Vibe and Matrix Floor Board Repair, Part 1

Поділитися
Вставка
  • Опубліковано 8 лис 2024

КОМЕНТАРІ • 6

  • @matthewbraun6517
    @matthewbraun6517 9 років тому

    Looking forward to the next video.
    Good luck!

  • @AHTRINIBOY
    @AHTRINIBOY 8 років тому +1

    WOW! That's brilliant!

  • @smms1276
    @smms1276 5 років тому

    👍 👍

  • @muwahh98
    @muwahh98 3 роки тому

    In Minnesota we can just do this in winter lol.

  • @hoooboy
    @hoooboy 9 років тому

    Thanks for sharing all your videos!! It's awesome! I'm curious to know if it have a way to have an access of the floor holes at 4:52 , without removing the carpet.

    • @lustderf
      @lustderf  9 років тому

      +hoooboy The only way to access those frame rail holes is by lifting the carpeting and removing the sound deadening material. Their are drain plugs in the bottom of the pocket, but once removed they need reinstalled from the top, requiring carpet and dampening material removal.