  • Complete track Renewal work by TRT machine is clearly explained in this video. It's very useful for permanent way engineering people.
    Priliminary work of complete track Renewal is described in below link.
    • #indianrailway Complet...
    For more videos:
    Various Types of Track gauges are explained by this video link. • #indianrailways #ldcea...
    Video link for 18 Zones and Divisions:
    • #indianrailway #zones ...
    Video link for EUR rail panel unloading:
    • EUR unloading of 10rai...
    Video link for specifications of liners:
    • #indianrailway #liners...
    Video link for BCM machine Working:
    • Working of Ballast cle...
    Video link for CSM machine work:
    • Working of CSM with Pr...
    Video link for Various Types of Track Machines:
    • #trackmachines Types o...

КОМЕНТАРІ • 24

  • @surajsuman1
    @surajsuman1 Рік тому +1

    1:00 Plough
    1:12 Sled
    1:32 removal of fish plate for connecting sled with the old rail.
    1:45 new rails tied with the fish plates
    1:52 8 sleepers removed for plough placement.
    2:32 New rail placed on rail handling unit.
    2:59 Connection of sled with the old rail, locking with sling chain.
    3:40 Fishplating of new rail, with last day's laid new rail.
    4:18 Placement of TRT machine wheel on crawler based sled. ( How this movement of machine is done? Complete machine is hauled by engine or machine moves back of its own? )
    4:37 Placement of dynamic plough on balast bed.
    4:55 Placement of new sleepers
    10:43 (Is this backward movement is happening during closure of work?)
    11:10 Mechanism for sleeper spacing, Indexing wheel( This should be explained before. Also, concept of indexing wheel can be explained.)
    11:24 removal of sled during closing of work. Locking arrangement.
    11:42 Lifting and taking out of plough
    11:57 Existing old rail to be connected with renewed new rail by fish plating.

  • @surajsuman1
    @surajsuman1 Рік тому

    This is one of the best explained video available on youtube on working of TRT. Many many thanks to the creator. You have done excellent work.

  • @hemantkarandikar2462
    @hemantkarandikar2462 Рік тому

    I am late to see your video, the information, shooting and explanation,in this is good good and good congrats,,

  • @neethut.k8409
    @neethut.k8409 2 роки тому

    Very useful Gokul sir, we hv TRT from next week onwards.thank u so much for such an informative vedio

  • @PankajKumar-wo6fx
    @PankajKumar-wo6fx 2 роки тому

    very useful man. thank you so much for this video.

  • @SuperArdnivar
    @SuperArdnivar Рік тому

    The most important activity one you have tied the old rail with sled at the time of starting work than how old rail is swung out

  • @appuilayaraja8157
    @appuilayaraja8157 3 роки тому +2

    Super sir

  • @venkatesanbilla857
    @venkatesanbilla857 2 роки тому

    Very useful sr

  • @manojchanda
    @manojchanda 3 роки тому +2

    Nice job sir

  • @lalanu5917
    @lalanu5917 Рік тому

    Bahut sunder

  • @vishnudattajackeRF
    @vishnudattajackeRF 3 роки тому +1

    Is this 130KMPH upgradation works sir ?

    • @Gokulrajpway
      @Gokulrajpway  3 роки тому +1

      No, Already this route is B route... CTR is done around 6kms.

    • @SarojYadav-hf3lc
      @SarojYadav-hf3lc 2 роки тому

      @@Gokulrajpway how much speed can this rail track support

  • @ashishsrivastava7329
    @ashishsrivastava7329 11 місяців тому

    This video is of which railway

  • @aryamehta007007
    @aryamehta007007 Рік тому

    Is this new rail 260 m in length? I also want to know about those new design sleepers are these good for supporting semi high speeds ?

    • @Gokulrajpway
      @Gokulrajpway  Рік тому

      Yes... This is 60kg 260m lenth rails.
      Now new sleepers are capable for 60Kg rails and also for 52kg rails.

    • @aryamehta007007
      @aryamehta007007 Рік тому

      @@Gokulrajpway I think this grade of tracks is well capable of speeds like 220-250 Kmph if in-cab signaling and fencing along tracks are achieved.

  • @SOLTORIK
    @SOLTORIK Рік тому

    keşke her yere demiryolu döşense.

  • @lalanu5917
    @lalanu5917 Рік тому

    Please hindi language

  • @SuperArdnivar
    @SuperArdnivar 2 роки тому

    Information provided is not covered as whole. One you tied sled with old before starting the work than how old rail slewing out unless sled untied with old rail. You didn't cover it in this video. You also haven't control the closing of the day work precisely. It's really poor PWI sahab

    • @surajsuman1
      @surajsuman1 Рік тому

      If possible can you please arrange to share those missing points.

  • @skvyuser123
    @skvyuser123 Місяць тому

    आपको हिंदी नहीं आती हिंदी बोलने में शर्म आतीहै