  • For the parking pads, we scraped off the topsoil down to a solid sub-base, then added ABC (crusher run) and compacted it. Once we were done with that, we topped it off with #57 washed stone, and compacted again. For the sidewalks, we stripped the topsoil, then added #57 stone and compacted it. Had a little issue after the first big rain, so we scraped off the #57, then added more ABC to bring the low area up about 2 inches and compacted it. We re-spread the gravel, then we compacted it again. Everything checked out with a laser and we loaded up and were on our way.