Thanks Andreas. I just installed a new bridge over the rail yard for the upper double main. The upper level probably won't be operational until 2025, but the bridges will make things a little more interesting. Shane.
Thanks Chevy. Between the smoke and the rain, I was starting to wonder if I'd have a big op. this year. The weather is finally co-operating. If you're ever in the area, the Work900 is always upstairs, and takes about 15 minutes to set up.
Thanks JR. After telling you during the livestream how little snow I've had this year, we were hit with a blizzard last night, and I've been digging out from under 2 feet of snow. :O I guess I should have kept my mouth shut. :P
Hey man! Big question; If you remember your (Tonka Move) from Sept 2021, do you know where that location was at, because I’m trying to look up that subdivision name. I tried to read the CN signs in my best pixelated setting for that video and I just couldn’t read the names
Great job. Greetings from Germany, Andreas
Thanks Andreas. I just installed a new bridge over the rail yard for the upper double main. The upper level probably won't be operational until 2025, but the bridges will make things a little more interesting. Shane.
Great layout. Love the camera work. Great views. Joe in Colorado Rockies
Thanks Joe. I'm glad you liked it.
Great job watching from Queensland Australia
Thanks J&J. Spring is here and I'm looking forward to getting the trains running again.
Everything looks great young feller. Well done 👏👏
Thanks Chevy. Between the smoke and the rain, I was starting to wonder if I'd have a big op. this year. The weather is finally co-operating. If you're ever in the area, the Work900 is always upstairs, and takes about 15 minutes to set up.
Great looking layout very superb consider me your newest subscriber.
Thanks JR. After telling you during the livestream how little snow I've had this year, we were hit with a blizzard last night, and I've been digging out from under 2 feet of snow. :O I guess I should have kept my mouth shut. :P
Awesome Layout and session
Thanks James.
Nicely done.
Thanks Robert.
Linda essa maquete parabéns a minha é de jardim também só na escala ho
Obrigado, vou ter que dar uma olhada no seu canal.
Ferrovia de jardim escala ho ou trens de jardim
Procor! Looks great shane!
Thanks Kyle. The Procor is to lure you in. :P
Incredible
Thanks David.
Great layout.
Thanks Paul.
Thanks. I’ve subscribed to your channel. Lots of very good videos.
@@paultorrey Thanks. I enjoy your videos too.
Love the 50' gondolas! Who makes them?
Hi Mark. They are scratch built. I have 13 complete and seven more under construction.
Hey man! Big question; If you remember your (Tonka Move) from Sept 2021, do you know where that location was at, because I’m trying to look up that subdivision name. I tried to read the CN signs in my best pixelated setting for that video and I just couldn’t read the names
Hi Trainmansky. Give me a few weeks, and I'll check with the foreman who took the video.
@@CanadianrailroadsCa ok thx!
Hi Trainmansky. I was finally able to talk to the foreman, and after two years he's not 100% sure, but he believes it was the Fraser Sub..
And E8s !
You bet, but I pretend they are E9's. :)
Nice!
Thanks GstarEdms
aspirational
🙂
Is there a track plan?
Hi Norbertdx. It's a work in progress, so there isn't really a set plan at the moment.
very very nice, but oh so expensive unfortunately.
Thanks RiverGlades Garden Railroad. Yes, prices have certainly been heading in the wrong direction.
To this day i cant find any aristocraft dash-9s for less than (insert absurd amount over $1k usd) lol!
Yes, people are certainly asking a lot, and some of them look pretty rough.
Is that your garden layout?
Hi Hunter. Yes it is. Still needs a lot of work, but I'm enjoying it.