sir lecture is very informative thanks u so much sir and request u please take lecture on thin White topping for widening of carriageway and its real time problems in wideing specifically uneven settlement between new and old
Thank u sir I want design cc pavement in vented Causeway I want to provide casing around the pipes and 100mm thick over pipes with M10. What is the value of K I should adopt for calculation of Thickness
Dear sir, pls suggest me if expousre condition is severe. Then how will select minimum cement content & w/c ratio for M-15 PCC.as per is 456-2000 & morth ,when expousre condition is severe then minimum grade of concrete M-30. Now i have little confusion where expousre condition is severe and we use M-15. Then what is minimum cement & w/c ratio
@@SatishIITR yes sir but i want to know when design M-15,M-20, & M-25 design for any struture work then how will decided minimum cement content and w/c. Ratio for severe condition
Sir, As per IRC 58(2015), the temperature gradient values are 15.6, 16.4, 16.6, and 16.8 for ZONE 3. But in the Excel sheet, it shows 19. Can you please explain it?
Sir if gsb and wbm g3 is taken then above wbm the pcc or dlc should be taken or not
Not necessary. Depends on design traffic
Thankyou very much sir. I will practice numericals on it and make one excel sheet myself.
All the best.
Sir as per irc sp 62 for cvpd 50 we can take 100 mm gsb and 75 mm wbm and concrete slab na
Yes
sir lecture is very informative thanks u so much sir and request u please take lecture on thin White topping for widening of carriageway and its real time problems in wideing specifically uneven settlement between new and old
I have already uploaded a video on white topping. Watch it
Nice lecture, sir!
Thank you so much. Keep watching
Thank u sir I want design cc pavement in vented Causeway I want to provide casing around the pipes and 100mm thick over pipes with M10. What is the value of K I should adopt for calculation of Thickness
M10 is as good as Dry lean concrete. If putting cc slab directly over M10 concrete, then k values may be taken from the table given in IRC 58
Dear sir, pls suggest me if expousre condition is severe. Then how will select minimum cement content & w/c ratio for M-15 PCC.as per is 456-2000 & morth ,when expousre condition is severe then minimum grade of concrete M-30. Now i have little confusion where expousre condition is severe and we use M-15. Then what is minimum cement & w/c ratio
M15 concrete is not permitted in roads. The minimum grade is M30
@@SatishIITR yes sir but i want to know when design M-15,M-20, & M-25 design for any struture work then how will decided minimum cement content and w/c. Ratio for severe condition
Structure work as like M15 pcc
M-25 RCC
I think you should refer IS 456, if your query pertains to use of concrete in structures.@@ankitdubey644
Sir, As per IRC 58(2015), the temperature gradient values are 15.6, 16.4, 16.6, and 16.8 for ZONE 3. But in the Excel sheet, it shows 19. Can you please explain it?
Let me check. Is it the sheet which you have downloaded or you observed in the video?
I observed this in your video. @@SatishIITR
Oh, might be some error. will check it.@@KOMALVASANTRAO
Thank you sir....
Most welcome. Share the link with others also.
Sir how to calculate value of C while calculating temperature stresses ?? Please explain
C is taken from Bradbury's chart. It is based on L/l or W/l
Thank you sir
So nice of you, keep watching
Sir can we go for pcc m-35
Yes, you can. But design accordingly
Ok sir and thanks again for ur guidence
Thank you sir. Your video is very helpful. Please share the link of excel sheet.
Thank you
Thanks sir
Welcome, keep watching
Respected sir can u provide excel sheet
Please sir provide excel sheet
My file got corrupted now.
Respected Sir, Please Share Excel sheet for me
Ok
Done
Thank you ji
sir can i get excel sheet please ?
Shared
Respected Sir, Please give me Excel sheet
I shared this excel sheet with many viewers, but the file got corrupted now. You can get it from IRC
Sir can you please send Excel sheet of designing rigid pavement for low volume road
you can download it
Thank you so much Sir
Sir I have also sent the access request.
Please accept my access request.
Thank you in advance 😊
Sir what shall be provision for dowel bars and other reinforcement for all the three cases.
Not been able to access the sheet sir
Sir, can you provide an Excel sheet
Get it from IRC
SIR EXCEL SHHET PLZ..
Ok
Sir yet not received plz share excel sheet
@@sachitaconstruction send the request again
@@SatishIITR sir can u provide Excel sheet
Please sir can u provide excel sheet
kindly share with me excel sir, i have requested access
Ok
Please accept the request for accessing the google sheet @SatishIITR
Shared