Ideal UTILITY ROOM layout for Electrical, Mechanical, & Plumbing (077)

Поділитися
Вставка
  • Опубліковано 6 жов 2024
  • We extend our loft wall to install 1-1/2" of XPS foam board insulation, increasing the wall's overall R-value. We also frame our utility room with non-load-bearing walls, creating enclosures for the perfect utility room layout.
    Recording date: 29 July 2021

КОМЕНТАРІ • 2

  • @bradfa
    @bradfa 3 роки тому +1

    That looks awesome!

    • @wanderwoodfarm3801
      @wanderwoodfarm3801  3 роки тому

      Thanks. We like it too. It’s a long process, but a well designed mech room makes us happy.