Our first complete whole house project. House wiring, L.V. and Solar!

Поділитися
Вставка
  • Опубліковано 5 лис 2024

КОМЕНТАРІ • 5

  • @YaksAttack
    @YaksAttack 2 місяці тому

    Here in NJ i would have bid that out at ~$30k-$35k minus the solar because I dont do that. How much did you charge if you dont mind me asking? It looks clean.

    • @AGEElectricInc
      @AGEElectricInc  2 місяці тому +1

      Oh man, I would like that NJ price! We're in WA and we did this for $17k, not including the solar, so about $9.50 a sq./ft. This was a little less than our normal pricing as it was for an educational institution that does the build with the involvement of high school kids to expose them to construction. They can help with certain trade work that doesn't require licensing. So they couldn't really do much with us but we donated more time than anything and a few demos ( conduit bending, makeup,etc.) to help expose them to the electrical trade.

  • @Eightball2516
    @Eightball2516 2 місяці тому

    The only thing I don’t see are smoke and carbon detectors in the bedrooms and hallways

    • @AGEElectricInc
      @AGEElectricInc  2 місяці тому

      They are all there but I did seem to only get the heat detector in the garage in the video and 1 glimpse of a bedroom smoke at 4:07. The smokes still had the red dust protectors on them. But we had 4- smokes, 2- carbon/smokes and 1- heat in this build. Thanks for bringing that to my attention, I will make sure to capture those in future videos!

    • @TheFacilityguy
      @TheFacilityguy 2 місяці тому

      Looks good. 👍