Coffee Table Railroad - (Part 5)

Поділитися
Вставка
  • Опубліковано 27 сер 2024
  • All track switches are powered and operational, the switch control panel is installed (as shown), sections of track had to be replaced, the two tracks under the Pratt Truss bridge were just 'floating' so I put in culverts under each one. the length of the trellis bridge is doubled but still needs pediments. I made a billboard and color printed an old Coca-Cola ad (shrunk down to 1/160 of 40 feet wide), installed more DCC power connections to the track in 3 locations, and I bought a backhoe to put behind the train station. Two trains can run simultaneously on the layout, or one train can alternate from the inner route to the outer route or vice-versa. I put in two re-railers on the yard track for assembling trains and then the new switch puts the trains onto the mainline. Sometimes, its absolutely fascinating.

КОМЕНТАРІ • 1