Vancouver SkyTrain Ride - Single Tracking from Edmonds to New Westminster, February 2023
Вставка
- Опубліковано 30 тра 2024
- Become a member of the channel:
/ @upliftvancouver
Join my Discord server:
/ discord
(02/11/2023) In February 2023, some fibre optic cable work along a part of the Expo Line resulted in some rare day time single tracking between Edmonds & New Westminster. - Наука та технологія
@0:04, 8:38, 12:03 the announcement was so long the door bell sound was like “I had enough of this” 😂
I Remember doing this Track Work!
Well it's Fiber Optic Cable work but I still call it Track work lol
how does single tracking work with driverless trains?
At the control centre people have the job of monitoring trains on a computer screen. This sometimes requires rerouting trains and controlling switches anywhere on the Expo and Millennium line. Every train is represented on screen and each train must have a free block / track section between the switches. If there is a complex situation or a computer disagreement or loss of contact with the operations centre, a Skytrain attendant can manually operate a train all while in radio contact with operations.