Розмір відео: 1280 X 720853 X 480640 X 360
Показувати елементи керування програвачем
Автоматичне відтворення
Автоповтор
all videos are very much insightful.
Great. .👍👍👍👍👍👍👍👍
Thanks, Ejai
Could anyone tell me if cross-ripping (say at a 30º or 45º angle) is better than a single pass? Doesn't the second pass compact partially what had already been loosened?
Let's talk about it, Antonio
Good questions, but the answer is not straightforward because there are many parameters to consider, to get it right, but it CAN be done
Brilliant. Thanks for the lesson. My next job is a double Tyne rip on some ground that stood for 25years
Great, go for it!
“What a littl’ ripper’, John! WHAT IS the Maximum Depth You have ripped down-to, and sampled for ( say) metal elements?
Ripping was effective to ~ 80 cm (check on Penetrometer), we needed to brake extremely nasty compaction caused by bad management
Love how you shove it down where the blades ran. What about where they did not.
He does, did you watch it all?
Great work!
Thank you, check on this one as well ua-cam.com/video/5vcX51Mjxj8/v-deo.html
put the guage in between the rip slots
We did - watch again
@@johnrasic8051 you put it on the slot the shank made, not between
No sound?
purposefully not because it's spontaneously made and not produced, and then bits and pieces are pulled together
👌👌👌👌👌👌👌👌🇰🇿🇰🇿
thank you..
Dude is pressing the prod thing where the ripper went where there is not mutch dirt
Your understanding of soil compaction, ripping and quality control is 'impressive' 😂
@@johnrasic8051 cheers
so much for the field tile 🙄
who is talking here about field tile?
all videos are very much insightful.
Great. .👍👍👍👍👍👍👍👍
Thanks, Ejai
Could anyone tell me if cross-ripping (say at a 30º or 45º angle) is better than a single pass? Doesn't the second pass compact partially what had already been loosened?
Let's talk about it, Antonio
Good questions, but the answer is not straightforward because there are many parameters to consider, to get it right, but it CAN be done
Brilliant. Thanks for the lesson. My next job is a double Tyne rip on some ground that stood for 25years
Great, go for it!
“What a littl’ ripper’, John! WHAT IS the Maximum Depth You have ripped down-to, and sampled for ( say) metal elements?
Ripping was effective to ~ 80 cm (check on Penetrometer), we needed to brake extremely nasty compaction caused by bad management
Love how you shove it down where the blades ran. What about where they did not.
He does, did you watch it all?
Great work!
Thank you, check on this one as well ua-cam.com/video/5vcX51Mjxj8/v-deo.html
put the guage in between the rip slots
We did - watch again
@@johnrasic8051 you put it on the slot the shank made, not between
No sound?
purposefully not because it's spontaneously made and not produced, and then bits and pieces are pulled together
👌👌👌👌👌👌👌👌🇰🇿🇰🇿
thank you..
Dude is pressing the prod thing where the ripper went where there is not mutch dirt
Your understanding of soil compaction, ripping and quality control is 'impressive' 😂
@@johnrasic8051 cheers
so much for the field tile 🙄
who is talking here about field tile?