TECSA SYSTEM of High Speed Railway Track Mounting

Поділитися
Вставка
  • Опубліковано 13 січ 2025

КОМЕНТАРІ • 167

  • @teacher555555
    @teacher555555 8 років тому +5

    if you watch this video, this way has become the standard for track laying in Europe. however it is still slower then the American style which can lay up to 10 miles (16093.5 meters) of track a day. and yes this video is a little old so new techniques have been tried.

  • @davidimhoff5571
    @davidimhoff5571 8 років тому +2

    This video was so entertaining. What a great system. Brilliant

  • @javaman97304
    @javaman97304 8 років тому +5

    We need to revamp the entire US rail network with this system ASAP! As it stands, the US rail network is antiquated beyond reason and woefully obsolete.

  • @pegbars
    @pegbars 7 років тому

    Glad to hear James Mason is still working in the afterlife.

    • @Palifiox
      @Palifiox 7 років тому

      Funny you should say that. But I think Mason would have told them straight that the commentary does not make sense.

  • @megatwingo
    @megatwingo 8 років тому +2

    Interesting video. Thumbs up!

  • @cutsrosescents4950
    @cutsrosescents4950 8 років тому +2

    If this was made to demonstrate Tecsa products to potential customers,I would imagine the marketing department has alot of job openings.

  • @1988ankur
    @1988ankur 8 років тому +3

    Extremely informative

  • @Nikkibansal-s2b
    @Nikkibansal-s2b 8 років тому

    this system will be really helpful for India's bullet train project.

  • @riparianlife97701
    @riparianlife97701 8 років тому +1

    Whenever someone says trains are energy efficient, think of the energy that goes into laying track. Just the production and transportation of all that crushed rock...

    • @facundojp10
      @facundojp10 8 років тому +2

      and divide that to the decades that these railways last, with minimun maintenance. Its cheap...

    • @riparianlife97701
      @riparianlife97701 8 років тому

      facundo jp Everywhere I go I see train tracks being worked on, including sections of track that are being completely replaced.

    • @facundojp10
      @facundojp10 8 років тому +1

      +Docktor Jim Everywere i go i see trucks, planes and ships on maintenance, must be that things wear and break... The thing is how often and how expensive repairs are. Trains are considered the most efficient form for land transportation...but if you dont believe in mathematics there is nothing more i can say.

    • @riparianlife97701
      @riparianlife97701 8 років тому

      facundo jp All the math I've seen is for trains running on tracks that are already there, and yeah. Those numbers look great. Making the tracks, bridges and tunnels and maintaining them doesn't seem to be represented honestly. Look at just the ballast rock. There's a great deal of machinery dedicated just to quarrying rock, breaking it, and transporting it to a rail center. And as it gets mashed into the ground and sloughs off, more must be added.

    • @DerAlex86
      @DerAlex86 8 років тому +2

      But you don't need any crushed rock, sand, tar, bitumen... to construct highways, right?

  • @MarkUKInsects
    @MarkUKInsects 8 років тому +2

    Bottom extension and bottom mounting are very important!

  • @droidvhm7
    @droidvhm7 8 років тому

    um salve aí pra galera sem papel no estrangeiro. os caras que fazem a força.

  • @TheDylanJoyce
    @TheDylanJoyce 7 років тому

    Trains are a wonderful thing, you guys!

  • @nikhomshaweeriyha9913
    @nikhomshaweeriyha9913 8 років тому +7

    After saw this clip it makes us understand Hi speed rail construction that, it is not very difficult if project administration group select right machine.

    • @GorkaArteta
      @GorkaArteta  8 років тому +3

      +Nikhom Shaweeriyha It's not only about the selection of rigth or new machines. It's the development of a new system, a new way of mounting the railway. It's the evolution or industrialization of the railway track mounting systems in order to increase the performance.

    • @nikhomshaweeriyha9913
      @nikhomshaweeriyha9913 8 років тому

      You're welcome.

    • @kcrailroader5297
      @kcrailroader5297 8 років тому +1

      Welcome to how freight track has been built in the United States for years. As for your patents, much of what you show will be covered by Harsco, Herzog, or Railworks existing patents. FYI, you can pick up used rail in a reverse of that process.

    • @chadthatcher4051
      @chadthatcher4051 8 років тому

      @kcrailroader I was thinking the same. I've seen videos of this method used here in the US several years before this video.

    • @nikhomshaweeriyha9913
      @nikhomshaweeriyha9913 8 років тому

      Thak to join idea

  • @jaxmar88
    @jaxmar88 8 років тому +8

    Explained so well (not) it left me more confused than I was before I watched it.

  • @xaa9598
    @xaa9598 4 роки тому

    Venga chica! Que eres de Pamplona!

  • @LuckeWent
    @LuckeWent 8 років тому +8

    I keep seing these videos of really awsome Spanish infrastructure engineering. Is this a thing?

    • @yggdrasil9039
      @yggdrasil9039 8 років тому +1

      It is indeed a thing. They are well ahead of the game, unlike English speaking countries where there is pretty much F$%* all in the way of high speed rail track.

    • @mrbrainbob5320
      @mrbrainbob5320 7 років тому

      ygg drasil true but spain still has a shit economy

  • @cup_and_cone
    @cup_and_cone 8 років тому +8

    266%? I'm sold!

    • @shaneloretz5566
      @shaneloretz5566 7 років тому +1

      Doubles the efficiency of the traditional system by 266%!

  • @noneck8166
    @noneck8166 8 років тому +2

    Ah train tracks.....always make me think of Cartman in Southpark.." Master got me workin', master got me slavin'....one day, master set me free!"

  • @munawarazad413
    @munawarazad413 8 років тому

    as a repeated and heavy work,,, spacial machines can be developed and utilized the effort of designing and construction of new specialized equipment.

  • @EAFSQ9
    @EAFSQ9 8 років тому

    The main problem with this is that you have to lay an auxiliary track to begin laying of 1 side of the final track, in which that auxiliary has to be removed following the first side of the final track to allow the laying of the second final track. Yes it may be faster but seems to be more time & labor intensive, as it still follows the conventional cycle of laying sleepers to the sides while ballast is being laid. I'd say, compared to Plasser & Theurer's SVM1000, at least the sleepers, track and ballast can be done quicker & utilising somewhat less time to lay track using the SVM1000. The one thing that is not changed however is the post-laying processes of finalising track cant (superelevation), ballast level & track drainage.

    • @sixmagpies
      @sixmagpies 8 років тому

      Just waiting for someone clever to design a less complex more efficient system. Until that time .......

  • @olegs79
    @olegs79 7 років тому

    Puck. This Texas mounting system is pretty good. USA. USA.

  • @pearlyhumbucker9065
    @pearlyhumbucker9065 8 років тому +3

    If this System of track construction is an "incredible improvement" and "standard", then I better dont ask what the old standard was......

  • @johntyjp
    @johntyjp 8 років тому +1

    Though I'm just a rail enthusiast not up on the technicalities of modern railways, I think a good rail network could take the place of short airflights and so reduce high altitude Global warming emissions!!

  • @wonniewarrior
    @wonniewarrior 8 років тому +1

    Due to the incredible corruption of Australian unions, and the awesome stupidity of Australian politicians and voters, we will never ever get a system as awesome as this.

    • @macondo0143
      @macondo0143 8 років тому +1

      Well, it could be worst , you could be born in Mexico !! XD

    • @Palifiox
      @Palifiox 7 років тому

      I worked on new rail construction in Australia in the 1970s and it was simpler and quicker than this rubbish.

  • @MustangsTrainsMowers
    @MustangsTrainsMowers 8 років тому +6

    My Lionel sectional track is much easier to lay. I tried MTH track once and couldn't get some of the sections to go together so I returned them.

  • @hntrains2
    @hntrains2 7 років тому

    "[...] doubles the efficiency of the traditional system by 266%" (5:55)! Whoa! The kind of creativity required to use language like that!

  • @bobaliston2700
    @bobaliston2700 8 років тому

    ?!?! why do i had a déjà-vu several times while watching the clip?

  • @GreenJimll
    @GreenJimll 8 років тому +21

    Is the commentary just a really high quality speech synthesiser being fed a Google Translate version of a Chinese web page?

    • @MicraHakkinen
      @MicraHakkinen 7 років тому +5

      Close, the actual language is Marketing. This language's defining property is the use of as many words that sound interesting as possible while at the same time not conveying any actual information. This in turn has created many jobs for people with a large enough vocabulary but without requiring any knowledge about the subject whatsoever.

    • @hntrains2
      @hntrains2 7 років тому

      :D

  • @tewrgh
    @tewrgh 8 років тому +12

    How come Chris Eubank knows so much about trains?

  • @thewelshshepherd4086
    @thewelshshepherd4086 7 років тому

    What country is this video based in as I have never seen people using yellow hi vis on track

  • @ilovenitnat
    @ilovenitnat 7 років тому

    Clear as mud.

  • @mixz9929
    @mixz9929 7 років тому

    wow how does that steel band like that and flex back straight

  • @tomikk86
    @tomikk86 7 років тому

    coooool video! really like the soundtrack, i'm wondering if uploader knows the names of the tunes, or maybe somebody else here?

  • @jimbass7867
    @jimbass7867 8 років тому +5

    Well, it works. But, it seems needlessly complex.

    • @ShazenVideos
      @ShazenVideos 8 років тому +2

      Yep, way too inefficient. Needs a assembly line construction method.

    • @ThePostal67
      @ThePostal67 8 років тому +1

      Need more Chinese laborers?

    • @sixmagpies
      @sixmagpies 8 років тому +1

      Just waiting for someone clever to design a less complex system. Until that time .......

    • @alvindecker5921
      @alvindecker5921 8 років тому

      Jim Bass

    • @sylviarohge4204
      @sylviarohge4204 7 років тому

      @ShazenVideos
      ua-cam.com/video/ixfIOr6eycU/v-deo.html

  • @hobog
    @hobog 8 років тому

    does this mounting system not work for slower railways because it requires no sharp turns?

  • @mvmohan2003
    @mvmohan2003 8 років тому

    what about expansion of rail in different weather conditions.

  • @EuropeanTrainDriver
    @EuropeanTrainDriver 7 років тому

    nice video

  • @josemiguelmanuelbajon1169
    @josemiguelmanuelbajon1169 8 років тому +1

    Distinguidos Señores de TECSA SA, me gusta mucho el video pero yo no se ingles me gustaria que lo reproducieran al español, un saludo de un seguidor de TECSA SA, yo lo digo de corazon gracias de antemano.........?

  • @sssyouyube
    @sssyouyube 7 років тому +4

    Its IRON not rubber ?
    How it can bend so easily?

    • @ironmatic1
      @ironmatic1 4 роки тому

      The same reason you can bend wires

  • @Ravisgmp
    @Ravisgmp 7 років тому +1

    यह वीडियो नरेन्द्र मोदी और सुरेश प्रभु को देखना चाहिये।

  • @slinky211
    @slinky211 8 років тому +7

    "nezezzary " 3:48

  • @AnAvengedProduction
    @AnAvengedProduction 8 років тому +1

    omg did anyone realize the song in the video is the same song from the game Test drive unlimited 2 ?

    • @thetransporter2
      @thetransporter2 8 років тому

      Scrolled to far for this! It's the song when you used the map.

    • @mtn9494
      @mtn9494 8 років тому

      I thought I was the only one^^

    • @AnAvengedProduction
      @AnAvengedProduction 8 років тому +1

      yea lol thats what it was haha , idk how thats even possible

  • @zulfiqarabid9408
    @zulfiqarabid9408 7 років тому

    looks nice

  • @driveman6490
    @driveman6490 8 років тому

    Odd, I was just laying some pecker tracks last night............then this video comes along!!

  • @CarmineRC
    @CarmineRC 8 років тому

    Except for the Butt-Ugly Locomotives, this was truly fascinating in how it's all done! Thanks.

    • @theTHwa3tes11
      @theTHwa3tes11 3 роки тому

      You guys have trains? Bruh I thought 30km/h jeeps are freaking fast.

  • @javedahmad7513
    @javedahmad7513 8 років тому

    wow amazing.

  • @mehtapramod23
    @mehtapramod23 4 роки тому

    ALL RAIL SHOULD BE HIGH SPEED IN FUTURE

  • @MrPeerum
    @MrPeerum 8 років тому

    no 1080P ?

  • @JonhMunoz1
    @JonhMunoz1 8 років тому

    What americas rails need... too bad our US Government couldn't afford such technology like this for our rails.. if they did, we'd have the whole rail system transcontinental by then! From NY to LA or from DC to Phily in 15 min...

    • @BlazeChronicGreen420
      @BlazeChronicGreen420 8 років тому

      it could easily have been afforded but it's more important to spend everything you have on wars.

    • @georgecrawford5287
      @georgecrawford5287 8 років тому

      curved arch builder

  • @NarenderSingh-nc5xy
    @NarenderSingh-nc5xy 7 років тому

    wander ful

  • @arunkumaranjanenjan4131
    @arunkumaranjanenjan4131 7 років тому

    It's amazing

  • @DocHallenstein
    @DocHallenstein 8 років тому +4

    Good fluff piece., but if you want to teach, please use an animation.

  • @LaurentLaborde
    @LaurentLaborde 7 років тому

    the music is cool

  • @oom738
    @oom738 8 років тому

    حقا مدهشة

  • @dinakardadi6761
    @dinakardadi6761 8 років тому

    super

  • @EuropeanTrainDriver
    @EuropeanTrainDriver 8 років тому

    nice

  • @engr145
    @engr145 7 років тому

    Background music dampens the audio commentary to the extent of making it inaudible.

  • @littleblitz8239
    @littleblitz8239 8 років тому +2

    Not much In their way like cities and towns.

  • @timb393
    @timb393 7 років тому

    like it reason new system but expensive?

  • @ufogarage13
    @ufogarage13 8 років тому +7

    I'm utterly confused.

    • @apexmike849
      @apexmike849 8 років тому

      Global finance projections are easily integrated into this supine model - check out NASA's web site and The Mother Earth News.

  • @EuropeanTrainDriver
    @EuropeanTrainDriver 8 років тому

    cool

  • @bestamerica
    @bestamerica 8 років тому

    '
    beautifully train tracks workers are hard working on the train tracks...
    very well workers...
    i see that train track is a not perfect straight ======================...
    very little curve on the track

  • @lunatictarou555
    @lunatictarou555 8 років тому

    1:36 Test drive unlimited 2 music!

  • @Fyourlife9892
    @Fyourlife9892 7 років тому

    super baked....

  • @techmantra4521
    @techmantra4521 8 років тому +2

    Do you guys ever wonder how you got to this video? I have to be a special kind of bored to watch this.

  • @ethanlamoureux5306
    @ethanlamoureux5306 7 років тому

    Sometimes bigger isn’t better. This looks like it has been designed to be as complicated and expensive as possible. For a much smaller and simpler method which is also very fast, and which works equally well for single track as well as double, since it doesn’t require any parallel track, check out ua-cam.com/video/bSmkO0un5Go/v-deo.html

  • @jamaaluddinas1jamaaluddina28
    @jamaaluddinas1jamaaluddina28 7 років тому

    WICH GAUGE ? ? ?

  • @heru-deshet359
    @heru-deshet359 7 років тому

    Teleportation is around the corner. This will be obsolete. :P

  • @archieohare
    @archieohare 7 років тому

    Look at this device:
    upload.wikimedia.org/wikipedia/ru/thumb/b/bf/Track_laying_and_renewal_train.jpg/600px-Track_laying_and_renewal_train.jpg
    and you'll see how to build track without any aux tracks.

  • @POBulkhead
    @POBulkhead 7 років тому

    Rail will never be as it was.

  • @IdleGod
    @IdleGod 8 років тому +1

    You would be better off using Rearden Metal.

  • @marthewinsor7270
    @marthewinsor7270 8 років тому

    ☺️☺️😘😘😘😘🎉´unimog

  • @johnnybosman1402
    @johnnybosman1402 8 років тому

    why is this in my recommended list

  • @higherperspectivephotography
    @higherperspectivephotography 8 років тому +3

    "inov at tive"

  • @Ashley_van_Schooneveld
    @Ashley_van_Schooneveld 5 років тому

    Long welded bars. There's no such word in railway terminology.

  • @listonoszpat233
    @listonoszpat233 8 років тому

    A może taki dźwig UK25 do układania i demontowania toru technologicznego ? ua-cam.com/video/3akYod22Uxo/v-deo.html

  • @chip2139
    @chip2139 4 роки тому

    The metric system is very confusing

  • @cosmicammity98
    @cosmicammity98 8 років тому

    Can you eat it?

  • @alassadgaming6111
    @alassadgaming6111 8 років тому +1

    one word: plane

  • @cassandraglowacki9251
    @cassandraglowacki9251 7 років тому

    PIty they can't even get a decent train system in Florida.

  • @rjmotovlog4198
    @rjmotovlog4198 8 років тому

    hi

  • @jdamian2943
    @jdamian2943 8 років тому

    Gorka, ¿TECSA no tenía este vídeo en una resolución mejor? ¿360 líneas de resolución en pleno siglo XXI? Ni el PAL ni el NTSC (siglo XX) tenían tan mala resolución de imagen.

  • @Warrior4Jesus71
    @Warrior4Jesus71 7 років тому

    I hope all Train Opertors and all Accepted Jesus, Well...?

  • @georgeb9256
    @georgeb9256 8 років тому

    Pity so much time is spent on explaining conventional method, do not think that is necessary! More input of the Tecsa system would be better. Rail personnel know only too well the conventional system. Thumbs up for me

  • @Ronaldoteorico
    @Ronaldoteorico 7 років тому

    meanwhile in Brazil...

  • @donaldtelfer8468
    @donaldtelfer8468 5 років тому

    Try again, use a scriptwriter who understands the processes and a narration that makes sense next time.

  • @akhlakkhan660
    @akhlakkhan660 7 років тому

    Mohd AKHLAK

  • @berdooflyer
    @berdooflyer 7 років тому

    So, they have to construct an "auxiliary track" first? Seems very inefficient to do so. American track laying operations are much more efficient than this system.

    • @GorkaArteta
      @GorkaArteta  7 років тому +1

      berdooflyer you haven't understand the video. the auxiliary track was used in the old way of mounting tracks... TECSA's development eliminates this works and lays directly the real over the sleepers.

  • @lyntwo
    @lyntwo 7 років тому

    My God. Just think of how much money Bain Capital could strip out of this. You need American Private Equity Firms to the stop this wasteful squandering of money in capital improvements.

  • @PacoOtis
    @PacoOtis 8 років тому +5

    Did we Americans make this video for you? Nobody else would have such shit intrusive and disruptive music nor would they make a video so boring. How could you make something so technically fascinating boring? Congratulations!

    • @yggdrasil9039
      @yggdrasil9039 8 років тому +2

      Since when in the last century did America build any railway track? They've been ripping up their railway for the last 75 years.

  • @يوسفالقيسي-ت5س
    @يوسفالقيسي-ت5س 6 років тому

    遍體驗票據點心理

  • @jorge67456
    @jorge67456 8 років тому

    Meditación

  • @teramasz
    @teramasz 8 років тому

    1:14 cmon BLM!

  • @Dufffaaa93
    @Dufffaaa93 8 років тому

    What am I doing with my life?

  • @coloradowilderness3139
    @coloradowilderness3139 7 років тому

    Save the money and buy the bomb

  • @waverleyrocker
    @waverleyrocker 8 років тому

    inn -ov -ative

  • @yourlove2554
    @yourlove2554 7 років тому

    tracks

  • @Rolingmetal
    @Rolingmetal 8 років тому

    I had a hard time following this track.

  • @mantuahmed7061
    @mantuahmed7061 7 років тому

    montu

  • @desdelcabo
    @desdelcabo 8 років тому

    Les ha faltado decir en qué condiciones laborales tienen a tus trabajadores. Al menos en España. Deplorables.

    • @GorkaArteta
      @GorkaArteta  8 років тому

      Pues en buenas condiciones, son trabajadores de la propia empresa no de subcontratas que llevan muchos años en la empresa, eso si con un trabajo duro como es el de la vía que aun requiere de muchísimo esfuerzo físico y de trabajar en situaciones meteorológicas extremas e inclementes. Se merecen todo el respeto y en esta empresa te aseguro que lo tienen.

    • @desdelcabo
      @desdelcabo 8 років тому

      Bueno, bien. Sí.

    • @johnarrese3213
      @johnarrese3213 7 років тому

      Saliendo de mucha opiniones, me gustaria contactar esta compañia Tecsa, pero estos aun no estan en el siglo 21, solo he conseguido su telefono y un numero de fax, fax? ya no se usa, necesito un e-mail address para comunicarme con ellos y poder darles la informacion de una nueva linea ferrea a construir en overseas, alguien puede asistirme con esto? mi crreo electronico es aesrl@hotmail.com gracias