Beam and slab shuttering

Поділитися
Вставка
  • Опубліковано 27 сер 2020
  • The shuttering process involves:
    1. marking the water level
    2. preparing the beam bottom
    3. setting out the beam bottom
    4. fixing the side boards
    5. elevating the span supports
    6. laying the sheets
    7. providing the Jack supports.
    Thank you for watching.
    #techcivil #beamshuttering #slabshuttering
    #shuttering #formwork #civilengineering
    Like, share and subscribe to this channel for more videos.

КОМЕНТАРІ • 23