Fast VIA Rail and CN Trains on the Kingston Sub Before the Third Track
Вставка
- Опубліковано 20 лис 2022
- Date: June 26, 2011
Sit back and watch some fast freight trains as well as some super fast passenger trains flying down the Kingston Subdivision when there were only two main tracks. Roadbed, signals and other infrastructure upgrades are well underway for future track #3. Some of these VIA trains are really cookin' at up to 100mph! You will see a non rebuilt F40, a rebuilt F40, P42's, some stainless steel HEP coaches, LRC cars, even a couple of Renaissance sets! All of this VIA equipment is soon to be replaced with the New Fleet right around the corner.
Leave a comment below! Thanks for watching and please hit that subscribe button!!
Check me out on Instagram @lifeofatrainddriver - Авто та транспорт
Was wondering where the 3rd track went at first 😂. It’s such a different experience nowadays with the triple train meets every once in a while
Definitely changes the layout! It would be nice if there was more of it for sure.
Nice!! Wonder why one of the engineers was holding the paper up. Maybe didn't want his face on camera?
Thank you! 🙂 I hadn't noticed that until you pointed it out. Maybe that was the reason 🤣
Sweet video great share my friend 👍🏻🚂TSM
cool train view. that's a really long freight train. great
Thank you! 🙂 They run some longs at times for sure.
@@100m.p.h. 👍👍👍👍😎
nice mix
Thank you! 🙂
Was this lansdowne siding or was it the triple track from Belleville to Napanee?
This is the section from Cobourg to Grafton.
@@100m.p.h. Oh yeah. I forgot, they built the Lansdowne Siding in 2009
Love the vids, man. Could you do Go Transit Mp40 k5las? If you can't, no problem. I still enjoy a ton of train content on here.
Thank you! I dont think I have much video of the MP40's with K5LA. Did they come with them originally? I will see what I can find. Most of the spot I see the GO trains they don't blow the horn.
@life of a train driver Yeah, engines 600 through 626 had k5las back then, it sucks that there are certain areas they can blow the horn, It's Go Transit.
How come you have to put a 3rd track in? Should that been done all ready?
This was a project back in 2011. Been completed for about 12 years now I think.