Assembling a Tower Crane - Part 1 (of 2)

Поділитися
Вставка
  • Опубліковано 13 чер 2024
  • Watching the assembly of a #construction #towercrane timelapse-style with sped-up video and some actual time-lapses. This is part 1, which covers some of the preparations in the days and weeks prior to assembly, as well as placing the mast segments on the first day of the assembly.
    Part 2, which covers the second day of the assembly is here: • Assembling a Tower Cra...
    At the beginning this includes some of the preparation work already seen in Weeks 2, 3 and 4 of the "Ⓢ Series" of videos on this channel, and then much more detail and previously-unseen video of the actual assembly (which was only covered briefly in Week 4's original video).
    The entire "Ⓢ Series" of 93 mostly-weekly videos covering the construction of this building from start to finish can be seen in this playlist: • 2020-2022 Ⓢ series wee...
    ⏭️ 𝗖𝗵𝗮𝗽𝘁𝗲𝗿𝘀:
    00:00 - Placing the bottom segment
    02:12 - More rebar!
    04:13 - Pouring the concrete
    07:39 - Assembling the mobile crane
    09:29 - Placing mast segments
    28:02 - Pieces arriving for part 2
    37:19 - Tightening the nuts
    39:09 - Power connection
    42:20 - Day's end
    42:41 - Next video
    🎵 Music licensed from Audio Network. You're welcome to listen to your own playlist instead if you prefer (there's no narration or dialogue in the video). In chronological order:
    Anywhere With You 4 - Lewis Andrew, Chris Potter, Dominic Heneghan (3654/74)
    Strawberry Soda Pop - Andy Cooper (3783/10)
    New York Nights - Barrie Gledden, Steve Dymond, Jason Pedder (1506/4)
    Paradise Dream - Martin Felix Kaczmarski (3594/4)
    See Me 2 - Pete Masitti, Joshua Spacht (3519/42)
    Fruit Salad - George Georgia (3687/5)
    Addicted 2 - William Davies, Winston Francis, Dennis Bovell, John Kpiaye (2353/17)
    I've Been Down This Road 3 - Michael Farkas, Teddy Weber, Seth Travins (3182/10)
    1974 2 - Edward Lee Liggitt III (3633/8)
    Sous La Pluie 2 - Ann De Renais, Ben Parry (3699/43)
    When I See You Again 2 - Ariel Bui (3714/58)
    Born To Drive - Terry Devine-King (1288/1)
    What You Heard Ain't True 3 - Bob Bradley, Matt Parker, Ronnie Stokes (2821/35)
    Migraine - Andy Cooper (3783/7)
    Queen 2 - Jonathan Lloyd (2809/24)
    Avenue Of The Stars - Ray Davies (1821/2)
    This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.
  • Розваги

КОМЕНТАРІ • 242

  • @wtfbuddy1
    @wtfbuddy1 Рік тому +7

    Nice recap for the viewers and welcome back. Cheers

  • @normanjones8089
    @normanjones8089 15 годин тому +1

    So happy to be a mobile crane operator. Just wouldn't want to be a town crane operator because of the heights. Especially during strong winds, I've heard that the crane sways badly at times. Been an operator for close to thirty years and guess i always shall be. Love operating cranes.

  • @mistymick4905
    @mistymick4905 Рік тому +4

    Hat’s off to the media company great for positioning the camera so well. The weather was fantastic too. A bit cold but perfect for erecting the tower crane. The crane erectors were very professional and well organised. Great base electrical panel with plenty of room to wire up the mains cable and fixed at the perfect height. Looking forward to part 2. 🇦🇺

  • @jasoncorreal8810
    @jasoncorreal8810 Рік тому +4

    Oh yea! This brings back memories!

  • @Tank-Battles
    @Tank-Battles Місяць тому +1

    Exciting start! Part 1 of the tower crane assembly process provides an intriguing glimpse into the intricate steps involved in erecting such a massive structure. Can't wait to see the rest unfold!

  • @frfrpr
    @frfrpr Рік тому +5

    Killer soundtrack and visuals. Haven't had this much fun watching and listening to a video. Thanks

  • @kenmunozatmmrrailroad6853
    @kenmunozatmmrrailroad6853 8 місяців тому +2

    The machines AND the tradespeople are amazing 💪🏽

  • @gilb6982
    @gilb6982 Рік тому +2

    it is the firs time that i see so many little detail about a crane assembly
    Thank !

  • @HubertofLiege
    @HubertofLiege 6 місяців тому +6

    Did you tighten those bolts, Bob?
    Yeah, sure Lenny, sure.

  • @constructionwatcher5381
    @constructionwatcher5381 Рік тому +2

    It's great to see you again. This is a very nice recompilation of the process. Thanks.

  • @jetjock86
    @jetjock86 Рік тому +2

    Thanks for compiling an in depth look into such an interesting topic. I’ve enjoyed both complete build series as well.

  • @stepheninge2173
    @stepheninge2173 2 місяці тому +1

    Good lord, what a "knees week" video.

  • @MrHellenas23
    @MrHellenas23 Рік тому +6

    Excellent video, with zoom ins, and showing all the details and all the steps. Please make more videos like that, for different phases of construction. LIke SOE, Foundation, substructure, superstructure phase, cocoon system, suspended scaffolds, demolitions, etc. Thanx. P.S. You dont need the silly music, natural sound will be best

  • @alocin110
    @alocin110 3 місяці тому +2

    I always wanted to know how they put together the tower crane and how they dismental. This video is one of the best I have every seen. Hats off to these brave and skilled workers. What a great team work with full safety in vision and practice. Thank you so much for sharing this. I liked this video very much.

  • @JamesHawkeYouTube
    @JamesHawkeYouTube 19 днів тому +1

    I especially liked the two guys walking inside their boxes at 34:48 :)

  • @rogerbivins9144
    @rogerbivins9144 3 місяці тому +2

    My 1st construction job was on a 10 story building in Nashville 30+ yrs ago.
    The structure was built using a very large Manitowoc crawler and that operator was by far the loudest human on the planet which was handy because he regularly worked green riggers including me.
    Once while swinging close to the building, the hoist cable slipped into a snap clevice that was securing a safety net around the 8th floor. No way to unhook it but for a volunteer to ride the headache ball straight up and unlatch it.
    Cheers.

  • @loupiscanis9449
    @loupiscanis9449 Рік тому +4

    Thank you ,
    🐺

  • @jottasantos5220
    @jottasantos5220 Місяць тому +1

    Congratulations on your professionalism!
    Beautiful work!
    A big hug from Brazil!

  • @mitmobile5755
    @mitmobile5755 Рік тому +4

    That's Great und Good Sound.Danks Jack from Thailand

  • @johnfnielsen5068
    @johnfnielsen5068 4 місяці тому +1

    Very interesting, I love the racks for the bolts, right where they need to be and not just tossed in a bucket, Very intuitive thinking in the design

  • @HaHa-tb8bz
    @HaHa-tb8bz 8 місяців тому +3

    Wow 😳 មនុស្សខួរក្បាលឆ្លាតវៃ កំពុងសាងសង់ សំណង់ 😍🙏💚😍

  • @oscarthecat5985
    @oscarthecat5985 4 місяці тому +2

    I drove mobile. Crane. Said a prayer most days. Plain lucky

  • @bsagreg
    @bsagreg 5 місяців тому +7

    My god, there is more rebar in that pad than the hoover dam has.

  • @pavelvilsov2437
    @pavelvilsov2437 7 місяців тому +2

    how smoothly they work, it is very interesting to observe such processes in general, fitting-adjustment-marking work, = this is a very important noticeable moment to which they devote a lot of time . The music design of the video is top , it turned out very cool 😃😃😍😎👍

  • @dwightshelby
    @dwightshelby 6 місяців тому +2

    F
    Great time, I enjoyed, brought back a lot of memories.

  • @333movie
    @333movie Рік тому +3

    Good sincerity and know-how.

  • @hrendon84
    @hrendon84 Рік тому +2

    Never seen anyone wear a hoodie over their harness. Great video.

  • @berndfreier2798
    @berndfreier2798 Рік тому +3

    Thanks for the Video.

  • @livelife4228TBAS
    @livelife4228TBAS 2 місяці тому +1

    That election had quite the job with the machanics hard and nice work respect

  • @tinram745
    @tinram745 10 місяців тому +6

    Nice pants on that one worker. 🤣🤣🤣

  • @kerjakeras65
    @kerjakeras65 9 місяців тому +1

    Ini video pemasangan tower yang sangat bagus sekali,dan pantas untuk di tonton 👍👍🇮🇩🇮🇩

  • @Bob-yl9pm
    @Bob-yl9pm 9 місяців тому +5

    Good Music!

  • @randal_gibbons
    @randal_gibbons Рік тому +3

    When I was 16 I got to ride to the top of one of these cranes in a two man basket. Taking the step from the basket to the cab was scary as hell. Then I got to watch the technician I was with walk out on the boom and repair whatever it was that was broken.

  • @timw.5030
    @timw.5030 4 місяці тому +3

    Very cool!

  • @authorjack
    @authorjack 10 місяців тому

    It's amazing that only four bolts hold this entire structure together!

  • @kevinbasto5611
    @kevinbasto5611 Рік тому +3

    I like the guy with the America!! coveralls!!

    • @polishman4168
      @polishman4168 Рік тому +2

      That is the technician 😂 he’s a good guy

  • @lukejones3235
    @lukejones3235 Рік тому +4

    Keep up the amazing content #hospitalconstruction

  • @anthonylawlor9130
    @anthonylawlor9130 Рік тому +4

    Fantastic footage.

  • @user-js9qr4mh5d
    @user-js9qr4mh5d 10 місяців тому +1

    thanks for video

  • @ofdrobb
    @ofdrobb 5 місяців тому +2

    Amazing

  • @firmanpalu9539
    @firmanpalu9539 Рік тому +3

    Good job

  • @darrellphelps9552
    @darrellphelps9552 4 місяці тому +2

    welded racks to carry the connecter bolts seems a touch excessive, but I like it-

  • @YVO007
    @YVO007 10 місяців тому +1

    loving it do it all again next year yes? Thank Yu YVO

  • @helgelandvadfalker7764
    @helgelandvadfalker7764 Рік тому +6

    😮 I like the music

  • @fronteraarno
    @fronteraarno 11 місяців тому +1

    Mooie video! Met goeie muziek.

  • @ewanbaxter9199
    @ewanbaxter9199 9 місяців тому +7

    Saw them putting the nuts on the bolts hand tight but did anyone tighten them. Swaying a bit at the top now.

  • @m9ovich785
    @m9ovich785 Рік тому +3

    Thanks Much, very nicely put together...
    Mike M Wausau Wi.

  • @firesurfer
    @firesurfer Рік тому +2

    10:40 Guy with Clown pants. 11:37 New boots, guy on the left.

  • @felixromero5907
    @felixromero5907 6 місяців тому +1

    Great video I really enjoyed! It’s seems very interesting job all workers doing great job specially the guys to climb the tower to assemble the following sections.. But my question is what is the maximum age to operate these cranes seems like a job for strong men.

  • @ewanbaxter9199
    @ewanbaxter9199 9 місяців тому +3

    Ah, they tighten the nuts later. Great shots from the camera man

  • @shogun4218
    @shogun4218 4 місяці тому +1

    I am not going up there. Very interesting though. Watching from Central Florida

  • @ftaf08
    @ftaf08 Рік тому +1

    I wish we could fly double stacks in Chicago. The city makes us go one tower at a time.

  • @rjsc19591
    @rjsc19591 Рік тому +2

    Decía que si...que es el mismo que ya vimos...pero lo recomiendo....es interesante...entretenido y a ratos divertido....ademas de una bonita y elegante musica...a mi parecer....🤷‍♂

  • @SWEETBINKY
    @SWEETBINKY Рік тому +2

    Spoke to soon. Saw their method of torquing those nuts on the crane sections

    • @frankely6378
      @frankely6378 Рік тому +3

      What it looks like they are doing is actually tensioning the bolts. Which is the basic goal of torquing a bolt, but more accurate. It looks like the tool is actually grabbing the top of the stud and pulling it, then just run the nut down snug to hold the tension. This is a great way of doing this because it eliminates the big variable of the friction between the nut and the bolt, and it saves having to apply huge torque values.

  • @alanshamoun5577
    @alanshamoun5577 8 місяців тому +3

    Ok, putting it together is one thing. I REALLY want to know how they get out down and out when the building is in place!

    • @HospitalConstruction
      @HospitalConstruction  8 місяців тому

      This playlist contains a number of videos about taking apart tower cranes:
      ua-cam.com/play/PLVG3-xIaXtKzfBnPETy4orQKxTdYq1U2U.html

    • @davidw3673
      @davidw3673 5 місяців тому

      You usually just need a bigger mobile crane. This one wasn't using all of his counterweight or jib, so it can probably take the tower down with the rest of the weights and jib on.

  • @xXBuckOFiveXx
    @xXBuckOFiveXx Рік тому +36

    If a crane builds a crane, what built the first crane? 🛸🛸

    • @jakejenning6571
      @jakejenning6571 Рік тому +8

      A smaller crane

    • @35manning
      @35manning Рік тому +5

      @@jakejenning6571 so, I could use my small 1 ton engine crane to build myself the world's largest crane?
      Awesome, let me get started now...

    • @aurell9072
      @aurell9072 Рік тому +7

      Humans

    • @SG-uh6sw
      @SG-uh6sw Рік тому +1

      A stalk did

    • @michaeljones5382
      @michaeljones5382 Рік тому +1

      A overhead crane

  • @BohdanAstro
    @BohdanAstro Рік тому +1

    Thanks a lot for great videos! What's exactly model of this Terex Peiner tower crane?

  • @xaverpindl9729
    @xaverpindl9729 23 дні тому +1

    Und wieder ein Liebherr 1750 im Einsatz. Mobiler Teleskopkran beim Aufbau. 9 Achsen

  • @amosiahdenetclaw4279
    @amosiahdenetclaw4279 8 місяців тому

    What's the weight of all rebar installed and how many yards of concrete? Looks like a very impressive work...

  • @SWEETBINKY
    @SWEETBINKY Рік тому +1

    Amazing construction in preparation to construct a building. Those crane segments appear to be 40’ each in length. Anyone know what the actual dimensions are?

    • @ftaf08
      @ftaf08 Рік тому

      Peiner sections are 6 meters or just shy of 20 feet. These are double stacks or two at a time so 40 feet is about right.

  • @mohmedahmed-vw2us
    @mohmedahmed-vw2us Рік тому +2

    More and more

  • @rjsc19591
    @rjsc19591 Рік тому +1

    Creo que es lo mismo que estuvimos viendo cada domingo durante mas de dos años...el hospital...????.🤔....yo no falté ni un domingo pero no recuerdo haber visto esto....o lo vi y olvidé....hace ya tanto tiempo....o será un nuevo hospital....??????....que no creo.....recuerdo el sitio...🧐

  • @alisharif1997
    @alisharif1997 6 місяців тому +1

    Good boys keep do what you doing 🏗️🏘️🏘️🏘️🏘️🏘️🏘️🏘️🏘️🏘️

  • @jaxsonhugh9334
    @jaxsonhugh9334 5 місяців тому +5

    Ok stupid question……What do they do with the base once the project is done? Do they demo it? That is an incredible amount of material to get rid of.

    • @HospitalConstruction
      @HospitalConstruction  5 місяців тому +6

      All of the sections are pulled out of the building, including the bottom section. The concrete remains forever as part of the foundation.

    • @jaxsonhugh9334
      @jaxsonhugh9334 5 місяців тому +2

      @@HospitalConstruction thank you 👍🏻👍🏻👍🏻👍🏻

    • @HospitalConstruction
      @HospitalConstruction  5 місяців тому +7

      You can watch the disassembly here: ua-cam.com/video/MSJGlzVQUeg/v-deo.html

  • @armandoenriquez1104
    @armandoenriquez1104 Рік тому

    After the new cleans.

  • @Kevin-wj4ed
    @Kevin-wj4ed 3 місяці тому +1

    That crane not going anywhere!!!!!!!!!!!!!!!!!!!

  • @SWEETBINKY
    @SWEETBINKY Рік тому +2

    What happened to the electric impact guns to torque down those bolts on the section? Would’ve loved to seen the torque wrench they used.

    • @firesurfer
      @firesurfer Рік тому +2

      Air or hydraulic. 37:23

    • @andyvan5692
      @andyvan5692 Рік тому +1

      @@firesurfer HYDRAULIC, look up how ships engine bolts are torqued, this is the same, a hydraulic jack supplies the 'squeeze', then they just do the nut up by hand (or tommy bar, etc), that's it, the nuts hold the 'squeeze' the expanding cylinders place on the joint, so no grunting from the workers!- the hydraulic pressure on the guage is the torque applied, NO MATHS needed, easy.

  • @BariumCobaltNitrog3n
    @BariumCobaltNitrog3n Рік тому +2

    There is a church in the background, St. Mary's, they call the washing machine agitator. It's white, looks like a plus sign from above. When the sun is just right the silhouette of a breast can be seen on the side of the building. 18:00 21:27 closeup

  • @p.j.lajoie
    @p.j.lajoie Рік тому +3

    Like the Tower Crane collapse 3 years ago this July in downtown kelowna bc canada , killing 4 during the dismantling

  • @JCrugSR
    @JCrugSR 2 місяці тому

    what happens if a nut or both nut and bolt is missing and not tightened during assembly?

  • @willibald9568
    @willibald9568 10 місяців тому +1

    Welchen zweck dient diese Kasperl Hose des Arbeiters

  • @ColoradoCarrolls
    @ColoradoCarrolls 11 місяців тому +2

    Pony tail guy wasn't having it. 30:25

  • @lquinn7212
    @lquinn7212 Рік тому +3

    Where is this being built?

  • @luqmanhakimmohdyaacob8600
    @luqmanhakimmohdyaacob8600 9 місяців тому

    Kering tinggi molek, terbaik Kemah2 molek

  • @Ahmed-ln2od
    @Ahmed-ln2od Рік тому

    What torque tool is that for the tower bolts

  • @daytonpyro
    @daytonpyro Рік тому +1

    so much steel for that. and why such a big pad of concrete? and when its done i guess that pad is part of the basement? interesting. stuff.

  • @tomt9543
    @tomt9543 5 місяців тому +13

    Am I the only one who found it unbelievable that they didn’t just close that block of street while this was going on?

    • @HospitalConstruction
      @HospitalConstruction  5 місяців тому +1

      Most likely the city wouldn't let them completely close it. It may not look it, but that is part of a major east-west route through the city.

    • @jimcphelan
      @jimcphelan 5 місяців тому +1

      Not necessary.

    • @iandrew6347
      @iandrew6347 4 місяці тому

      That’s nothing you should tower cranes going up in London . Great video 🫶🏻🇬🇧🫶🏻

    • @TOG311
      @TOG311 20 днів тому +1

      I’m a A&D Director for a Crane Company. More than likely it’s always about money to close the road, or the crane has bad timing during holidays. Towers are majority of the time in downtown areas. Always busy

  • @paulthompson3877
    @paulthompson3877 Рік тому +2

    i wounder how they are going to fit enough concreat in that hole with all that steel rebar ?

    • @firesurfer
      @firesurfer Рік тому

      Most of the rebar is near the top for technical reasons. They add an extra layer of rebar because of earthquakes.

    • @paulthompson3877
      @paulthompson3877 Рік тому

      @@firesurfer THANKYOU

  • @websitesthatneedanem
    @websitesthatneedanem Рік тому +2

    How come the main riser section Bolts are only done up hand tight????
    ⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉⁉
    .... or did I miss something...?

  • @JCrugSR
    @JCrugSR 2 місяці тому +1

    What happens if the foundation isn't thoroughly dry before assembling?

  • @brickleyyard4966
    @brickleyyard4966 4 місяці тому

    So how do that remove or deal with that base section of the crane that has been concreted in obviously I know thay can't really remove but what do thay do with it

    • @kerrryschultz2904
      @kerrryschultz2904 3 місяці тому

      There is a piece that is concreted in and just above that is the section that is held in by a tapered wedge. That wedge is driven out and allows that section to be removed . Anything which is slight can then be torched off level with the concrete.

  • @rjsc19591
    @rjsc19591 Рік тому +2

    👍

  • @PeterJD35
    @PeterJD35 6 місяців тому

    Do those union guys know storage bags exist for those bolts?

  • @IATCOTUOHAEW
    @IATCOTUOHAEW 3 місяці тому +1

    I was not expecting that in this day and age it will take such a Colossal amount of time just to assemble/erect one tower crane...

    • @camvvti
      @camvvti 3 місяці тому +2

      How would you do it then?

    • @josephohara7407
      @josephohara7407 2 місяці тому +1

      How many have you erected?

  • @perryfefchuk637
    @perryfefchuk637 3 місяці тому

    No safty harnesses while enjoying the veiw😮

  • @gilron9585
    @gilron9585 Рік тому +3

    Thanks a lot! what happens to the crane when the building is complete ?

    • @polishman4168
      @polishman4168 Рік тому +3

      It gets taken apart the same way that it got put up

    • @polishman4168
      @polishman4168 Рік тому +2

      Then it comes to the yard to get inspected cleaned and serviced

    • @gilron9585
      @gilron9585 Рік тому +1

      @@polishman4168 Thanks. Even if it is inside the building ?

    • @HospitalConstruction
      @HospitalConstruction  Рік тому +1

      You can see it taken down here: ua-cam.com/video/MSJGlzVQUeg/v-deo.html

    • @gilron9585
      @gilron9585 Рік тому +1

      @@HospitalConstruction Thanks!

  • @richardwills7768
    @richardwills7768 Рік тому +2

    I wonder what psi concrete they poured?

  • @ms-mac521
    @ms-mac521 Рік тому +1

    👍👍👍

  • @Sail0rGooN
    @Sail0rGooN 12 днів тому

    I’m really surprised they were only hand tightening those bolts when the crane sections were going up.

    • @nbuckanaga6840
      @nbuckanaga6840 10 днів тому

      the tower needs to flex, its for contraction and expansion.

  • @Logjam5
    @Logjam5 Рік тому +2

    💪👍

  • @FaqiTowercrane
    @FaqiTowercrane 8 місяців тому +1

    👍👍👍👍

  • @TOG311
    @TOG311 20 днів тому

    What was the time lapse device, it lasted all day!! Try to get something other than the GoPro for shots like that. Can’t fly the drone all day

  • @ferencgal2406
    @ferencgal2406 Рік тому +4

    27:50 you're fired

    • @rjsc19591
      @rjsc19591 Рік тому

      Ese por flojo...y yo voy a despedir a otro por negligencia... poco antes que flojo ese...minuto 26...innecesario salir por fuera .....☝😇

    • @AquaSourceLLC
      @AquaSourceLLC Рік тому +1

      I'd be more worried about the "fake" torque markings on the tower lol

    • @m9ovich785
      @m9ovich785 Рік тому

      Hey Joe ??? How do You start this Generator LOL...

  • @440E57
    @440E57 2 місяці тому +1

    Will someone please explain how the device that was tightening the nuts on the tower at 43:10 works? Also, what was that gauge used for after each nut was tightened?

    • @hackenbush23
      @hackenbush23 2 місяці тому

      Hydraulic bolt stretching/tensioning. ua-cam.com/video/z2HtkTY8m6c/v-deo.html

  • @1869Felix
    @1869Felix Рік тому

    at the 39 minute mark the vidio shows the electrician hooking up the power. To me it looks like he connects the ground last. What does everyone else think?????

    • @RODALCO2007
      @RODALCO2007 Рік тому

      Agreed, Ground and cable screen should be connected first before the phases are connected. Looks like a 277/480 Volts system.

  • @chaoukizouine9946
    @chaoukizouine9946 Рік тому +2

    Hello 👍👍👍

  • @iankarimi7726
    @iankarimi7726 Рік тому +1

    I have burning question which I have been eagered to ask about this cranes... what happens when the build is finished but the crane is inside the building 🥺 how do they remove the crane and the parts out ?

    • @HospitalConstruction
      @HospitalConstruction  Рік тому +1

      You can see it here: ua-cam.com/video/MSJGlzVQUeg/v-deo.html

    • @McFarqua
      @McFarqua Рік тому

      @@HospitalConstruction Sheltered World

    • @mistymick4905
      @mistymick4905 Рік тому +1

      The tower sections will be in a shaft. Generally where the lift for the building is sited. The mobile will take the sections out when the building structure is completed. The same way as it was put together. I hope this quenches your fire.

  • @anthonygnewbreast1609
    @anthonygnewbreast1609 Місяць тому

    I didn't see the boat come in

  • @SatsukaNSS
    @SatsukaNSS Рік тому

    What About The Crane Removal?

  • @donaldraaff5537
    @donaldraaff5537 6 місяців тому +1

    Maybe a mobile crane built the first crane.