  • In this episode I wire up my meter box, main panel and sub panel for my upcoming rough in electrical inspection. CHECK YOUR LOCAL CODE, IF IN DOUBT WITH ELECTRICAL YOU NEED TO HIRE A QUALIFIED ELECTRICIAN.
    Our merchandise, thank you for the support www.bonfire.co...
    The thinker tinkerer shirt www.bonfire.co...
    GOT ICE? shirts www.bonfire.co...
    This is our Amazon store with affiliate links to the products we use on the channel. It doesn't cost you anymore and it helps support the channel, THANKS!
    www.amazon.com...
    For any hunting or fishing needs, visit our sponsor for some of the best deals in outdoor gear. This is an affiliate link costing you nothing extra, but does help support our channel. Thanks! www.sportsmans...
    View out other channel for outdoor related content such as fishing, boating and hunting! / @tkoutdoors
    Our Facebook / the-kelleys-country-li...
    For business inquires please contact us at kelleyscountry@gmail.com
    The Kelley's Country Life LLC accepts no responsibility for you trying anything you see on our show.
    Our address
    6244 East Caps
    PO Box 22
    Lamont, FL 32336

КОМЕНТАРІ • 216

  • @80carheros
    @80carheros 2 роки тому +25

    As a journeyman electrician, I must commend you on your use of code. You did everything very well, better than some electricians.

    • @TKCL
      @TKCL  2 роки тому +1

      Thank you, I've spent a lot of time doing my best to read the NEC and learn.

    • @jfromtn7410
      @jfromtn7410 Рік тому

      hey did you use a ditch witch to run3 inch conduit

    • @TKCL
      @TKCL  Рік тому

      Yes, best $75 I ever spent. My conduit was 2.5 inches.

    • @frogdad25
      @frogdad25 Рік тому

      @@TKCL Where can I get a NEC???

    • @TKCL
      @TKCL  Рік тому

      All NEC regulations are on the internet, or you can buy a rule book.

  • @LinksterGaming
    @LinksterGaming 11 місяців тому +5

    I just did my rough in for my plumbing, electrical, and HVAC on my first house. Done everything myself and passed inspection last friday. Its definitely a journey.

    • @TKCL
      @TKCL  11 місяців тому

      Congratulations! That's a huge step!

    • @LinksterGaming
      @LinksterGaming 11 місяців тому

      @TKCL thanks, I was definitely nervous. I've done a lot of work with new construction, but those 3 were the only things I didn't have experience with. It's should be smooth sailing for me here on out. Just a matter of time and money.

  • @alanmcrae8594
    @alanmcrae8594 Місяць тому

    Excellent presentation! Step by step, clear view of procedures, verbal clarifications, and no annoying background music. This is how to help people to diy. UA-camrs take note...

    • @TKCL
      @TKCL  Місяць тому +1

      Glad you enjoyed it

  • @markcaldwell1245
    @markcaldwell1245 2 роки тому +6

    To bend the ends of large wire use a deep socket the size of the wire with an 18” extension.

    • @TKCL
      @TKCL  2 роки тому

      Good tip!

  • @gregorythomas333
    @gregorythomas333 2 роки тому +5

    Just a small tip: For finding wiring you can check with your local metal recycling centers...most utilities will sell their ends & scraps to them and you can get it for pennies!
    I worked at one for a while and noticed the power company would bring the left over "bits" to us...these bits would be up to several yards long...a very nice size for stuff like this.

  • @rongray4847
    @rongray4847 2 роки тому +1

    Well Andrew as far as I am concerned you hit it out of the park again. I could not have done what you are doing. Very interesting. Thank you !! Take care and have a good week. 🇨🇦

    • @TKCL
      @TKCL  2 роки тому

      Thank you sir!

  • @vtech6885
    @vtech6885 2 роки тому +4

    Just a suggestion, you may want to add a block to space out the two kitchen switch boxes by the door. When you go put the cover plates on there going to be really close. And because your OCD like me, you will notice it. Better to do it now.

    • @seymourscagnetti1413
      @seymourscagnetti1413 Рік тому

      Great eye for the little details! He could even flip the box 180° and nail it to the stud to the right. Either way, even if the finish plates don't touch, it's too close and won't look right.

  • @highryder100
    @highryder100 2 роки тому +3

    You should check out ground crimps.. they come in different sizes and you can leave 2,3,4 grounds long to go to each switch.. saves valuable space in those tight boxes

  • @janetraulerson1590
    @janetraulerson1590 2 роки тому +1

    Enjoy each of your episodes. I have learned so much....Thank you!

    • @TKCL
      @TKCL  2 роки тому

      Thank you for watching

  • @mikeerstad4828
    @mikeerstad4828 2 роки тому +1

    As always GREAT JOB Andrew! Pretty sure you will pass your rough in inspections with flying colors!! One thin for sure any issues arise with your house you will know exactly where to start troubleshooting.

    • @TKCL
      @TKCL  2 роки тому

      That's exactly right

  • @russrockino-rr0864
    @russrockino-rr0864 Рік тому +1

    If your City, County, etc allows it, I would install the grounding electrode conductor to the main panel inside the house. That way, if there is ever an issue or failure with the connection, the seal on the Meter Base does not have to be cut. For the Homeowner, this can be an ugly and time consuming process dealing with the power company and/or inspector. You may not be able to get your power back on the same day. If the connection is in the Main panel, you can do the maintenance without any power disruptions. Drill a hole through the wall and run the grounding electrode conductor{conductor for ground rods} to the main panel. Mount a bonding bridge on the outside wall near where the GEC comes through for your low voltage grounds. Great video, Thanks, Russ, J.Electrician from Oregon

    • @TKCL
      @TKCL  Рік тому

      After inspection my inspector required grounding at the meter box. Apparently my Electric Co-op requires that as well.

  • @joebufford2972
    @joebufford2972 2 роки тому +1

    I had to chuckle when you started bending those thick wires cuz I know they don't bend! hang in there Andrew you got this one.

    • @TKCL
      @TKCL  2 роки тому

      Lol I eventually bent them, but they didn't like it!

  • @JimmyHensley36
    @JimmyHensley36 2 роки тому +1

    Great job and like a lot of work . You getting there . Can’t wait to see it sheet rock in . Gonna really make a big difference. 👍🏼👍🏼👍🏼

    • @TKCL
      @TKCL  2 роки тому +1

      Yes it is! Thanks for watching

    • @JimmyHensley36
      @JimmyHensley36 2 роки тому

      @@TKCL sent u an email ..

    • @TKCL
      @TKCL  2 роки тому

      I responded

  • @bobgray617
    @bobgray617 2 роки тому +1

    That looked like a tremendous amount of work you pulled off in this video. Awesome job.

    • @TKCL
      @TKCL  2 роки тому

      Thank you, it was a couple of days worth.

  • @bradbrescia
    @bradbrescia 2 роки тому

    When I was a kid, my parents would only watch HGTV (before it turned to reality TV) and PBS and the never-ending episodes of This Old House, The New Yankee Workshop etc. I could NEVER understand what they found entertaining about that. Yet, here I am, 25 years later getting a soup-to-nuts tutorial on building a house and couldn't be more entertained. So glad I found your channel when I did. I can't wait to see what the inspector said. Keep up the great work!!

    • @TKCL
      @TKCL  2 роки тому +1

      Lol, don't forget about the Red Green show.... The ultimate handyman! 😂

    • @TKCL
      @TKCL  2 роки тому +1

      Thank you for watching and the support

  • @workingmanrondoyle3287
    @workingmanrondoyle3287 2 роки тому +1

    Another great video Andrew 👍 I knew this is after the fact but Buchanan's sleeves would have helped you tremendously at your switch box locations for multiple bare copper pigtails. I only use greenies on my duplex outlets and single switch box locations. Good luck on your inspection, my brother!

    • @TKCL
      @TKCL  2 роки тому +1

      Yeah I'm just learning about those... Oh well, I'll make it work.

  • @pampilgrim2274
    @pampilgrim2274 2 роки тому +1

    Hi, Andrew! This was quite a hard day’s work. You did great as always.

    • @TKCL
      @TKCL  2 роки тому +1

      Thank you very much

  • @johnsmithson2506
    @johnsmithson2506 Рік тому

    Looking good keep it up always exciting if you love what you do I grow up around that kind of work and still doing it today I love it that days seems like they get shorter doing it if you know what I'm saying just past so fast like whating you video !!! I look out for the next one can't wait to see you pass inspector inspection lol.

    • @TKCL
      @TKCL  Рік тому

      All is well what a learning experience it was building our own home. Took 13 months and I learned so many great skills.

  • @bryanripple1938
    @bryanripple1938 2 роки тому

    Great learning video Andrew. I have gotten a lot of great information and your videos are always a highlight for my days. Looking forward to seeing what the inspector had to say.

    • @TKCL
      @TKCL  2 роки тому

      Thank you very much Bryan!

  • @barbaraharrold5361
    @barbaraharrold5361 2 роки тому

    Oh how exciting!!!! I’m sure you passed with flying colors:) I need to hurry and get to the next video to see how it went:) tfs:)

  • @hrlee2381
    @hrlee2381 2 роки тому

    You are doing an amazing job on your home. You have to start somewhere and you are doing great. Good luck on your upcoming inspections.

    • @TKCL
      @TKCL  2 роки тому

      Thank you very much

  • @huntingandfishinglittlebit3715
    @huntingandfishinglittlebit3715 2 роки тому

    Praying that everything pass keep the good work up.

  • @knuckle47
    @knuckle47 2 роки тому

    Given that crap with the bank, I think you’re going to be happier and enjoy the drive you have now to make all of this tie together… wishing you all the best !

    • @TKCL
      @TKCL  2 роки тому

      I agree! Thanks

  • @ethanclement9647
    @ethanclement9647 Рік тому +2

    One thing I learned early in the game of roughing in is to get the bare copper ground wires tucked into the back of each box to make room for the hot and neutral wires. Always seems to work for me. As far as the feeder wires go there are bending tools that make handling those thicker conductors the whole lot easier.

  • @gustavocervantes5435
    @gustavocervantes5435 8 місяців тому

    Hey bro you did a great job thank you for sharing with us amigo! God bless you🙏

    • @TKCL
      @TKCL  8 місяців тому

      Glad you enjoyed it, God bless.

  • @jonathangreenawalt5724
    @jonathangreenawalt5724 2 роки тому

    For the hard to reach areas, the pro level foam wand thats stiff aluminum, attach vinyl tubing so you can foam in corners, around pipes, and really hard to reach areas.

  • @kevinjmoore2359
    @kevinjmoore2359 2 роки тому

    I have been following you for quite some time. I worked as an Electrician for 40 years and I wanted to tell you that you are doin a great job. I am sorry I did not tell you about the LB's you were going to hide in the wall. I thought maybe that wall was going to be open.

    • @TKCL
      @TKCL  2 роки тому

      I have a feeling it would have been a non issue, but I chose to tear it out and install the SER cable. Thank you for watching!

  • @waltmooredanwilson8754
    @waltmooredanwilson8754 Рік тому

    Great job Andrew with the work and the video. Just one little tip on putting those ground rods in that might help you in the future. What I use is a very powerful SDS rotary hammer drill. I put a pointed bit in it, slip an impact socket over that and drive the rods in with ease. I just thought that might be helpful. Take care and God Bless.

    • @TKCL
      @TKCL  Рік тому

      I own a smaller hammer drill, thanks.

  • @gaylewatkins4685
    @gaylewatkins4685 2 роки тому

    Hello Andrew 🙂 All of the wires started to look like spaghetti to me. I'm impressed with the concentration you needed to connect all of the electrical. Great job as always. God Bless.

    • @TKCL
      @TKCL  2 роки тому +1

      Lol well I like spaghetti!

  • @davek6630
    @davek6630 2 роки тому

    For you or your viewers on future installation of a meter socket and an outdoor sub panel, you can get a combo panel that has the meter socket/outdoor panel in one package. You still have an indoor panel also. They are great because you don’t have to deal with all the stuff wire.

    • @TKCL
      @TKCL  2 роки тому

      I discussed that in a previous episode, none available locally and to order one online with the proper size breaker was going to be an additional 200 dollars over the setup you see here.

  • @andrewbreiter-wu
    @andrewbreiter-wu 2 роки тому

    Duct seal is approved more than silicone. Had an inspector requires we scrape silicone off and duct seal in the hold instead. Some can be very picky even without basis

  • @jacksondavis5746
    @jacksondavis5746 2 роки тому +1

    You’re gonna hate life especially when you go to land your grounds. Always in my book the grounds and what neutrals you don’t need for arc fault and ground fault breakers. Just makes in tighter and neat behind the service entrance conductors

    • @mfd4505
      @mfd4505 2 роки тому

      I always land grounds and neutrals first, as said, to get closer and more compact in panel. Don’t forget to leave a ground pigtail for each receptacle and switch, never mind you covered it.

  • @jamesscroggins3486
    @jamesscroggins3486 2 роки тому

    Awesome work, I am excited to see how you did

    • @TKCL
      @TKCL  2 роки тому

      Thank you!

  • @johnnyfrazier2698
    @johnnyfrazier2698 2 роки тому

    Good luck on your inspections

  • @thtadthtshldntbe
    @thtadthtshldntbe 2 роки тому

    Pro Tip, if you ever do anything like dealing with the heavy gauge wire bends again, before you attach the panel to the wall, temp attach it to a heavy work bench, do not cut the wire to length yet and you can do most of the needed bending of that section via test fit using heavy duty tools that you cannot use near the installed box due to spacing. One of my uncles, years ago, had something jury rigged up used metal conduit of the size appropriate to the wire. He had like 1 inch or so segments that were welded inside some custom steel holders. He would put them on the wire about half an inch or so apart and then screw the steel bars attached to the conduit to this repositional jig that he could set to any curvature and then he would plug the compressor in and it would bend to the target shape. Another thing, that my GC uncle who did electrical as well would do is put the heavier gauge wire in metal conduit and then stick that in a conduit/rebar bender.

    • @TKCL
      @TKCL  2 роки тому +1

      Good tips!

  • @joshruby
    @joshruby 2 роки тому

    here in nc our sub panels have to have separate grounds and neutrals like yours but it also requires a ground rod in the ground.

  • @texasproud3332
    @texasproud3332 2 роки тому +2

    As we have said electricians are generally first ones in and last ones out

  • @josmith5459
    @josmith5459 Рік тому

    Thanks for the awesome video lots of info and nice neat job you did.

    • @TKCL
      @TKCL  Рік тому +1

      Thank you for watching

  • @jeremiahs45
    @jeremiahs45 2 роки тому

    We carried a 1” box wrench to bend service cable. Personally don’t like the ground wire nuts. I will stick with bare copper crimp sleeves

  • @lloydwilliams8715
    @lloydwilliams8715 2 роки тому

    Ha Andrew. Checking in from Jamaica 🇯🇲🙏. Let's get some box and wires installed ☺️☺️

    • @TKCL
      @TKCL  2 роки тому

      Yes sir! Take care

    • @lloydwilliams8715
      @lloydwilliams8715 2 роки тому

      @@TKCL thanks Andrew, am really impressed with the way u are building, been your first. Keep it up. Looking forward to the complete project.

    • @TKCL
      @TKCL  2 роки тому +1

      Thank you very much

  • @hrlee2381
    @hrlee2381 2 роки тому

    That's a lot of wires. Wow. What a puzzle.

  • @ryanzynda5114
    @ryanzynda5114 2 роки тому

    The house is looking awsome.

    • @TKCL
      @TKCL  2 роки тому

      Thanks

  • @MJADoingStuff
    @MJADoingStuff 2 роки тому

    Thanks for the video getting ready to install a meter and main panel in the pole barn. Also glad you decided to start wearing a hat 😁👍 I know they give you head aches but the sun will make you start looking old quick.😂

    • @TKCL
      @TKCL  2 роки тому +1

      Glad you find the content useful. Take care

  • @danielfuentes9884
    @danielfuentes9884 Рік тому

    Great teaching 👍

    • @TKCL
      @TKCL  Рік тому

      Glad you found it useful.

  • @samclements2834
    @samclements2834 2 роки тому

    Amazing man!! So excited for you both!!

    • @TKCL
      @TKCL  2 роки тому

      Thank you

  • @WiSeNhEiMeR-1369
    @WiSeNhEiMeR-1369 Рік тому

    HOWdy Kelley's
    Thanks
    COOP
    the WiSeNhEiMeR from Richmond, INDIANA
    ...

  • @apollorobb
    @apollorobb 2 роки тому +3

    The lugs in MBR and Meter bases should be torqued with a torque wrench . Shes lookn nice

    • @TKCL
      @TKCL  2 роки тому

      👍

    • @mikebarber1
      @mikebarber1 2 роки тому +1

      Click - Torque achieved.

    • @TKCL
      @TKCL  2 роки тому

      I'd be curious as to how many electricians actually carry around a torque wrench and torque to specs. I'm betting less than 1 percent.

    • @instanoodles
      @instanoodles 2 роки тому

      @@TKCL I heard my electricians torque wrench clicking when I had my meter upgraded

    • @TKCL
      @TKCL  2 роки тому +1

      You had a rarity I'm assuming, I've seen this topic on popular UA-cam electrical channels and forums. The general consensus is most electricians don't torque to spec. I'm definitely not disagreeing, it's a great thing to do.

  • @shanepadgettii9784
    @shanepadgettii9784 2 роки тому

    You hitting that ground rod so close to that Siding made me so nervous 😓 . Great video and good luck on inspection!

    • @TKCL
      @TKCL  2 роки тому +1

      Should have seen the one I was pounding in right in front of the window 😳

  • @ArizonaHighDesertHomestead
    @ArizonaHighDesertHomestead 2 роки тому +1

    Great video.. nice work

    • @TKCL
      @TKCL  2 роки тому +1

      Thank you

  • @kingwood4357
    @kingwood4357 2 роки тому

    Can't wait to hear the results of your inspections, I'm really impressed with all that you know or learned building your house, especially electrical and plumbing. Hopping for nothing but minor issues from inspector, Good Luck. .

    • @TKCL
      @TKCL  2 роки тому

      Thank you very much, editing the video now!

  • @reneemontgomeryvoice
    @reneemontgomeryvoice Рік тому +1

    This channel is great! I have watched several of the videos and I am completely amazed how you all built your own home. How did you learn to do all of this?

    • @TKCL
      @TKCL  Рік тому +1

      Just went after it and researched on UA-cam. I've grown up in the country where you have to figure things out and saving money is a way of life.

  • @NorRavel
    @NorRavel 2 роки тому +1

    Hummm..... was that a "Stranded" ground electrode conductor that you buried?

    • @TKCL
      @TKCL  2 роки тому

      Your point? Nec lists stranded copper for GECs. Copper is copper right?

  • @seymourscagnetti1413
    @seymourscagnetti1413 Рік тому

    Nice.

  • @brendaanderson8565
    @brendaanderson8565 2 роки тому

    Looking good.

    • @TKCL
      @TKCL  2 роки тому

      Thanks 👍

  • @williamhustonrn6160
    @williamhustonrn6160 2 роки тому

    I am not sure if you have the budget for this, but before you do your insulation on the inside, reach out to an aerobarrier contractor and get a quote on it for your area. I had a guy from Tampa come out and do our contractor built 7 year old house and he charged me just under $2/sqft. It was worth every penny, because we dropped our electrical bill by over 50% due to how many leaks were present in the fairly new house. We went from paying almost $200/month in electric to now our bill is typically right around $90-100. Last month we paid $94 and we keep our hvac on 74F.

    • @TKCL
      @TKCL  2 роки тому

      I won't have time or the budget, but I feel comfortable on how well I've sealed the house. Then add 5 inches of spray foam on top of that.... I should be good.

    • @TKCL
      @TKCL  2 роки тому

      I'm really hoping after all I'm paying for spray insulation that I have electric bills close to yours.

  • @dougdavis4439
    @dougdavis4439 2 роки тому

    Thanks!

    • @dougdavis4439
      @dougdavis4439 2 роки тому

      That sure was a lot of work on the electrical! Appreciate the information Andrew. One step closer my friend!

    • @TKCL
      @TKCL  2 роки тому

      Thank you very much sir! Hope you are doing well.

  • @lanelangford5589
    @lanelangford5589 2 роки тому

    Love the show! Take a break!

  • @mike93lx
    @mike93lx 2 роки тому

    If you are running #2 ser to that sub, you can't feed it with a breaker larger than 90a.
    Also, you do not need anti ox in most situations today. All depends on the wire manufacturer's recommendations. But I don't believe it hurts

    • @TKCL
      @TKCL  2 роки тому

      My inspector actually asked to see if I did coat it.

    • @mike93lx
      @mike93lx 2 роки тому

      @@TKCL yeah, but their ask may be based on old info. Either way you did it, so you are good to go. I edited my comment regarding the subpanel feed breaker too, fyi

    • @TKCL
      @TKCL  2 роки тому

      Actually if you look at the National Electrical Code Allowable Ampacities of Insulated Conductors Rated 0-2000 Volts chart, it has an asterisk by #2 aluminum wire for dwellings and states it allows 100 amps of service. Otherwise you must go by a temperature chart and derate from 100 amps, but there is the allowance if it's a dwelling. Probably because houses don't pull near the current people assume.

    • @mike93lx
      @mike93lx 2 роки тому

      @@TKCL only is that is the service for the entire dwelling. Otherwise you have to drop to the 75 degree column, which limits it to 90a
      Not looking to argue, this is just a very active topic on garage journal and I've seen several electricians push it hard, many times, with support

    • @TKCL
      @TKCL  2 роки тому

      No worries, I like discussing these things. I had no issues with inspection on that, and the likelihood of me ever hitting a full 100 amp load on that sub panel is practically non existent.

  • @diyoregonnowtexas9202
    @diyoregonnowtexas9202 2 роки тому

    I want to learn how to do this, but you said you've never done this before,lol.

    • @TKCL
      @TKCL  2 роки тому

      Doesn't stop me from learning and trying. I passed all inspections with only three minor redos.

  • @jeffbecraft7174
    @jeffbecraft7174 Рік тому

    You did a great job. Saved $3k

    • @balrog006
      @balrog006 Рік тому

      If he did all of his rough in electrical and the meter install, he saved a lot more than $3k on that house.

    • @TKCL
      @TKCL  Рік тому

      Agreed!

  • @jeffreyvictor3678
    @jeffreyvictor3678 Рік тому

    Doesn't the new code call for a disconnect after the meter box for FF use in case of emergency?

    • @TKCL
      @TKCL  Рік тому

      It does not here only as long as the meter and main are back to back. FYI my permit was also pulled Dec 2020 before the new electrical xode came out in 2021.

  • @michaelmancini4898
    @michaelmancini4898 2 роки тому

    The grounding rod shall not be less than 8 feet in length and must be
    free of nonconductive coatings, such as paint or enamel

  • @Max-cd7xd
    @Max-cd7xd 2 роки тому

    box end wrench to bend it helps

    • @TKCL
      @TKCL  2 роки тому

      Yes true, good tip!

  • @johncastillo2581
    @johncastillo2581 Рік тому

    Is it needed to run the ground wire from main panel to meter socket? aren’t they connected together with neutral so all you would need is run a ground wire from meter socket ground lug to ground rod? Doing my house and trying to learn.

    • @TKCL
      @TKCL  Рік тому

      That's correct and all you need to do. Some areas require grounding at the main panel. Mine requires grounding at the meter. The neutral does continue the bond inside.

    • @GeronimoChannel
      @GeronimoChannel 4 місяці тому

      @@TKCL so the correction was removing the bare wire that connected the meter box with the main panel or removing the bonding screw? Or both? 😅. Or something else that I didn’t catch? Thanks!

  • @RedRiverRedNeck309
    @RedRiverRedNeck309 2 роки тому

    Andrew what about a surge protector breaker for your main panel, are you going to install one to protect the whole house?

    • @TKCL
      @TKCL  2 роки тому

      Yes I am, that's another reason I wanted to free up some space in the main panel with a sub panel

  • @stuartkorte1642
    @stuartkorte1642 Рік тому

    What gauge wire did they run from power pole to meter and what gauge did you use from meter to panel?
    I have to run 4/0,4/0,2/0 from pole to meter.

    • @TKCL
      @TKCL  Рік тому

      I am not sure, they provided it. Here everyone calls it 200 amp service cable.

  • @user-if1wt9mo3o
    @user-if1wt9mo3o 10 місяців тому

    My question is if i add 125 amp subpanel to my 200 amp panel does that only leave me 75 amps for my house. Will it overload my house panel

    • @TKCL
      @TKCL  10 місяців тому

      No, you can add as many sub panels as you want. 200 amps of 240 volt is 400 amps of 120 volt. It's highly unlikely you will ever come close to half of that amount of usage. Most homes run on a fraction of the supplied power.

  • @willpartin622
    @willpartin622 Рік тому

    HELP! I'm replacing an old Federal Pacific 100-amp panel with a 200-amp Square D Hameline panel, so I will need to upgrade the service entrance cable and want to use 2/0 THHN copper.
    The outdoor meter can/box is mounted low, (30" off the ground at bottom edge of can) outside, so if I use the bottom rear 2-inch knockout of the meter can, it will put the hole through the wall below the bottom edge of the new breaker panel by about 8 inches, so I will have to make a vertical 90 upwards turn from hole in wall to bottom knockout of the new panel. I cannot find a 2" close 90 PVC electrical fitting so I'm guessing they don't make one.
    My question is: how do I make that vertical 90 turn upwards? It will eventually be covered in drywall. Do I need to have the inside copper leads in conduit at all? If I use switch to 4/0 aluminum, do I need conduit inside the wall cavity? thanks in advance!

    • @TKCL
      @TKCL  Рік тому

      I can't answer this, your electrica company and building inspection requirements will vary from mine. You need to check with them.

  • @danielkofman4592
    @danielkofman4592 11 місяців тому

    Did you use #2 Aluminum SER wire for the 100 amp sub panel?

    • @TKCL
      @TKCL  11 місяців тому

      Thanks to covid I couldn't find any service entrance wire anywhere. So I had to run standard 2-2-2-4 aluminum wire and place in Conduit.

  • @Zeppy007
    @Zeppy007 2 роки тому +2

    1st in the house 😃

    • @TKCL
      @TKCL  2 роки тому +1

      You win! 😁

  • @21gonza21
    @21gonza21 2 роки тому

    How can you do all this and record?? Awesome work man, there is nothing like doing the work your self, peace of mind no corners where cut..
    I know you are not an electrician but I thought Id still ask..
    My main panel is inside the kitchen and and the meter is right outside and is about a foot apart, does code require rigid metal conduit or can I get by with plastic?

    • @TKCL
      @TKCL  2 роки тому

      I've done both with metal and plastic, passed both times. No matter what you use (especially) metal, make sure to put that bushing on the end so the wire can't be cut. Also code usually requires a disconnect switch between the outdoor meter and main panel. My local building department does not require this as long as they are back to back as you described.

  • @andrewmott3337
    @andrewmott3337 Рік тому

    What are the sleeves on the wall that go through the back of the panel for the wire?

    • @TKCL
      @TKCL  Рік тому

      Conduit nipples with threaded ends for wire chafes and nuts.

  • @mikemiller5139
    @mikemiller5139 2 роки тому +1

    👍🎯

  • @jfromtn7410
    @jfromtn7410 Рік тому

    so you used a ditch witch to trench the conduit for the 3 inch pvc? this is my plan fir my garage

    • @TKCL
      @TKCL  Рік тому

      We run 2.5 inch here. Yes I rented a ditch witch, totally worth the money.

    • @TKCL
      @TKCL  Рік тому

      Here is the video ua-cam.com/video/nFOhHkVBIyM/v-deo.html

    • @jfromtn7410
      @jfromtn7410 Рік тому

      oh great thanks! didn't see that video

  • @cm44-opo
    @cm44-opo 2 роки тому

    Andrew, I hope you saved gabs of money doing all this electrical work yourself. It looks like a very complicated system. Nice job!

    • @TKCL
      @TKCL  2 роки тому

      Im sure I saved money.... Not time lol

  • @mcarroll598
    @mcarroll598 Рік тому

    Did you use an expansion fitting on that conduit coming out of the ground to the bottom of your meter base?

    • @Qazxswer68
      @Qazxswer68 Рік тому

      Didn’t look like it. That caught my eye too. That pipe will be baking in the sun.

  • @johndavies2949
    @johndavies2949 5 місяців тому

    How come you don't use a meter -main combo outside? So power can be turned off in sn emergency siuation. Doesn't your inspector care? What about fire marshall? Did you take out a permit?

    • @TKCL
      @TKCL  5 місяців тому

      You apparently don't know the full code. If placing a meter and main back to back a disconnect it NOT required here. If placing apart a disconnect is required. Fully inspected, passed code ect. Your fire department should be trained to pull a meter as a means of disconnect in an emergency, if not, they don't know what they are doing.

  • @mattuk180586
    @mattuk180586 Рік тому

    So you didn’t have to have an outside disconnect for the meter base?

    • @TKCL
      @TKCL  Рік тому

      You don't here as long as the meter base and main panel are back to back. If the main panel is elsewhere and a run of wire goes through the house, a disconnect must be used.

    • @mattuk180586
      @mattuk180586 Рік тому

      @@TKCL okay. I believe where I’m at you still have to have a disconnect outside and those are hard to come by right now. Thanks for the information. Great video.

  • @TheFamilyFarmHomestead
    @TheFamilyFarmHomestead 2 роки тому

    LUCKY. We aren't aloud to use Aluminum wire here.

    • @TKCL
      @TKCL  2 роки тому

      That's all you can find in larger sizes around here

  • @stickfigure9662
    @stickfigure9662 Рік тому

    Andrew...were you allowed to backfill your trench before the inspection? I'm about to do a similar project and didn't know if inspector has to verify trench depth or do they take the homeowners word for it.

    • @TKCL
      @TKCL  Рік тому

      Yes except I was asked to leave both ends open for visual inspection of depth. Some inspectors will also bring a metal rod to randomly poke at different areas and measure depth to top of the conduit.

  • @roberthermsen724
    @roberthermsen724 2 роки тому

    This is probably a crazy question. But what would happen if you decided to build your house way out in the country like you are and you never get the inspection like your supposed to.

    • @TKCL
      @TKCL  2 роки тому

      Sadly we live in a different world now, the tax collectors office actually reviews satellite imagery to see if any new structures pop up. They also randomly show up unannounced on property too. Makes me wonder how legal this is.

    • @keithharrington8715
      @keithharrington8715 2 роки тому

      Expect your electric company to call and check. The permit office is only a phone call away and with the new meters, power can be turned off from their office.

    • @stuartkorte1642
      @stuartkorte1642 Рік тому

      ⁠@@TKCLmy office (DOT) is the one that collects the aerials that go to the FDOR and property appraisers. Most countries are on a 3 yr cycle.
      I’m sure there’s a law that now says they can come on your property. I know property appraisers will come out and measure structures and such.

  • @gussoefje6430
    @gussoefje6430 2 роки тому

    I would never recommend just buried wire without conduit. To many animals that can chew it then you have to replace it all

  • @dd6892
    @dd6892 2 роки тому

    You forgot the slip joint

  • @mfd4505
    @mfd4505 2 роки тому

    Bushing on the sub feed cable connector?

    • @TKCL
      @TKCL  2 роки тому

      That's because it originally had conduit, hard to seal a cable clamp.

  • @5150cash
    @5150cash 2 роки тому

    Dang this is more of a teaser than your community update 😣😣😣😣 🤞🏽🤞🏽🤞🏽🤞🏽🤞🏽

    • @TKCL
      @TKCL  2 роки тому +1

      Well oops!

  • @PavanKumar-ok6hi
    @PavanKumar-ok6hi 2 роки тому

    Hi grateful job from india iam a electricion

    • @TKCL
      @TKCL  2 роки тому

      Thank you for watching

  • @Pbell
    @Pbell 2 роки тому

    That Data panel is too close to the electrical panel both covers will not fit without overlapping, and inspector won’t like that on final

    • @TKCL
      @TKCL  2 роки тому

      Wrong, already covered this in another episodes comments. I have had both panels covers installed with no clearance issue. It's close, but they do not overlap.

  • @ShaneZettelmier
    @ShaneZettelmier 2 роки тому

    Grounding codes are weird come out you think they’d be pretty standard, and California people used to ground to water pipes, and it wasn’t uncommon to zap yourself a little bit under running water if you grounded with the other hand. The sinks used to be made of iron coated with ceramic, and old sinks might have chips, a friend had a couple chips in his sink and if you would touch that in the water you’d get a little zap. It’s weird because California has pretty hefty regulations because of earthquake code but they didn’t used to be that picky about grounding I guess. 😂

    • @TKCL
      @TKCL  2 роки тому +1

      Yikes 😳

    • @ShaneZettelmier
      @ShaneZettelmier 2 роки тому

      @@TKCL Don’t worry, manufactures are too cheap do use metal in tubs or bathroom sinks anymore. 😂😂

    • @TKCL
      @TKCL  2 роки тому +1

      Lol

  • @townsend96
    @townsend96 2 роки тому

    You need a day off.. go fishing. Take a nap. 👍

    • @TKCL
      @TKCL  2 роки тому +1

      Tell me about it

  • @tonysicuro3491
    @tonysicuro3491 2 роки тому

    Have you checked out Wago connectors?

    • @TKCL
      @TKCL  2 роки тому

      No I'm not familiar with them

    • @tonysicuro3491
      @tonysicuro3491 2 роки тому

      @@TKCL Would have made things a lot easier. Check Amazon

    • @tonysicuro3491
      @tonysicuro3491 2 роки тому

      ua-cam.com/video/AWiyreFFt-Q/v-deo.html

  • @paulajones9956
    @paulajones9956 2 роки тому

    2nd YAAAY

  • @mattboutonnyc
    @mattboutonnyc Місяць тому

    WRONG >>>concentric knock out... must use bonding bushing MIGB type

    • @TKCL
      @TKCL  Місяць тому

      Never once seen a bonding bushing used here on any service to home or shop. Had to look it up.

    • @mattboutonnyc
      @mattboutonnyc Місяць тому

      @@TKCL NEC Section 250.92

    • @TKCL
      @TKCL  Місяць тому

      In that same section, this seems like a no. "Because the service neutral conductor provides the effective ground-fault current path to the power supply [250.24(C)], you don’t have to install an equipment grounding conductor within PVC conduit containing service-entrance conductors [250.142(A)(1) and 352.60 Ex 2] (Fig. 2)."

    • @TKCL
      @TKCL  Місяць тому

      Isn't the neutral/grounding bar already connected to the metal entrance enclosure? That's then the conductor that connects to the main panel and house ground. I am also using PVC conduit.

    • @mattboutonnyc
      @mattboutonnyc Місяць тому

      Concentric and Eccentric Knockouts: Which Need Grounding Bushings?
      Sparky Channel
      218K subscribers
      Subscribe
      your correct....

  • @user-lp5oc4ne7s
    @user-lp5oc4ne7s Рік тому

    Hand Pounding A Grounding Rod.... really? Didn't the international code change back in 2005 or so to require new foundations to include a rebar grounding rod?
    During the pre-pour inspection, the building inspector makes sure that a stub of rebar is extended up above the top of the foundation for the Ufer ground.
    E3608.1.2 Concrete-encased electrode.
    A concrete-encased electrode consisting of at least 20 feet (6096 mm) of either of the following shall be considered as a grounding electrode:
    1.One or more bare or zinc galvanized or other electrically conductive coated steel reinforcing bars or rods not less than 1/2 inch (13 mm) in diameter, installed in one continuous 20-foot (6096 mm) length, or if in multiple pieces connected together by the usual steel tie wires, exothermic welding, welding, or other effective means to create a 20-foot (6096 mm) or greater length.
    2.A bare copper conductor not smaller than 4 AWG.
    Metallic components shall be encased by at least 2 inches (51 mm) of concrete and shall be located horizontally within that portion of a concrete foundation or footing that is in direct contact with the earth or within vertical foundations or structural components or members that are in direct contact with the earth.
    Where multiple concrete-encased electrodes are present at a building or structure, only one shall be required to be bonded into the grounding electrode system. [250.52(A)(3)]
    ❖ Encasing an electrode in concrete must be done, of course, before the concrete is placed for the footings. The 20 feet (6096 mm) of size 4-AWG bare copper conductor is run in the forms close to the bottom of the footing before the concrete is placed. Enough conductor is left extending out of the footing to be run to the service equipment without a splice. At the point where the copper conductor exits the concrete, it could be broken off by being bent back and forth several times before and during construction. To help protect this conductor, a nonmetallic conduit around the conductor where it leaves the footing would be helpful. In some installations, the end of a horizontal reinforcing bar in the concrete is bent upward so as to create an above-ground exposed connection point for a grounding electrode conductor. In other cases, concrete contractors have been known to provide a short piece of steel-reinforcing rod bent at a 90-degree (1.57 rad) angle and tie-wire it to a footing reinforcing bar for the purpose of providing a stub out for the electrician to connect to. The code does not appear to address these practices and it is the author′s opinion that the code does not anticipate that connections will be made that are solely dependent upon a scrap of rebar that is scabbed (tie-wired) onto the functional rebar. It is noted, however, that the code does allow multiple pieces of rebar to be tied together to create a 20-foot (6096 mm) or longer electrode, assuming that such pieces are placed horizontally in the concrete as required by this section. The best conducting path will likely be achieved where the grounding electrode conductor connects directly to the functional reinforcing steel. The code does not assume that the reinforcing steel bars are present because they are required as part of the structural design, although that is typically why they would be present. Reinforcing bars could be installed for the sole purpose of creating an electrode.

    • @TKCL
      @TKCL  Рік тому

      So how does this pass a crawl space foundation with zero concrete? The code here (fully inspected) requires two ground rods spaced a minimum of 6ft apart for any main service panel.

  • @chickenman247
    @chickenman247 2 роки тому

    Your mention of drywalling soon reminded me of a Matt Risinger video from a while back. Anything to prevent pest problems later since your framing is currently exposed. ua-cam.com/video/LIvPla-07fo/v-deo.html

    • @TKCL
      @TKCL  2 роки тому

      Lol your going to like a upcoming episode, I've had that product in my shop ready to go for a few months now. 😉

  • @jareddory2155
    @jareddory2155 2 роки тому

    12:15 CRINGE! You left no excess

    • @TKCL
      @TKCL  2 роки тому

      No excess what? Ground? That's a very easy fix

    • @jareddory2155
      @jareddory2155 2 роки тому

      @@TKCL networking guy here, we leave excess everything, I would have looped the feed to the panel around the meter, and up into the lugs to leave “service loop”
      I realize that stuff is expensive

    • @TKCL
      @TKCL  2 роки тому +1

      I've left everything in excess in my boxes and panels. I will however leave zero excess in a meter box with exposed 200 amps of 240 volt lugs everywhere. That's asking for trouble in my opinion, a meter box has way too much exposed metal conductors for my comfort.

  • @ieatmonkeys9543
    @ieatmonkeys9543 Рік тому

    Alright man I’m three days in and I’ve noticed a bunch you did wrong

  • @teveler
    @teveler 2 роки тому

    Well done sir... However you will never make it as a professional electrician. You failed the first step, you cleaned up after yourself. ( just a joke that people in the trades get)

    • @TKCL
      @TKCL  2 роки тому

      Oh lord, here come the comments 🍿😳

  • @earlcavenaugh6459
    @earlcavenaugh6459 2 роки тому

    Great job Andrew. No matter what the inspector found you have learned a lot and taught us a lot.

    • @TKCL
      @TKCL  2 роки тому +1

      Thank you , it's been a heck of a learning experience.