DESTRESSING of Rails in Railway Track

Поділитися
Вставка
  • Опубліковано 10 бер 2022
  • A simple and clear explanation of process of De-stressing of rails in Indian Railway‪@Gokulrajpway‬

КОМЕНТАРІ • 15

  • @saikirubham7820
    @saikirubham7820 2 роки тому

    Thank you it was informative!

  • @justinejose143
    @justinejose143 2 роки тому

    👏🏻👍🏻

  • @anandhliya5108
    @anandhliya5108 2 роки тому

    Thanks sir

  • @mukeshrs2510
    @mukeshrs2510 Рік тому

    Thank you sir.. From Kerala, Tvc

  • @kannanmaha2251
    @kannanmaha2251 2 роки тому

    40mm gap that's good

  • @dinesh3301
    @dinesh3301 2 роки тому

    Closure rail near the sej shall be cut and removed means,how many metre ?

    • @Gokulrajpway
      @Gokulrajpway  2 роки тому +1

      Length of closure rail is not mentioned in IRPWM, practically if there is any weak weld or scabbing rail near SEJ can be removed during the process. And ensure that weld can't be done within 4m.

    • @parvathyonair
      @parvathyonair Рік тому

      @@Gokulrajpway could you please make a detailed video on manual and using rail tensor including all the do's and don'ts and calculations, register/tms entries,etc..

  • @vikashthakur5863
    @vikashthakur5863 Рік тому

    Sir what are defects in lwr.hiw they are recorded and rectified.

    • @Gokulrajpway
      @Gokulrajpway  Рік тому +1

      Track defects may arise when deficiency of parameters occurred. The important track parameters are gauge, alignment (lateral and vertical), level (sag and summit). These are recorded by OMS( oscillation monitoring system), and TRC(Track recording car). The defects can be rectified by manually and using machines

  • @rajeshkumarlakshmanan5526
    @rajeshkumarlakshmanan5526 2 роки тому +2

    சார் தமிழ் யும் போடுங்கள் சார்

  • @kumars1426
    @kumars1426 2 роки тому

    Please explain in tamil also sir