  • Estimation of Reinforcement in Foundation & Column.
    Quantity for Stirrups in Column.
    ua-cam.com/users/edit?o=U&vide...
    In This channel you can learn about Civil Engineering Update Videos which are using generally in civil Engineering. So please subscribe our channel for daily Update Civil Engineering click on this link.
    You Tube : / @civilengineerss
    Visit out website : civilglobal.com/
    Face Book Page: / engrsamiullahstanikzai

КОМЕНТАРІ • 158

  • @santoshacharya2086
    @santoshacharya2086 4 роки тому +10

    10 min wrong calculations i. e. (3000-2*50)/200 +1 =15.5 ==16 nos of bar

  • @samad524able
    @samad524able 6 років тому +1

    Thank you very much Sir. i like the way you are teaching.

  • @jewelhossen91
    @jewelhossen91 6 років тому +6

    when you calculated 12mm xx & yy axix lenght may be it will ,L=3000-2*side covers+2*300-(2side*2*top &bottom*)
    so,L=3000-2*100+600-4*50
    L=3000-200+400
    L=3200
    L=3.2m
    tnx

  • @alihumayun1079
    @alihumayun1079 6 років тому

    Thanks alot v.helpfull video

  • @heronsio3025
    @heronsio3025 6 років тому +2

    Bend bar cover should be times to 4 because of top and bottom and two sides, also minimum concrete cover for footing on ground should be 75mm.

  • @jamalnasarlodin372
    @jamalnasarlodin372 5 років тому

    thanks for the beast teaching

  • @DesignReady.
    @DesignReady. 6 років тому +1

    Osm

  • @mansooramini8274
    @mansooramini8274 4 роки тому +1

    I usually follow your videos it is useful, but try to provide one video regarding design a project 3 or 4 storey house structure design Manually it very important point I need also .

  • @samadmaz912
    @samadmaz912 6 років тому +5

    please estimate a residential building (framed building)

  • @tauseefkhan8789
    @tauseefkhan8789 6 років тому

    Thanks sir..

  • @mohammadwalistanikzai3181
    @mohammadwalistanikzai3181 6 років тому

    Great dear very good Estimation

  • @navalmalpani7628
    @navalmalpani7628 6 років тому +2

    hello sami, you have not subtracted the hook lengths of 2D in the first steel calculation. aren't we supposed to subtract the lengths caused by extensions and bending?

  • @lisbonthomas6109
    @lisbonthomas6109 6 років тому

    thank you

  • @MithleshKumar-xg3tx
    @MithleshKumar-xg3tx 5 років тому

    Very nice sir

  • @AHMEDRAZA-nc2fy
    @AHMEDRAZA-nc2fy 6 років тому

    Thank you sir g

  • @rameshharavi1223
    @rameshharavi1223 4 роки тому +2

    Brother pls Upload Design of Steel

  • @abednigohallie9562
    @abednigohallie9562 Рік тому

    Nice one

  • @myqs4u511
    @myqs4u511 5 років тому

    5. Cutting Bar Length= (effective length + Both side Bends) - Bend angle Deduction

  • @emmanuelabayisenga7828
    @emmanuelabayisenga7828 2 роки тому

    I,m Emmanuel I,m civil engineering student ,If possible for next sessions you can teach us about indeterminate , determinate structure analysis and reading well building plans

  • @masameem1092
    @masameem1092 5 років тому

    Thank you sir

  • @superthink4087
    @superthink4087 4 роки тому

    Thanx alot

  • @nkundamaxyime4523
    @nkundamaxyime4523 6 років тому

    thank you for sharing my question is how do you relate the footing design to the earth pressure

  • @M.G.R...
    @M.G.R... 6 років тому

    Really awesomeeeeeeeeeeeeeeeeeeeeeeeeeerreeee

  • @VirendraKumar-xb6zx
    @VirendraKumar-xb6zx 4 роки тому

    Good teaching

  • @muhammadshahzadparacha3413
    @muhammadshahzadparacha3413 4 роки тому +1

    thanks for the video sir but if 50mm is concrete cover and multiply by 2 for top or bottom so is the one side i think it should be multiply by 4 to minus the both side top and bottom concrete cover

  • @suryacj9986
    @suryacj9986 6 років тому

    osm sir

  • @myqs4u511
    @myqs4u511 5 років тому

    6. Cutting bar length is 2900+400-48mm =3252mm (each bar cutting length is 3.25m)

  • @manjeets236
    @manjeets236 5 років тому

    Please make a full video of estimation and costing of a building.

  • @SalamKhan-hk7uv
    @SalamKhan-hk7uv 6 років тому

    Think you sir

  • @dilananantharajah846
    @dilananantharajah846 5 років тому

    Thank you

  • @manjeets236
    @manjeets236 6 років тому +1

    Hi sir, thanks for the videos. i want to ask that how can i find out the volume of bar. Thanks

  • @Gary-pogi
    @Gary-pogi 2 роки тому

    That is a very big footing!

  • @myqs4u511
    @myqs4u511 5 років тому

    4.Effective length = 3000-(2*50)=2900mm

  • @tauquirtarique3078
    @tauquirtarique3078 6 років тому

    Sir ,length of vertical bar
    Why you subtract cover at top 2 times. I don't understand what is the need of subtract side cover to get vertical length...
    Please answer

  • @myqs4u511
    @myqs4u511 5 років тому

    3. Even you didn't deduct 2 side bend angle. It should be deduct as follows if 90° angle we have to follow Biritish standard formula .It means 2d "d" mean dia. 2*12=24mm for one side, so two sides to be deduct 24×2=48mm

  • @chamarasp
    @chamarasp 6 років тому

    thank u for your lesson. can u please explain at the time of 6.26 why did u only multiply 50 by 2 instead of 4. thank u

  • @syedamankazi5136
    @syedamankazi5136 6 років тому

    plzz do fast , now m waiting 4 yr second vdo

  • @jyotikavya8149
    @jyotikavya8149 5 років тому

    make a more vedio and more detail about civil engineering

  • @superarchitect1013
    @superarchitect1013 6 років тому

    hlw Sir here I just want to know how to find out "Developement length of bar of a column into the footing"...??? plz reply must

  • @myqs4u511
    @myqs4u511 5 років тому

    8. Finally you have to add some % of wastage. 3% wastage is recommended for steel other common materials 5%.

  • @naveensomarapu1969
    @naveensomarapu1969 5 років тому

    Explain the steel , cement and sand needed for the residential bukiding

  • @vikeshsingh6592
    @vikeshsingh6592 6 років тому

    Sir I have doubt about slope in road construction if the height of road is 6m then what should be horizontal distance of ramp slope

  • @hadayaali4786
    @hadayaali4786 2 роки тому

    Nice

  • @shivamsinghal345
    @shivamsinghal345 4 роки тому

    Pls upload a video on BBS of two way slab.

  • @RakeshKushwaha-hu7ds
    @RakeshKushwaha-hu7ds 6 років тому

    and sir Civil drwing

  • @RakeshKushwaha-hu7ds
    @RakeshKushwaha-hu7ds 6 років тому

    sir building construction ka brick and ston masanory and timber ka lecture upload Kare plz sir

  • @vlogofgangaandgopal3178
    @vlogofgangaandgopal3178 6 років тому

    Sir I have used 12mm rods in columns in ground floor only but now I want to build 4 floors on ground floor , can I use some reinforcement in columns so that I can construct 4 floors on ground floor

  • @neelamtalum5990
    @neelamtalum5990 6 років тому

    Please make distinctly vision for viewer

  • @manzoornaqvi117
    @manzoornaqvi117 6 років тому

    A. O. A
    Brother frustam pera mid column ka steel estimate lagany ka tareeqe upload kary

  • @indiascricketfever6574
    @indiascricketfever6574 5 років тому

    Sir please how to read constructn drawing ki video bnaye layout ,column coordinates beam column sbki plz

  • @gudoimicheal8944
    @gudoimicheal8944 2 роки тому

    I was asking also taking off a building with footing

  • @sanjeevayadav4146
    @sanjeevayadav4146 6 років тому

    Gud mrng sir,To know me how to calculate steel in Apartments with exactly,Mats and columns ,please tell me sir.

  • @abhinashsenapati4778
    @abhinashsenapati4778 5 років тому

    Engineer if u have any raft foundation drawing detail plz upload

  • @MOHAMED-ADEN
    @MOHAMED-ADEN 6 років тому

    Am not sure to my understanding, L=3000-2covers + 2*(300-2covers)
    L = 3000-2*50 +2*(300-(2*50))
    = 3000-100 +2*(200)
    = 2900+400
    = 3300
    =3.3 M
    No of bars =( 3300/200)+1 =(16.5)+1
    =16 +1
    = 17#12-200c/c

  • @sunilkumar-nt9se
    @sunilkumar-nt9se 6 років тому

    Sir pls ..sho how to calculate quantity of steel for 2 steeped footing.

  • @nthngcns
    @nthngcns 3 роки тому

    Here's the simpliest way Lt= L+4(sidecover) = 3000+ 4(50) = 3200mm/3.2m

  • @somnathdewan4179
    @somnathdewan4179 5 років тому

    Duration 2nd step means vertical length of steel calculation have doubt

  • @satyavenipangi9966
    @satyavenipangi9966 Рік тому

    Sir can u explain as per diploma C20 sybullas quantity surveying 2 good explanation

  • @amitsain2697
    @amitsain2697 4 роки тому

    I think plz check footing length (300*2=600-(2*50 top and 2*50 bottom 200)=400+2900=3.3m length

  • @myqs4u511
    @myqs4u511 5 років тому

    2. So both side bend length to be 600-200=400mm

  • @AjaySahani-kt6zw
    @AjaySahani-kt6zw 5 років тому

    nice ex

  • @rahuldayanand888
    @rahuldayanand888 6 років тому

    can you please post a video of doing this estimation in excel.i mean complete estimation of a building using excel with the structtural drawing

  • @arpitkumar-wr5pm
    @arpitkumar-wr5pm 5 років тому

    length of main bar would be 3000-cover+9d ???

  • @bimanchandradas5205
    @bimanchandradas5205 5 років тому

    Is that vertical length calculation 5.0 m is right

  • @pwd.suman150
    @pwd.suman150 6 років тому +1

    Aur bhi estimate ki bare main bataye sir..

  • @myqs4u511
    @myqs4u511 5 років тому

    7. And you tall total 15 bars on x direction but it should be 16 bars. As follows (3000-(2*50))÷200= 14.5 ,so 15 bars + 1 bar = 16 bars.

  • @syedamankazi5136
    @syedamankazi5136 6 років тому

    bhai bbs aap ne footing ka jo kiya h , usme top or bottom kaise nikalenge wo btao na aap plzz

  • @awaislala6298
    @awaislala6298 6 років тому

    Plz sir explane thumb rule

  • @AMARNATHYADAV000
    @AMARNATHYADAV000 2 роки тому

    Sir how to calculate bbs of trepezoidal slope footing

  • @hamidmukhtar8949
    @hamidmukhtar8949 5 років тому

    Please Re-check 16mm bar length calculation

  • @krantiveergaramdal5254
    @krantiveergaramdal5254 5 років тому

    श्रीमान मुझे bbs पर डिटेल्ड वीडियो चाहिए,एकदम डिटेल,जिसमे सारी जानकारी हो।एक फ्रेशेर से लेकर एक एक्सपर्ट तक का नॉलेज हो plz

  • @maheshchauhan007
    @maheshchauhan007 6 років тому +2

    I think No. of bars is Incorrect..

  • @jerrytarpan6267
    @jerrytarpan6267 5 років тому

    Massonary footing ke video banalo Vai wo bhi aaj

  • @sameerswain6626
    @sameerswain6626 5 років тому

    How can I know how much of the diameter and how many times it takes to load so much

  • @antibioticss
    @antibioticss 5 років тому

    Dear 7500 psi pr kitny manzil building bana skty hn or grade 53 kitny psi ky barabar hota hy.

  • @jackquay4625
    @jackquay4625 6 років тому

    Thanks sir. The process is cool but the answers are wrong. Please check well your operation

  • @nagapandiravichandran5870
    @nagapandiravichandran5870 6 років тому +2

    dear sir
    length of column
    L=3000+700+300-50+300+300-100=4450
    say 4.45M
    plz reply sir

    • @hassaanaasim550
      @hassaanaasim550 6 років тому

      I also noted this big silly mistake by sir.

    • @aryanjoshi2230
      @aryanjoshi2230 6 років тому

      same anwser 4.45

    • @tauquirtarique3078
      @tauquirtarique3078 6 років тому

      Can anyone tell me about why sir subtract 2* side cover at top
      According to my opinion top cover of column is subtract not side cover... & it will 3000+700+300-50+300+300-50=4500

  • @syedamankazi5136
    @syedamankazi5136 6 років тому

    actually bbs m top or bottom bhi calculate krte h na to aap ne kha kiya h , sir

  • @98karthick
    @98karthick 6 років тому

    why are provideing bend rod or L rod in footing and column

  • @aatifawan781
    @aatifawan781 6 років тому

    hello sir how we calculate no of bricks in well

  • @jabedakhtarkhan6857
    @jabedakhtarkhan6857 6 років тому

    sir mujhe estimating bridges and culverts ke numerical problem me chaiye

  • @lutherstcroix9392
    @lutherstcroix9392 6 років тому

    First?

    • @CivilEngineerss
      @CivilEngineerss  6 років тому

      Thanks

    • @birrajbanssinghsingh5313
      @birrajbanssinghsingh5313 6 років тому

      Kindily explain the basic concept underlying in selecting different diameter for vertical bars here discussed as 16mm and base as 12mm .similarly as other experts in the example selected 12 mm verticae & !ask 8 mm. Kindily explain I have not been able to under stand.
      qmes03@gmail.com
      WWRegards

  • @debashishsarmah2502
    @debashishsarmah2502 4 роки тому +1

    How the length of the reinforcement of the vertical section is 5 meters?
    and, the number of bars in the footing is 16, not 15.
    I think these are some mistakes in the tutorial video. Thank you.

  • @chandankumar-ru6lz
    @chandankumar-ru6lz 6 років тому +5

    First over all length 3.4 is wrong

  • @engrmairaj1937
    @engrmairaj1937 6 років тому

    deer sir the number of bar is 16

  • @jeetbaramade8324
    @jeetbaramade8324 3 роки тому

    Column top cover minus NH kiya..and column cover 50 pakda hai..it will be 40....

  • @jothulanarayanaswamy6796
    @jothulanarayanaswamy6796 3 роки тому

    Inka clarity ga chepuu bro

  • @mlbbtournamentgamingnepal4810
    @mlbbtournamentgamingnepal4810 6 років тому

    estimate for culvert please

  • @sankarkalita5467
    @sankarkalita5467 4 роки тому

    Sir Where does 12 dia bars used in footing

  • @imthiyajahamed5537
    @imthiyajahamed5537 6 років тому

    example : L=(3000)-cover (2*50)+(2*300)-cover(2*50)-(2*50) two side of cover top and bottom =3.3 correct answer

    • @alihumayun1079
      @alihumayun1079 6 років тому

      Imthiyaj Ahamed u mean that top bottom cover should be subtracted two times because it is on both side of bending??

  • @cristianismovivo8861
    @cristianismovivo8861 6 років тому

    You asume the length of hooks iqual to h-2sides cover, this principle is not always fulfilled.The rest is ok congratulations.

  • @abhilashkasarapu3925
    @abhilashkasarapu3925 6 років тому

    What about stirup weight

  • @sameer-pf6pb
    @sameer-pf6pb 6 років тому

    If any distance of column is not givrn

  • @husnainjabbar6064
    @husnainjabbar6064 6 років тому

    there is something wrong with that lecture on stirrups. it does not show any video. plz check it.

  • @mohd.ibrahim737
    @mohd.ibrahim737 3 роки тому

    Pls mke in excel sir

  • @bingingwithcomicsnerd8069
    @bingingwithcomicsnerd8069 6 років тому

    where is the bending factor?

  • @amanullahyousofi3076
    @amanullahyousofi3076 6 років тому

    the general i cannot see the board

  • @abeldesa8600
    @abeldesa8600 5 років тому

    9c

  • @noorullah4547
    @noorullah4547 5 років тому

    engr sami,, khabra kom kindly da vertical dapra che ta kam length rabahar kar calculation di wrong kari 4450mm razi 4.45meter razi

    • @CivilEngineerss
      @CivilEngineerss  5 років тому +1

      Bro calculation problem na kai method zaror dy

    • @noorullah4547
      @noorullah4547 5 років тому

      @@CivilEngineerss bilkul right khbra da ho some Indians lagya we... Zaka

  • @rasalih9200
    @rasalih9200 2 роки тому

    your are now glowing up my friends