One-week construction time-lapse with closeups: Week 14 of the Ⓢ-series

Поділитися
Вставка
  • Опубліковано 1 сер 2024
  • Week 14 in the ongoing Ⓢ series, which follows the construction of a new 13-story senior living building in San Francisco. This is a #construction #timelapse with various closeups and "sub-time-lapses" at various speeds, condensing the week of May 4 - 9, 2020, into about 49 minutes.
    The graffiti we saw at the end of last week is dealt with (over 3 hours). A guy with a big drill. Concrete forms. A guy with a smaller drill. There's a nice view of a moonset on Monday night. The walkway in front of the site gets covered.
    A tangle of rebar and wiring. Progress continues on the shoring for the next floor up. The forms for the central core / elevator shaft are lifted up to the next level. All kinds of closeups, including a guy measuring the flatness of the concrete we saw poured last week. Another concrete pour, the first one above ground level. As always, there's always more rebar.
    We see how the concrete pump accesses the line for the pumping tower, now that there's shoring for the next floor in place. This is only a temporary solution, though, we'll see a more permanent solution in coming weeks.
    With a potpourri of music tracks licensed from Audio Network (listed below in chronological order). Mixed things up a bit this week with a bunch of rock instrumentals, but still also a little of the "traditional time-lapse-style" music too.
    Midnight Hour 2 - Alex Arcoleo, Josh Oliver (3378/38)
    Keep On Running - Kevin Browne (1399/7)
    Pleasure 2 - Paddy Conn (3321/104)
    Towers Of Glass - Matt Hill (1648/7)
    Beard Trim - Bob Bradley, Matt Parker, Steve Dymond (2821/2)
    Just Reach For The Sky 2 - Julian Emery, Cenzo Townshend (3366/19)
    This Old Town 2 - Michael Farkas, Teddy Weber, Seth Travins (3182/80)
    Catch A Ride 3 - Jake Field, Duncan Thompson (3060/94)
    Into Your Mind 2 - Jonathan Lloyd, Nathan Coen (2902/65)
    Famous 3 - Bob Bradley, Steve Dymond, Jonny Firth (2868/9)
    Fly 2 - Tom Boddy, Pete Masitti (2589/99)
    Cats Eyes 2 - Jonathan Lloyd, Nathan Coen (2930/20)
    Riders Of The West - Randall Breneman, Jake Field (1779/4)
    Take Me Home - Bob Bradley, Matt Parker, Steve Dymond (2821/2)
    As usual, you're always welcome to listen to your own playlist instead if you prefer (there's no dialog in the video).
    00:00 - Mon (graffiti, drilling, forms)
    09:53 - Mon night moonset
    10:16 - Tue (rebar, wiring, shoring, walkway)
    16:29 - Wed (core forms, carpentry, shoring)
    22:42 - Thu (many closeups, concrete)
    35:29 - Fri (rebar, flatness, closeups)
    48:11 - Closing, previews
    This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.
  • Розваги

КОМЕНТАРІ • 117

  • @tomatoking001
    @tomatoking001 4 роки тому +7

    It’s Sunday morning here in the U.K. hospital construction on and all’s right with the world.

    • @audiotron1003
      @audiotron1003 4 роки тому +1

      I'm watching in Nottingham at about 10pm Sunday

    • @tomatoking001
      @tomatoking001 4 роки тому

      audiotron1003 cool my daughters just moved to west Bridgford

  • @jacob3617
    @jacob3617 4 роки тому +4

    Great video's....Seriously nice to see how this construction is going and growing...lots of respect for all the hard working people on this job.

  • @MattTrains2001
    @MattTrains2001 4 роки тому +5

    guy at the end untangling the chalk line, been there done that, its a pain in the arse

    • @Scottybravo1
      @Scottybravo1 3 роки тому

      Yeah, I was definitely feeling his pain

  • @dougchristopher2072
    @dougchristopher2072 4 роки тому +2

    This is the one video I wait for out of all other videos.

  • @francistordiy223
    @francistordiy223 4 роки тому +5

    I always waiting for this hahaha, keep it up sir.

  • @suzylarry1
    @suzylarry1 4 роки тому +1

    First floor pour May 7 2020 . Nice progress. Keep up the great video work !

  • @MrQuietscheDUCK
    @MrQuietscheDUCK 4 роки тому +4

    The workers there are like busy Ants.

  • @constructionwatcher5381
    @constructionwatcher5381 4 роки тому +1

    Another well done video. Well done!

  • @ArthurDentZaphodBeeb
    @ArthurDentZaphodBeeb 4 роки тому +2

    Great vid, as usual.

  • @alecsecret967
    @alecsecret967 4 роки тому +1

    Brilliant addictive viewing .......... Thank You ........Stay Safe

  • @audiotron1003
    @audiotron1003 4 роки тому +2

    The decking process is called tabling in the UK. They have these Rod like devices that support the boards above. They are individually adjusted like telescopic table legs. Once all is well and the boards are in place they pour concrete over rebar lattices. Once set the "tables" are removed from below and the process repeated for every floor required.
    In the building I work in if the suspended ceiling is removed you can see where the boards were.

  • @amazingpulsation9325
    @amazingpulsation9325 4 роки тому +2

    thats amazing !

  • @noaman1976
    @noaman1976 4 роки тому +1

    Again... Thank you for the great video.
    1- this is first time I see the flatness measuring tool.
    2- I can see how it is difecult ti work with the steel crowded shear walls at the end of the video. I think they need to find a way to make their work easier, like fixing the horizontal steel while on ground.

  • @johanreibestein4231
    @johanreibestein4231 4 роки тому

    49:01 damm i had a flashback with the chrismas-lightning ,thanks for the vid again , gr from the netherlands

  • @stephenschwartz9193
    @stephenschwartz9193 4 роки тому +1

    Another amazing video for the best construction channel on UA-cam keep up the great work 👍

  • @GMCShazamataz
    @GMCShazamataz 4 роки тому +1

    nice work.

  • @clippernail625
    @clippernail625 Рік тому +1

    Really nice video thanks hospital construction

  • @gilb6982
    @gilb6982 4 роки тому +2

    No the column is right it is the building that have to move
    maybe there was a knot in the line ...

  • @fallofmanbrand
    @fallofmanbrand 4 роки тому +1

    nice video bro

  • @malcolmross3782
    @malcolmross3782 4 роки тому +1

    Hello H C, another great video lots going on as usual. Two steal workers putting in more bars to the lift shaft? Another major concrete pour seemed to go ok, but will they need to move the column by three inches? Keep it up and thanks for sharing and hope everyone continues to stay safe 😷

  • @emadeldinhessain3272
    @emadeldinhessain3272 4 роки тому +2

    super.

  • @clauswerle
    @clauswerle 4 роки тому +1

    Super

  • @musqmeca5301
    @musqmeca5301 4 роки тому +2

    acabando de ver aqui do Brasil as 22:25 do dia 13/06/2020 mais um show da construção americana, PARABÉNS PARA O ESFORÇO, DEDICAÇÃO E EMPENHO DO EDITOR OU EDITORES DO VÍDEO, está chegando o verão americano tomara que essas cameras consigam suportar o calor enfim PARABÉNS A TODOS até o próximo vídeo um abraço a todos...

    • @leandromartins7537
      @leandromartins7537 4 роки тому +1

      Estou vendo com meu pai, ele adora ver vídeos de construção e encontramos esse canal. Muito bom!

    • @musqmeca5301
      @musqmeca5301 4 роки тому +1

      @@leandromartins7537 oi Leandro Martins tudo bem? Esses videos são verdadeiras obras de arte da ou das construções americanas, procure ver desde o início é um aprendizado e um grande barato, valeu CONTERRÂNEO um abraço...

    • @leandromartins7537
      @leandromartins7537 4 роки тому +1

      @@musqmeca5301 vimos a série toda, aguardando os próximos hehe! Realmente é muito bom. Abraço!

  • @benfranken15
    @benfranken15 4 роки тому

    never knew how many work it is to a bilding....

  • @TheRonKlimo
    @TheRonKlimo 4 роки тому

    Some special people working on this site...the guy in the white helmet (not hard hat) uses a leaf blower to clean the deck (great idea) but misses half the nails and debris and then later walks around aimlessly spraying the deck with something...the poor guy is lost....lol... then you got the guy at the end that doesn't know that if he takes his gloves off, it would be much easier to get that knot our of that chalk line...maybe he's afraid to get chalk on his hands.....Great video as always...

    • @peon9282
      @peon9282 4 роки тому +1

      Using a leaf blower isn‘t a great idea, it‘s normal, and he‘s spraying the form with release agent to prevent the concrete from sticking to it.

    • @misstakenot9582
      @misstakenot9582 4 роки тому

      He'd probably be disciplined if he removed his gloves.

  • @jeffreyloftus3617
    @jeffreyloftus3617 4 роки тому +2

    What kind of a Cowboy drills in a starter bar just 4/5 inches 2-30 till 3-30

  • @michasleziak1506
    @michasleziak1506 4 роки тому +1

    👍👍👍

  • @familiewensink9705
    @familiewensink9705 4 роки тому

    Are all the closeups done afterwards? You have some really good camera equipment, because those closeups are of insane quality!

  • @scottsee5766
    @scottsee5766 3 роки тому

    From what I can see, it appears that all the red/blue/green junction boxes are covered in concrete. Are they drilled/accessed somehow by the electricians later? Every so often I'll see one on top of the finished floor, but mostly they're gone.

  • @tardismole
    @tardismole 4 роки тому

    41:16 Two grown men discuss their dot-to-dot picture:- "It's my turn." "No, you did that bit." "No, that bit was yours. See? It's your crooked handwriting." :)

  • @scottsee5766
    @scottsee5766 3 роки тому

    All the orange dots at 26:20, I'm imagining each is from a different person making the same measurement.

  • @wyattseay75
    @wyattseay75 3 роки тому

    Did you record these videos to a hard drive and if yes how much space did you need? Thank you for making these videos

    • @HospitalConstruction
      @HospitalConstruction  3 роки тому +2

      The raw recorded video for one week typically takes somewhere around 4-6 TB. Once it is all edited down into an episode and unused footage discarded, the final archive for a week is typically somewhere around 400-900 GB, depending on the week.

  • @ymaluly
    @ymaluly 4 роки тому

    Very interesting as usual. What will be this building? What is the address?

  • @joebledsoe257
    @joebledsoe257 4 роки тому +3

    I can see a line in the budget, Graffiti removal $250,000.00

  • @constructionwatcher5381
    @constructionwatcher5381 4 роки тому +2

    All the little boxes they are screwing to the deck, I assume are mostly for electrical. With them all screwed down, how do they later remove the decking after the concrete is placed? Do the screws pull out of the deck boards or what?

    • @user-ie8st5qr3y
      @user-ie8st5qr3y 4 роки тому

      Good question How are the deck boards removed ?

    • @alb4150
      @alb4150 4 роки тому

      Pretty sure they are easy to remove and take no hard work. I didnt have time to see the exact procedure as I was in school.

    • @kylemcqueen9465
      @kylemcqueen9465 4 роки тому

      the screws they use have no heads so as they drop boards the screws come with at least on the project I've been watching this is how its done

  • @scottsee5766
    @scottsee5766 3 роки тому

    Another question: do the plywood forms on the underside of the floors come down too? It looks like the junction boxes are screwed into the plywood from the top; wouldn't that make it more difficult to remove the plywood later? Are the junction boxes meant to be accessed from above?

  • @sergeitolstihin
    @sergeitolstihin 4 роки тому +1

    👍

  • @AffordBindEquipment
    @AffordBindEquipment 4 роки тому

    how do they clean out all that pipe and tubing at the end of a concrete pour?

    • @stainfels1685
      @stainfels1685 4 роки тому

      After pumping the concrete, a sponge ball is pressed through the pipes a few times.

    • @jeffreyloftus3617
      @jeffreyloftus3617 4 роки тому

      A soft sponge / ball is sucked back through the hose and pipes back to the hopper

  • @davidsilvera7436
    @davidsilvera7436 4 роки тому +2

    What is all that piping/tubing they lay down in the flooring and then pour cement over? Is it for electrical?

    • @MrQuietscheDUCK
      @MrQuietscheDUCK 4 роки тому +2

      mostly electrical

    • @newsnowfresno6873
      @newsnowfresno6873 4 роки тому +1

      One of my last projects as an inside wireman was a poured-in-place parking structure. The fact that the electrical boxes are all facing downward, the minimal number of electrical boxes for the square footage involved and the hand troweled, rough scallop finish of the floor pours leads me to believe that this portion of the building will be a parking structure. I have never seen trowel scallop finishing like that used in an occupied or equipment building area

    • @timothybarney7257
      @timothybarney7257 4 роки тому +1

      @@newsnowfresno6873 I'll add that the boxes painted red are most likely for fire/smoke detection equipment wiring as the red color is specified by code/NEC in the US. I don't know what/if green is called out for by code, but could be emergency lighting possibly.

  • @firedavin
    @firedavin 4 роки тому

    Have a question when they’re finished building the building and they removed the crane what do they put in its place? Do they put a elevator or do they just leave it hollow what do they do with that space?

    • @ericjenjohnson
      @ericjenjohnson 4 роки тому +3

      Freedom flight In this case it’s not an elevator but shaft because they are not framing for it around the tower. My guess is that they come back in reinstall reinforcing rebar and pour a floor over each spot.

    • @alb4150
      @alb4150 4 роки тому

      @@ericjenjohnson I always had that thought and it probably is true

    • @timothybarney7257
      @timothybarney7257 4 роки тому +1

      @@ericjenjohnson Could also be used as a central plumbing/electrical chase between floors, but I'm thinking that isn't likely because of the size of the crane base. The concrete pumping tower shafts could potentially be used for that as well as they're much smaller and probably better suited for that type of use.

    • @kamrankeri7314
      @kamrankeri7314 4 роки тому

      They have left reinforcement dowels from all sides so later on after removing tower crane they will overlap more reinforcement with those dowel bars and will pour concrete

  • @watchjaredwork1487
    @watchjaredwork1487 3 роки тому

    I watch some of these guys trying to run a tape measure and wonder what the actual fuck they’re doing on a construction site 😂

    • @soytun
      @soytun 3 роки тому

      Rh7sdfffff777777777gyyttggfrttyttyggjtfdefjougecjgggggggghdrvdvhhhffgctj7fgmmmmmmmmngyfedftgrry7yt67utthgyhyyyyyyyygihyyyyyuuu9lhy.grguhholhtrdsqqHhuyuy
      Ttuuyyyyuuuoiiihjrtynrhtyytygtrt5
      Frrrtkrtrterrtjrtyttyt7tugygthyhtthuuhftytt Titer7f6hrj

  • @gregcarter1
    @gregcarter1 3 роки тому +1

    1000 Van Ness

  • @ricsikicsi2131
    @ricsikicsi2131 4 роки тому

    Are the number of levels known?

  • @AffordBindEquipment
    @AffordBindEquipment 4 роки тому +2

    1:16 I wonder who he pissed off to get that job?

    • @timothybarney7257
      @timothybarney7257 4 роки тому

      Could simply be the FNG...Freaking New Guy on the site. They get all the crappy jobs.

    • @firesurfer
      @firesurfer 4 роки тому

      @@timothybarney7257 Freaking? Never heard that before. You mean F***** New Guy.

  • @victornolan373
    @victornolan373 4 роки тому

    Why are they cutting the rebar?

  • @waynep343
    @waynep343 4 роки тому +1

    you do realize you are going to loose some of your view when that building is done..
    i really wonder.. is there enough lateral strength in that to withstand a san andreas mega quake.. with what looks like the elevator core being the main structural component to prevent lateral movement.

    • @alb4150
      @alb4150 4 роки тому

      The elevator shafts are always the most capable to resist a earthquake

    • @Bill_N_ATX
      @Bill_N_ATX 4 роки тому +4

      This building appears to be built on eluvial land. Only the center of San Francisco’s actually rock. A lot is either eluvial or sedimental build up or out and out land fill. These lands tend to quiver like jello as opposed to the up/down or stretching motions of the rocks. Thus this building has no pilings. It instead has a massive mat foundation that the building floats on. Reinforced concrete is good for these kinds of buildings in seismic regions as long as you build in enough shear strength. As you surmise, the elevator core and emergency stairwells usually provide a lot of that strength as do the poured walls for the auto parking ramps in the back of the building. It’s a delicate balance between strong enough to not fall down but not so strong it cracks. I bet a lot of elemental analysis went into the engineering of the building. I don’t think it’s going up a bunch of floors. There just wasn’t enough foundation for it.

    • @victorc8804
      @victorc8804 4 роки тому +1

      I hope he loses all his view he chooses to live several stories up in a major city he knew this would happen if construction were to happen in front of his window

    • @timothybarney7257
      @timothybarney7257 4 роки тому

      Building across the street appears to be mostly commercial from what I can see, the end facing the new building under construction has signage indicating it's for "Studiomix S" and the other end is an AMC theater building with at least one iMAX theater in it. It appears (from the outside) to be 4 story with high ceilings on each floor based on the window layouts.

  • @familiewensink9705
    @familiewensink9705 4 роки тому

    Does anyone know what the spray is for in 42:10?

  • @petedriscoll3737
    @petedriscoll3737 2 роки тому

    WHAT THE BUIDING TS HERE

  • @scratchbuiltdozer
    @scratchbuiltdozer 4 роки тому

    What’s the two streets that this is on?

    • @scratchbuiltdozer
      @scratchbuiltdozer 4 роки тому

      Ok I found it. I actually just got into town and staying right here on the same street. 15min walk away. I’ll check out the hospital as it’s next door.

    • @scratchbuiltdozer
      @scratchbuiltdozer 4 роки тому

      We are on the corner checking it out. We gave you a big thumbs up and see your camera(s) in the window. So cool to see in person!
      Love the channel👍👍

    • @scratchbuiltdozer
      @scratchbuiltdozer 4 роки тому

      We are here at 1915 or 7:15pm

    • @HospitalConstruction
      @HospitalConstruction  4 роки тому +2

      Uh oh, now you've gone and ruined the suspense for yourself! You've seen what it looks like in Week 20!

    • @scratchbuiltdozer
      @scratchbuiltdozer 4 роки тому

      Hospital Construction amazing how much they have completed. Was neat to see in person how much rebar they have in the elevator shaft. I seen your camera(s) up in your window also. You have the perfect view!

  • @twenty_tv
    @twenty_tv 4 роки тому

    1:30

  • @its.rfscannel9338
    @its.rfscannel9338 4 роки тому +1

    38:22

  • @scottm3130
    @scottm3130 4 роки тому

    What’s up with new construction hard hats.

    • @mcgyver272000
      @mcgyver272000 4 роки тому +2

      The new hats are more like climbers helmets. They have better straps to keep them on your head (so they dont fall onto the workers below you) and better protect against side impacts.
      The older hats and suspensions had less side impact protection. Like if someone is moving a ladder and slams the end into the side of your head.

  • @julianreverse
    @julianreverse 4 роки тому +2

    Who cares about the flatness of the concrete? There will be a screed added anyways ...

    • @firesurfer
      @firesurfer 4 роки тому +1

      You always strive for perfection, because mistakes make for do-overs later that nobody wants. That is what gets you fired.

    • @skatesneakerlover
      @skatesneakerlover 3 роки тому

      @@firesurfer BRILLIANTLY said!!

  • @itsallspent
    @itsallspent 4 роки тому

    29:28 The all Male review?

  • @danielguilbeau5403
    @danielguilbeau5403 4 роки тому +1

    Celui qui efface et peut être le père de celui qui a écrit 🇺🇸🇺🇸

  • @13cinthyag
    @13cinthyag 4 роки тому +1

    Second😂

  • @davidnull5590
    @davidnull5590 4 роки тому

    OMG! The first obvious OSHA violation at 02:45 that's the first I've seen, anyone spot others?

    • @davidnull5590
      @davidnull5590 4 роки тому

      And he's back again at 07:25. I wonder if he'll keep his job?

    • @silentepsilon888
      @silentepsilon888 4 роки тому +6

      some work just has to get done to get it done. Some people feel there needs to be a rule and a regulation for every move and every step of the way but forget that in an overly regulated and controlled workflow like they want, nothing would ever get finished or at such a high cost that nobody can afford it any longer. But I guess it's nice to sit in a comfy chair and look for mistakes others make while working hard to earn a living to support their families.

    • @Ukorih
      @Ukorih 3 роки тому

      @@silentepsilon888 PREACH.

  • @GmulderMedia
    @GmulderMedia 4 роки тому +1

    First

  • @TheRonKlimo
    @TheRonKlimo 4 роки тому

    Someone needs to learn how to paint....A painters pole ?.....work smart, not hard....lol

  • @paulthompson3877
    @paulthompson3877 4 роки тому +2

    that graffity looked good on the fence should have left it there , one mans labour to paint over it what a waist of time . haha

    • @peon9282
      @peon9282 4 роки тому

      rats arsed It‘s not a house, it‘s a construction fence. He will come back again and spray it, so why paint over it?

  • @its.rfscannel9338
    @its.rfscannel9338 4 роки тому +1

    39:17