Loft Conversion Start to Finish Timelapse

Поділитися
Вставка
  • Опубліковано 29 вер 2024

КОМЕНТАРІ • 155

  • @peterwhitehouse5234
    @peterwhitehouse5234 4 роки тому +1

    Hi can I ask how the ridge steel in supported ? On the table end I mean ?
    Great job ..

    • @robsands111
      @robsands111  4 роки тому

      Hi Peter. We raised the gable wall up with brick. On the video it shows only the temporary timber frame but by the time it was bricked up it was out of view of the timelapse camera.

  • @sohaildarwish6324
    @sohaildarwish6324 6 років тому +7

    How much did that cost

  • @andrewjames4346
    @andrewjames4346 7 років тому

    why did you oppt for a single full dormer rather than two. the square footage provided by another dormer would have been more cost effective as the roof was coming off regardless. also how did you construct the gable end?

    • @robsands111
      @robsands111  6 років тому

      I'm not sure I understand your question about the two dormers. Gable end is brick.

  • @Reduced009
    @Reduced009 3 роки тому

    Is it possible to get a dormer both sides to expand it fully?

    • @robsands111
      @robsands111  3 роки тому

      Good question. This would be down to your planning application. I guess it is possible but in my case I was only allowed a velux on the front facing side.

    • @Reduced009
      @Reduced009 3 роки тому

      Rob Sands if I do it without planning permissions how many years would it take for me to get away with it ?

    • @robsands111
      @robsands111  3 роки тому

      Go for it. Im sure you’ll appreciate it

    • @Reduced009
      @Reduced009 3 роки тому

      Rob Sands how many years does it take for them to not be able to do anything and force me to remove it?

    • @robsands111
      @robsands111  3 роки тому

      Im sorry I have no idea.

  • @mrp2868
    @mrp2868 4 роки тому +3

    I had something similar done and it cost me £3590 to do

  • @xxnickthegreekxx
    @xxnickthegreekxx 6 років тому +4

    Typical shit weather nice job done properly

  • @CraftyTan
    @CraftyTan 5 років тому +2

    Thought these were made from brick is this American or England

    • @robsands111
      @robsands111  5 років тому +1

      Wood & clay tile on rear, brick on the side and roofing tiles on front

  • @sarahstevens8190
    @sarahstevens8190 6 років тому +3

    Hi if u dont mind me asking how much was this conversion? Looking at getting one done. Thanks

    • @robsands111
      @robsands111  6 років тому +3

      around 35K but that was with lowering of 1st floor celings too.

  • @gdfggggg
    @gdfggggg 5 років тому +3

    8 weeks is phenomenally quick. I just did one with just two men and it took us at least double that, working a 40h week. I’ve never seen one go up that quick. Very impressed.

    • @robsands111
      @robsands111  5 років тому +1

      Truthfully it was. On a 40 hr week. Checkout the daily timelapse vids on previous posts

    • @kamilc5097
      @kamilc5097 4 роки тому +2

      May I know muuch ist the cost?

  • @KarenWhitton-yk5mt
    @KarenWhitton-yk5mt 3 місяці тому

    How high was the ceiling height please? And what was the cost and additional volume?

    • @robsands111
      @robsands111  3 місяці тому

      Its 2.2 metres in height and gave us 6m x 5m floor space. This pryis a few years old now so costs would no longer apply. I guess in today’s money it would be about 55 - 60 k

  • @howtodoitdude1662
    @howtodoitdude1662 2 роки тому

    The existing roof was removed after the exterior was done?

    • @robsands111
      @robsands111  2 роки тому

      The remaining part yes. Some of it was removed to build the structure. Also there was other work’s going on as the ceilings in the bedrooms were lowered.

  • @scarboroughrider
    @scarboroughrider 7 років тому +9

    What was cost and also presume one room was an en-suite and other storage?

    • @gracestanfield831
      @gracestanfield831 4 роки тому +1

      Rob Tomlinson also could’ve been a walk in wardrobe

  • @user-ju8iw1mx8r
    @user-ju8iw1mx8r 5 років тому +2

    hey , whats these guys contact details?

  • @Pushyhog
    @Pushyhog 3 роки тому +1

    mother n law moving in! l would never live there, rains to much.

    • @robsands111
      @robsands111  3 роки тому

      Definately no MIL!!! It does rain here a lot.

  • @Aramiak
    @Aramiak 3 роки тому +1

    Great stuff. Looks great. Did you find it difficult to find a builder who was confident with dealing with the lowering of the ceilings part of the job? I'm looking to have something similar done and I have wondered whether it is difficult to find a contractor with the experience and confidence to do it? Thanks for sharing to the Tube. 👍

    • @robsands111
      @robsands111  3 роки тому +2

      Many thanks for your comments. The contractor who did the conversion was confident in lowering the ceilings but also measurements on the stairs too. Just perfect without loosing any of the small room.

  • @andybrown169
    @andybrown169 3 роки тому +1

    Appreciate the need for more space on these buildings, but they look a bloody eyesore from the ground, a shed stuck on the roof.

    • @robsands111
      @robsands111  3 роки тому +1

      How can I argue with that? I do appreciate the comment. Unfortunately planning permission will only be granted to certain builds and design. As there are other properties in the area with similar conversions mine had to fall in line.

    • @andybrown169
      @andybrown169 3 роки тому +1

      @@robsands111 unfortunately where I live, the neighbours did exactly what you did and no planning permission was required, only building regs. It’s a dammed eyesore, that’s where my gripe is .
      I’m not knocking your workmanship.

  • @robertgoh7420
    @robertgoh7420 Рік тому

    Did the stairs cut across the landing window?

  • @kawabarzanji
    @kawabarzanji 5 років тому +2

    Are you based in Manchester ?,great video,My house is as big as this,how much this costs you in total?Can you do it for me as well ?. Thanks

    • @robsands111
      @robsands111  5 років тому +4

      Birmingham. Its an ongoing project on my house.

    • @racquelholness169
      @racquelholness169 4 роки тому

      @@robsands111 Hi, this is something i am looking to do at the start of 2021. let me know if you will be free
      many thanks
      i live in the sandwell area west MIDLANDS

    • @racquelholness169
      @racquelholness169 4 роки тому

      send over the person details that did the work

    • @mali5591
      @mali5591 3 роки тому

      @@robsands111 hiya, have you got any contact details?

  • @George-o6u9m
    @George-o6u9m 7 років тому +3

    how did you attach the existing front rafters to the ridge beam.were they sat on top of the steel or attached to a timber infill in the web.

    • @robsands111
      @robsands111  7 років тому +2

      They were attached to a timber infill. The infills were mounted and bolted to the beam both sides.

    • @robsands111
      @robsands111  7 років тому +1

      If you look at about 1:30 you can see.

  • @SuperRockyfour
    @SuperRockyfour 5 років тому +3

    Nice work Rob!! Did this include on en-suite??

    • @robsands111
      @robsands111  5 років тому +3

      Yes if you go to my other vids you will see the finished product. Ive been in there two years now and well pleased

    • @rmdhs4604
      @rmdhs4604 3 роки тому

      How much?

    • @RedwolfDogrocket
      @RedwolfDogrocket 3 роки тому

      @@rmdhs4604 I too would like a ballpark overestimate as timber is stupid prices these days.

  • @catabaticanabatic3800
    @catabaticanabatic3800 5 років тому +1

    A great video. Niceone,thanks for sharing.

  • @lancelee831
    @lancelee831 6 років тому +1

    Hello Rob,great video,My house is as big as yours,how much this costs you in total?cheers

  • @maliofficial_7028
    @maliofficial_7028 4 роки тому +1

    Amazing

  • @almtuzelity6606
    @almtuzelity6606 6 років тому +1

    great work! How long did this take to do? was there on suite too?

  • @BramVanhautte
    @BramVanhautte 3 роки тому

    How much did this total project cost you?

  • @bradleyroberts5459
    @bradleyroberts5459 3 роки тому

    How much did it cost and how long start to finish

  • @mrt5424
    @mrt5424 3 роки тому

    My neighbour's had a on suite dormer loft extension built on a semi detached property. All brick work to the side of the dormer for 25k. Your work looks amazing what do you charge for dormer extension on a semi detached house .

    • @robsands111
      @robsands111  3 роки тому

      Hi Harris many thanks. This was my property and it cost 35k.

  • @SlightlyMisunderstood
    @SlightlyMisunderstood 4 роки тому

    Very nice video. Was looking at potentially doing one of these on my home. Still evaluating it all and potential costs etc. My house is an L shape terraced.

  • @jako530
    @jako530 3 роки тому

    What thickness insulation did you use and also what's the thin silver sheet you please on the internal ceiling prior to plasterboard?

    • @robsands111
      @robsands111  3 роки тому

      Hi. We used 120mm insulation board then multi layer foil insulation.

  • @patricksheehan8157
    @patricksheehan8157 5 років тому +2

    Nice work on the loft conversion. But, absolutely horrible music. Sounds like a toddler got a hold of a synthesizer.

  • @nashonline
    @nashonline 3 роки тому

    can someone explain to me why anyone would dislike this video

  • @TELEVISIBLE
    @TELEVISIBLE 3 роки тому

    I admire those who managed their own project, I would stress out and never get it finish😅

  • @thetruthtellerlondon5742
    @thetruthtellerlondon5742 7 років тому +1

    are you based in london

  • @psd99
    @psd99 3 роки тому

    Hi nice work can you tell me which camera you used to capture this?

    • @robsands111
      @robsands111  3 роки тому

      I used a hikvision camera and captured the a frame every 10 seconds. The software was IPTimelapse. iptimelapse.com/

  • @shalashaska615
    @shalashaska615 5 років тому

    What’s that scaffolding called that looks like stage rigging?

    • @robsands111
      @robsands111  5 років тому

      I don’t know it was a scaffold company I brought in.

  • @depletionmode
    @depletionmode 5 років тому

    What was the starting joist-to-rafter height of the loft before the work? (i.e. before lowering floor, etc.)

    • @robsands111
      @robsands111  5 років тому +1

      Sorry David I cant remember. I know it was close to the limit and once all of the insulation would have gone in we wouldn’t have had enough clearance for building regs. But to add to that we would have had to reinforce floor too. So it was easier to drop the floor and start fresh with bigger timbers.

  • @sirajuli5698
    @sirajuli5698 7 років тому +4

    Awesome Exactly what I was looking for

  • @user-xl7fn9zf6b
    @user-xl7fn9zf6b 4 роки тому

    We are going to get same thing done i never knew you get full dormer done then get rid of old roof

    • @robsands111
      @robsands111  3 роки тому +1

      Yes it helps to keep the water out. Good luck with the build.

  • @Ironbuket
    @Ironbuket 5 років тому +1

    0:05 What does hip to gable loft conversion with lowered ceilings mean? What ceilings were lowered, the room below?

    • @robsands111
      @robsands111  5 років тому +6

      The side slope was straightened and yes the rooms below ceilings were lowered as planning would not allow the top of the roof ridge to be made higher. To comply with internal heights for the loft rooms the ceilings had to be lowered 300mm.

    • @plummetplum
      @plummetplum 3 роки тому

      @@robsands111 What's the min height required is it 2m at the stairs? My roof space is not that tall, want to see if feasible. What's the min floor joist and roof space I could typically get away with in a conversation? Thanks

    • @robsands111
      @robsands111  3 роки тому

      Hi I think the bare mimimum was 2m but we managed to get it to 2.1m. We had to lower the ceiling from the floor below like you we did not have the roof space. Also the floor joists would not have supported it. So it was easier and just as cheap to lower the 1st floor ceilings. This way it ensured we had everything covered building regs wise, I now have new ceilings in the bedrooms below and everything is straight.

  • @bulidingforever4109
    @bulidingforever4109 3 роки тому

    Amaizing! How much time start to finish?

  • @SteveRogers461
    @SteveRogers461 4 роки тому

    Fantastic video!!! Great builders!!! Thank you for sharing!!!

  • @gdfggggg
    @gdfggggg 6 років тому

    Hi, how do you guarantee a watertight seal around the windows? Thanks

  • @keepitmoving5440
    @keepitmoving5440 6 років тому

    This is Impressive work for 2 people! How many weeks did it take!? And what was the overall cost?? I'm planning a conversion but keeping the roof as it is.

    • @robsands111
      @robsands111  6 років тому +1

      around 8 weeks and 35k but that was lowering of the 1st floor ceilings too.

  • @MrHayseg
    @MrHayseg 4 роки тому

    Looks very professional. What timekapse camera did you use ? Brand etc im going to be doing a project at mine and would appreciate your advice on whst camera u used.

    • @robsands111
      @robsands111  4 роки тому +1

      It was a Hikvision IP camera and captured by software IPTimelapse

    • @MrHayseg
      @MrHayseg 4 роки тому

      @@robsands111 thankyou:)

  • @batamist
    @batamist 3 роки тому

    July an August and no any sunshine ?

    • @robsands111
      @robsands111  3 роки тому

      Plenty! Clear blue skies and lads have shirts off..

  • @nondompom
    @nondompom 4 роки тому

    Does the cost of the conversion equal the new value of your house afterwards ?

    • @user-xl7fn9zf6b
      @user-xl7fn9zf6b 4 роки тому +1

      The value would go up but not as much as the conversion cost you

  • @Optimus-Prime-Rib
    @Optimus-Prime-Rib 4 роки тому

    Do u have to move out while they do the work?

    • @robsands111
      @robsands111  4 роки тому

      We moved to the ground floor. But if I did it again I would certainly move out for a while.

  • @gooddayletsgame2037
    @gooddayletsgame2037 4 роки тому

    Bg

  • @ianhenson724
    @ianhenson724 3 роки тому

    stickers still on windows.

  • @ErdoganCEVHER
    @ErdoganCEVHER 6 років тому

    Thx for the video. Could u please share the total cost of the project?

    • @robsands111
      @robsands111  6 років тому

      around 35k but that was lowering of the 1st floor ceilings too.

  • @johnpaulholden
    @johnpaulholden 5 років тому

    Hi Rob do you cover Streetly Sutton Coldfield?

    • @robsands111
      @robsands111  5 років тому

      Hi John. This was my house. The loft company was www.warmerslofts.co.uk

    • @robsands111
      @robsands111  5 років тому

      warmerslofts.co.uk

  • @hakoonamatata8396
    @hakoonamatata8396 6 років тому

    Very nice, u guys did a great job 👍

  • @Bob3D2000
    @Bob3D2000 5 років тому

    Interesting and hypnotic.

  • @darrenmorris8258
    @darrenmorris8258 7 років тому

    hi what was the cost of this?

  • @oliverturner4330
    @oliverturner4330 6 років тому

    How long did this take ??

  • @jackbisson9226
    @jackbisson9226 3 роки тому

    Awesome work!

  • @The-Carpenter88
    @The-Carpenter88 3 роки тому

    Great job!

  • @kevinkeenan4678
    @kevinkeenan4678 4 роки тому

    Great job

  • @michaelfuentes9328
    @michaelfuentes9328 6 років тому

    How much was spent?

    • @robsands111
      @robsands111  6 років тому +1

      around 35k but that was lowering of the 1st floor ceilings too.

  • @benmorton3153
    @benmorton3153 6 років тому

    how long did it take?

  • @hocinetahir1236
    @hocinetahir1236 6 років тому

    H

    • @rashidkhan-bd2hh
      @rashidkhan-bd2hh 4 роки тому

      Hi i need same staff to work my loft conversion your staff very good and professional in video I am looking buider in Walsall

  • @leom2634
    @leom2634 7 років тому +1

    how many days ?

  • @mariaquill
    @mariaquill 7 років тому

    What type of window is this

  • @nadirmussa6896
    @nadirmussa6896 5 років тому

    How much do you charge for labour and materials approx

    • @bh-xm3gr
      @bh-xm3gr 5 років тому +1

      £35 thousand

  • @naureh5084
    @naureh5084 4 роки тому

    Thanks for sharing, great video. Would have loved to see the finished en-suite too.

    • @robsands111
      @robsands111  4 роки тому +2

      en-suite video ua-cam.com/video/tMVBaxD64Bw/v-deo.html

  • @criartoros
    @criartoros 5 років тому

    Did you apply for planning permission? Lol

    • @robsands111
      @robsands111  5 років тому

      Yes I did but I think since this project it now falls under permitted development

  • @idris35
    @idris35 6 років тому

    how much did you lower the ceiling by and how much head do you afterwards

    • @robsands111
      @robsands111  6 років тому

      I needed to lower by 12 inches throughout to get building regs approval, luckily I had the space on the first floor to do that. I still have about 2.5 metres

  • @cmal90
    @cmal90 7 років тому

    How long did this take start to finish ??

  • @m.a.9471
    @m.a.9471 7 років тому

    Sir.can I ask you . Where this project taken place and cost of the project? Please

    • @robsands111
      @robsands111  6 років тому

      Birmingham UK and around 35k with lowering the ceilings.

  • @mgabrielle2343
    @mgabrielle2343 6 років тому

    Nice video, but should have shown how the steels went in.

    • @robsands111
      @robsands111  6 років тому

      Unfortunately I couldn't film the wall plate steels going in from these cameras but the ridge steel goes in @1:30

  • @michaelj66087
    @michaelj66087 4 роки тому

    Hi, is it insulated under the rafters or just between?

    • @robsands111
      @robsands111  4 роки тому

      Its insulated all the way around

  • @George-o6u9m
    @George-o6u9m 7 років тому

    how much space do you need above the top of the steel to get your ridge tiles on.Do you fasten a piece of 4x2 to the top of beam(trying to work out best height for steel,so the ridge marries up with the neighbours,while trying to maximise headroom.Or do you go off original ridge board height.Any tips appreciated.Thanks

  • @FORDIE49
    @FORDIE49 7 років тому

    Hello
    Did you have to install steels into the floors or was it just a ridge beam and purling steel required?

    • @robsands111
      @robsands111  7 років тому

      There are 3 steels. One across the front wall plate, one across the rear wall plate and the third in the centre ridge at the top. all three span from the party wall to the outside wall.

    • @coops6621
      @coops6621 6 років тому

      Rob Sands are the steels cranes in to position or man handled?

  • @darrenl9422
    @darrenl9422 4 роки тому

    Hi I was wondering how much was the total cost of the Dormer conversion. Also was it hard to apply for like building regulations? Or planning permission?

    • @robsands111
      @robsands111  4 роки тому +3

      Hi. It was roughly £35k. At the time planning was fairly easy but that has recently changed in the uk and I believe its now permitted development so no longer requires planning permission. Building regs are still required and that is 1 phonecall, 1 payment of around £350 and as many inspections as you want at no extra charge.

  • @ivanolsen7966
    @ivanolsen7966 5 років тому

    perplexed ... why did you choose lighting that required holes in the styrene insulation ...one hole devoids it completely of it's function... insulation is NOT as simple as you thought

    • @robsands111
      @robsands111  5 років тому

      Unfortunately I had no choice as the ceiling height was restricted and didn’t want to keep smashing my head of hanging lights but we accounted for your comment and installed insulated hoods. But I do agree with your comment.