How to Upgrade A Panel to 100-Amps | Complete Electrical Service Upgrade

Поділитися
Вставка
  • Опубліковано 5 жов 2024
  • In this video I replace all of the existing electrical service equipment and upgrade to a new 100A Main Breaker 20-circuit panel. This video includes the installation of the two ground rods, an exterior bonding bridge, and the grounding electrode connection to the main water pipe.
    This work requires a permit and inspection.
    Classic Electric, LLC | Point Pleasant, New Jersey
    License & Business # 16557
    (732)-770-1437
    Ron Pecina Jr. is a licensed electrician in the state of New Jersey. This allows him to apply for electrical permits, work with live conductors, remove meters, and disconnect service from the utility company. New Jersey observes the 2020 NEC and the Uniform Construction Code. The majority of the work seen here on this channel falls under the Rehabilitation Sub Code (Chapter 6 of the U.C.C.).
    ALL New Jersey licensed electricians MUST complete 34-hours of continuing education units each tricentennial period. This includes a mandatory 10-hour code update course. Any work above 10-volts requires an electrical license in New Jersey.
    Ron is an active member of the New Jersey Independent Electrical Contractors Association.
    Become an NJ-IEC member here: www.nj-iec.org
    IEC National: www.ieci.org
    WANT TO SEE MORE? How to wire a Generac Standby Generator. WATCH HERE: • Generac Generator Inst...
    Classic Electric, LLC is a Generac standby air-cooled generator installer. Generac Dealer # 1019500
    Camera: Go Pro 9/ 10.
    Editing software: Apple iMovie
    Animation software: Apple Keynote
    Like, Share, and Subscribe!
    Electrical Wiring is NOT a hobby. Call a licensed electrician.

КОМЕНТАРІ • 164