Engineering Marvel of this bridge is having Lift portion. The life is also fitted with another Diamond jewel i.e. Overhead wire for E supply by touching Pantograph and Overhead wire also will move up alongwith lift . Superb mechanism and very worthy investment by IR. thanks
When Lift is placed at bottom, the overhead wire embedded in lift portion will touch the adjoining two poles wired end and get power supply. When Lift is up, the OH wires also will move up alongwith Lift. thanks
Engineering Marvel of this bridge is having Lift portion. The life is also fitted with another Diamond jewel i.e. Overhead wire for E supply by touching Pantograph and Overhead wire also will move up alongwith lift . Superb mechanism and very worthy investment by IR. thanks
Congratulations bro 🎉❤
Thanks Arun. No your comments in this video.
@@ganeshmgl7942 🤗🥰🥰🥰
அருமை
@@ravichandran01 Nandri
A video from pamban to rameswaram station please
Unless ramanathapuram to mandapam and this bridge electrification completed , only diesel locos,May they do trials on bridge with e loco
When all train will run this pamban bridge??
@@arenagaming3082 Noo Inauguration October 15th
Bro 1st oct is possible ?@@aruncrackz
@@sudinsinghamahapatra9010 vaipugal Kammitha bro
Is opening postponed to October 15th
Yes
Please explain how the electrical wires will work when the bridge central portion will be lifted for passage of ships.
When Lift is placed at bottom, the overhead wire embedded in lift portion will touch the adjoining two poles wired end and get power supply. When Lift is up, the OH wires also will move up alongwith Lift. thanks
Bro bridge la wire ah use panaga? Or vera ethachu ah
metal pipe bro
@@aruncrackz ok bro thank you
When electrification will be completed between Pamban and Rameswaram
@@rajeshbabuka1284 noo Only Pamban Bridge Electrification Work completed
Crs inspection eppo bro
Innum Announcement Kedaikala Bro.....
When will open
expected by october 15
Opening date
October 15th inauguration