bogie quite often drops off the track. The bogie itself has always seemed quite loose and I have tried different ways to fix it. I use Hornby 400 controllers. Any thought please? Thanks.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      How steep are your corners, I found that if 3rd radius is not perfectly flat, you get problems.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому

      But also I get thin cardboard strips and put it under the outside edge of the curve to just change the tilt of the corner to give a slight banking. Most of my corners have this. regards, Philip

  • @andrewrice6596
    @andrewrice6596 5 місяців тому +2

    O0ps...!!. The Pendolinos look good speeding around your layout.

  • @chrisalan1540
    @chrisalan1540 4 місяці тому +1

    Your layout is fantastic, but your trains are travelling on the wrong side of the tracks Phiip.

    • @model.train.railway.
      @model.train.railway.  4 місяці тому +1

      That is true, but all 11 of my circular tracks can be made into one long loop by changing the points, but for that to work some of the tracks have to have the trains going the wrong way round. Its a compromise I have to make. Kind regards. Philip

  • @peterkean5199
    @peterkean5199 4 місяці тому +2

    Blimey they can shift.