I’m NOT qualified to do this! - The Abandoned Cabin

Поділитися
Вставка
  • Опубліковано 21 чер 2024
  • To everyone who has watched these videos, from all of us at 99 Projects, including Max, THANK YOU!
    HEYBIKE E-Bikes
    Mars 2.0: www.heybike.com/products/mars...
    Ranger S: www.heybike.com/products/rang...
    Link to MERCH!
    www.aatwebstore.com/99projects
    The Abandoned Cabin Playlist
    • The ABANDONED CABIN in...
    My Amazon Storefront - Find all the products I use regularly
    www.amazon.com/shop/99projects

КОМЕНТАРІ • 417

  • @mr.reaper4505
    @mr.reaper4505 День тому +108

    Maybe you aren't a plumber, and maybe you aren't an electrician, but you are definitely self reliant, and thats worth much much more! keep up the good work!

  • @amundson1942
    @amundson1942 День тому +32

    From a former plumbing contractor. Everything looks good but the overhead vent may be wrong. Check local building codes. There is a limit to amount of horizontal venting. Also horizontal venting needs to be graded so rain water flows back into you sewer system. You may want to install clean outs at the end of your horizontal runs. Particularly where the main sewer line exits through the foundation. I sold my plumbing business in 1977 so I know there have been a million changes since then. Cast iron was the main material used in waste systems back then.🤗

  • @djbryce
    @djbryce День тому +33

    When I was a kid I used to wake up on Saturday mornings and watch "Tom & Jerry". Now I wake up and watch "99 Projects". Not sure which one made me laugh harder. 😂 Seriously, love your vids!

  • @randogame4438
    @randogame4438 День тому +21

    I've had to replace an existing sink with a new disposal and none of the old plumbing lined up so I had to redo all of it and it was two days of cussing, trips back to the hardware store, sore knees and an aching back. In retrospect, hiring a plumber to do what I did in 1-2 hrs would've been worth it. Mad Respect! Here's to hoping your inspection goes well!

  • @AlexeiTetenov
    @AlexeiTetenov День тому +7

    One of the best free things that someone can do to support a UA-camr in the UA-cam algorithm click-through rate (CTR) is by clicking and playing the video, all the way through, the very first time you see any of their video thumbnails. Don't save it for later, play it through right away, and if you don't have time to actually watch it right then and there, save it to the watch it later playlist, and then go back and watch it again.

  • @mikediamond257
    @mikediamond257 День тому +3

    How have i gone from, "lets see what this channel is about" to. "omg my shows on !!!' ......... sneaky veeeeeeeery sneaky !

  • @johnmilner6419
    @johnmilner6419 19 годин тому +1

    About plumbing: It's been my experience that clogs in the waste line occur at 90º bends, and at the p-trap located just before the main line exits the house (a p-trap is required there too). Wherever possible, if you can substitute two 45º bends in place of one 90º bend in the line, you will avoid major league headaches down the road.👍

  • @acciojosh
    @acciojosh 14 днів тому +26

    3am and should be sleeping but watching this instead 😅

  • @dondavis5633
    @dondavis5633 День тому +10

    For a plumbing job that didn't use plans or blueprints, it sure turned out beautifully. And it was way cool seeing Mrs. 99 Projects on your bike ride, too!

  • @Zubo.420
    @Zubo.420 День тому +4

    Rule 1# never miss a 99 project's video!

  • @idiotsavant7276
    @idiotsavant7276 День тому +82

    “Through the magic of editing” Kicks the camera over.

  • @MrButtonpresser
    @MrButtonpresser День тому +56

    Any fool knows that Max is the brains of this outfit.

  • @janeimel7488
    @janeimel7488 День тому +23

    I love the way Max whispers.

  • @adamnapolitano432
    @adamnapolitano432 День тому +33

    I'm loving this renovation.

  • @christiaanleblanc3387
    @christiaanleblanc3387 День тому +20

    Your vid helps people realize how much work goes into building a house / cabin

  • @ryanpinkus1338
    @ryanpinkus1338 14 днів тому +22

    I miss when the basement had all that natural light in it.

  • @CMPLT_PLYZ
    @CMPLT_PLYZ День тому +21

    max is the bestest boy

  • @Cyclone74
    @Cyclone74 День тому +13

    Thanks for the lovely ride thru the country side!!!

  • @dandevlin185
    @dandevlin185 День тому +4

    As a former plumber myself, I never glued anything until I was done running lines whether it was new construction or a replacement. This way was in case I had to move it any. A lot less waste. Your plumbing job looks great. The Apex lines should be through the studs so when you drywall the walls they are not in the way unless you have other ideas. Other than that everything looks good, see you on the next video ✌️

  • @johnsalamone983
    @johnsalamone983 День тому +12

    Next time caulk the opening between the roof and the pipe before you put the boot on. If the seal around the pipe fails you’ll have that extra protection.