    In this video I have explained full procedure of slab and beam bottom fixing and checking their levels using an auto levels directly on site. I have also shown it on drawing and all the calculations involved in checking levels If you liked it please subscribe to my channel and give a thumbs up on this video
    If you want more videos like this comment down below or you can connect with me on Instagram:
    Personal : @furqan.zari
    Official : @everything.civil
    Watch more videos like this :
    How Mahad Building collapsed?
    • How Mahad building col...
    Slab shuttering process shot on site
    • How slab shuttering an...
    3 Big Mistakes in Cantilever Beam
    • 3 Mistakes in Cantilev...
    Learn to read MEP sleeves Drawing
    • How to read MEP Sleeve...
    25 top selected practical civil engg questions
    • 25 Basic Practical Civ...
    Difference between stirrup and ties
    • Difference between sti...
    What is core cutting?
    • Is core cutting safe??...
    Column steel checking
    • CHECKING COLUMN REINFO...
    Design of two way slabs
    • DESIGN OF TWO WAY SLAB...
    #SlabLevel #AutoLevel #Surveying

КОМЕНТАРІ • 80

  • @hakemkhan3165
    @hakemkhan3165 3 роки тому +1

    Wow..really informative with theoretical explanation

  • @empoweracademy1322
    @empoweracademy1322 3 роки тому +1

    Very nicely explained.....Keep up the good work.

  • @modassariqbal306
    @modassariqbal306 3 роки тому +2

    Awesome videos sir 👌

  • @lostworld1462
    @lostworld1462 3 роки тому +2

    Really informative

  • @Avinashjadhav-qx2fr
    @Avinashjadhav-qx2fr 8 місяців тому

    Best teaching technique sir... thank u so much😊

  • @alphamaverick4537
    @alphamaverick4537 11 місяців тому

    Informative⚡

  • @minhajraja9809
    @minhajraja9809 2 роки тому

    Best video clearly

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 3 роки тому +1

    Exceptional video sir. U r a life saver. Thnx

  • @DilshadKhan-601
    @DilshadKhan-601 11 місяців тому

    Very helpful video than you sir

  • @MuhammadKamran-bx8ks
    @MuhammadKamran-bx8ks 3 роки тому +1

    Good👍

  • @abdulkareem-kg8jn
    @abdulkareem-kg8jn Рік тому

    sir. very thanks

  • @princemohanty6936
    @princemohanty6936 11 місяців тому

    Thanku sir 🙏🙏

  • @piyushraut2864
    @piyushraut2864 2 роки тому

    Thank u so much sir

  • @raffiehydermirza1803
    @raffiehydermirza1803 3 роки тому

    The best video of levelling. Thanks a lot bhai. Make more videos and help us

    • @EverythingCivil
      @EverythingCivil  3 роки тому +1

      Thanks..pls share.
      Yes will make on any topic u can recommend.

    • @raffiehydermirza1803
      @raffiehydermirza1803 3 роки тому

      @@EverythingCivil make videos on leveling bhai like how to take excavation of footings through autolevel and how to transfer the levels etc; with drawings

  • @SiyakantChaudhary-xg9dl
    @SiyakantChaudhary-xg9dl Рік тому

    Good sir

  • @gaganpatidar9907
    @gaganpatidar9907 3 роки тому +1

    very informative sir, can u share the size of shear walls, beams and columns with number of reinforcement. So we can idea about sizes of members for 20 storied building.

  • @bhagwatmane1668
    @bhagwatmane1668 Рік тому

    niceee broo

  • @saqibhussain5208
    @saqibhussain5208 2 роки тому

    thank you sooo much very informative lecture.

  • @flywithzunera
    @flywithzunera 3 роки тому +1

    Bhai 10000000 likes ka option kash hota

  • @sarthakmohapatra3738
    @sarthakmohapatra3738 3 роки тому

    Super

  • @pradippawar1709
    @pradippawar1709 3 роки тому

    Very nice explained
    Sir plz explain the first level is to be taken while excavation by TBM

  • @msprojectplanning
    @msprojectplanning 10 місяців тому

    Hero❤

  • @swapnilgaikwad7703
    @swapnilgaikwad7703 2 роки тому

    Very very important video sir thank you

  • @soumyaranjanpradhan6264
    @soumyaranjanpradhan6264 3 роки тому +1

    Very informative video... carry on brother

  • @raffiehydermirza1803
    @raffiehydermirza1803 3 роки тому

    Make a video on excavation of footings too with auto level with a drawing shown as example

  • @sibanandpradhan7535
    @sibanandpradhan7535 3 роки тому

    Thanks

  • @hdplanet7279
    @hdplanet7279 2 роки тому

    Nice video

  • @badalgallery
    @badalgallery 3 роки тому +1

    Nice

  • @saitulaseeramm1047
    @saitulaseeramm1047 3 роки тому +1

    Thank you sir... Well explained, keep posting like this

  • @rahulchandravansi4557
    @rahulchandravansi4557 Рік тому

    Sr bbs sikha dijiye jisase ekdam easy way me building ke sare drawing reading aur construction work bhi

  • @smileplease3600
    @smileplease3600 3 роки тому +2

    Bro ek baar sankan area k baare bi bta dte....kynki sakan area k bich m kyi baar ek beam ata h to uska size nhi dia hota h....to uski side nikalne m thora confesse ho jate h....

  • @letslearntv2692
    @letslearntv2692 3 місяці тому

    But how you put staff from 105 lvl in column when shuttering is already done to check level to take RL.

  • @modassariqbal306
    @modassariqbal306 3 роки тому +1

    Sir staff ko kaise read krte hai..us p v please 1 video banaye sir

  • @t.sstatus0198
    @t.sstatus0198 Рік тому

    Sir auto level upper stidia se lower stidia ka distance kitna hoga?

  • @ahmedfaiz1844
    @ahmedfaiz1844 3 роки тому +1

    Sir, I have small doubt plz clear me, as you mention your first slab level is 103.7m and u have transferred temporary RL on a column that is 105.20, as u said we can transfer it through the tape simply by adding 1.5 mts from 103.7 slab level we get 105.20, my doubt is if we are working with auto level plz correct if my calculation is wrong, either I have to do, keeping staff on slab level we get some value let us example I am taking here 2.00m staff reading then the calculation must be (103.7+2.00=105.7) then we have to see 2.00mts from the staff and mark the point 105.7 as temporary RL right sir plz correct me or I have to assume directly 105.20 and then subtracting with 103.7 the value which we get should be marked by auto level plz correct me, and sir my one more doubt is as u got RL of the line of sight is 108.20mts on top of slab from your last temporary RL, and after marking this point anywhere on top of the slab, and as u said by subtracting from slab bottom level we get 1.05 and we have cross check through auto level but one of my SR.engineer first he use take height of instrument that is for example from your reference point (108.20 + staff reading) - slab bottom level) the value which he gets he use to cross-check and from that he used to correct slab level, sir plz don't mind I am a fresher civil engineer so that's the reason I have asked my doubt, plz clear my doubts, overall the information u shared is helpful, thank you.

  • @sunitashrestha9710
    @sunitashrestha9710 3 роки тому +1

    Last is rl transfer then levelling

  • @badalgallery
    @badalgallery 3 роки тому +2

    What should be casting level of coloum..It's ok if column casting level is above the bottom of beam shuttering.

    • @EverythingCivil
      @EverythingCivil  3 роки тому +1

      Yes it should be atleast 3-4 inches above beam bottom level.

    • @badalgallery
      @badalgallery 3 роки тому +1

      If column casting is above shuttering level of beam then cover under beam will increase in comparison of column buz bottom bar will rest on column ..Is it ok??

    • @EverythingCivil
      @EverythingCivil  3 роки тому +2

      Yes. You are absolutely right.. we must make sure that beam bar is straight and column casting to be done such that required cover is available below the bottom bar.

    • @srisidhu5329
      @srisidhu5329 3 роки тому

      @@EverythingCivil you should have done on slab leveling..

  • @nandkumarmestry2632
    @nandkumarmestry2632 4 місяці тому

    slab casting ek din me pura nahi ho to dusare din banate samay kya care lene chahiye

  • @nileshsonawane324
    @nileshsonawane324 3 роки тому

    Natural ground level ko 100rl liya hai kya sir...

  • @animeshadak3271
    @animeshadak3271 3 роки тому +1

    COLOUMN ME JO RL FIX KIYA WO KAYSE KIYA?

    • @EverythingCivil
      @EverythingCivil  3 роки тому

      Project ka temporary benchmark ke hisab se hai..GL ko 100 RL lete hai.

  • @mohammadvahid1318
    @mohammadvahid1318 2 роки тому

    Site p full detail m video bnao

  • @dennisngugi748
    @dennisngugi748 Рік тому

    Bring us the English version

  • @KundanKumar-wx9gk
    @KundanKumar-wx9gk 10 місяців тому

    Bhai aapne achche se Sam jhaye

  • @vikash3200
    @vikash3200 3 роки тому

    Shuttering ke bad column se S1 slab ka RL kase lenge

    • @EverythingCivil
      @EverythingCivil  3 роки тому

      Niche ke column pe level marking hogi waha se utahyege upar ke reinforce bar pe aur waha se baki slab ka level hoga

    • @vikash3200
      @vikash3200 3 роки тому

      @@EverythingCivil shuttering ke pahle

    • @EverythingCivil
      @EverythingCivil  3 роки тому

      Find out height of slab bottom level from column marking then accordingly mark that level on reinforcement bar..

  • @sonugupta7593
    @sonugupta7593 3 роки тому

    Ya bhi bt do Beam ka bottom kitne per lagta hai yah kaise pata Karen plz reply dijiyega

    • @EverythingCivil
      @EverythingCivil  3 роки тому

      Apko kya janna hai detail me bataiye apko answer karta hu mai.

    • @sonugupta7593
      @sonugupta7593 3 роки тому

      @@EverythingCivil building ki slab dalti hai Kuchh shuttering hoti hai na bheem ka bottom hota hai vah kaise decide hota hai kitni height per lagega Mujhe Janna hai Janna hai

    • @sonugupta7593
      @sonugupta7593 3 роки тому

      @@EverythingCivil beam bottom kitne hight per lagega kaise pata Karen

    • @EverythingCivil
      @EverythingCivil  3 роки тому

      Pehle ap check karo ke apki floor to floor height kitni hai aur dekho ke beam depth kitni hai..samjho ke beam depth 500mm hai to apka beam bottom slab ke level se 500m down baithega column pe

    • @sonugupta7593
      @sonugupta7593 3 роки тому

      @@EverythingCivil video Kyon Nahin banate sir

  • @amirahmadkhan1686
    @amirahmadkhan1686 Рік тому

    جناب فٹ کے حساب سے کرو

  • @shubhamkasat9688
    @shubhamkasat9688 3 роки тому

    You depicted a wrong method.The level marking on column can't be taken from the slab level of 103.7 meter. You have to transfer TBM using auto level. TBM should be accurately defined. In your case, can you guarantee that the slab is accurately poured at 103.7 meter ? Answer is NO. Slab pour may be tight or slack from the actual 103.7 meter, which will only lead to uneven transfer of 105.2 meter on every column and eventually would lead to uneven level of upper slab and beam bottom shuttering. TBM may have to be shifted from the bottom floor. For that we have to calculate H.I.= R.L.(known) + Staff reading(from auto level). Then, your desired 105.2 m or any reading to be marked on column can be taken using auto level as you will already know staff reading needed to achieve TBM of 105.2 meter. H.I. - 105.2 = Staff reading (to be marked on column using staff and auto level). And you haven't even used auto level, simply measuring tape. Dude, please don't teach the wrong method, you may as well land engineer's into serious trouble.

    • @EverythingCivil
      @EverythingCivil  3 роки тому

      Below ground for the first time level marking is done with the reference to the T.B.M and after that is done once level marking is done on upper columns by transferring it from the level marking of below column.