How To Properly Install A Washer Box (Plumbing How To)

Поділитися
Вставка
  • Опубліковано 19 лис 2024

КОМЕНТАРІ • 22

  • @Deep_Divers
    @Deep_Divers 11 місяців тому +9

    Good video! Quoting the codes and explaining the whys of the codes is very helpful.

  • @marinamile
    @marinamile 5 місяців тому +4

    Best video I've found on this topic. Just about to plumb mine. Thanks!!!

  • @222aint
    @222aint Рік тому +2

    how can you replace a leaking shutoff valve in that box without cutting a hole in the drywall underneath? Are there larger boxes with an access panel below the valves? Thank you for your excellent channel.

  • @micahjones1049
    @micahjones1049 8 місяців тому +4

    I like to drill Through my drain pipe to allow the copper water lines to pass too.

  • @ksparky388
    @ksparky388 6 місяців тому

    Thanks for the video. Quick question, the ends of the pvc trap are different. One end has a sharper bend than the other. Which end of the trap do you put the sandpipe? Thanks for your time

  • @jason8507
    @jason8507 Місяць тому

    So here’s my question. I want to add a second washing machine can I just put a Y on the standpipe?

  • @brianfaulhaber6785
    @brianfaulhaber6785 3 місяці тому

    There's usually a laundry tub next to the washing machine. Does that need to run separately?

  • @ArtbyZen
    @ArtbyZen 5 місяців тому

    Bottom plate touching the concrete supposed to be green treated. Do you think drywall crew is going to like how you did your stud guards?

  • @williamhealey6862
    @williamhealey6862 2 місяці тому

    Thanks, mine is overflowing and I needed those min/max figures

  • @omegaplumbing
    @omegaplumbing 9 місяців тому +4

    Listen you can’t fool me we know Omaha doesn’t even have in door plumbing yet….

  • @MrDarren5012
    @MrDarren5012 7 місяців тому +3

    You are using a homeowner washer box with no hammer arrestors and no stud guard at vent blocking ( support) everything else looks fine…

  • @gusty60
    @gusty60 Рік тому +3

    No cleanout?

    • @clyon23
      @clyon23 6 місяців тому +1

      In Omaha they only require clean outs at the bottom of the stack 30”-48” off floor

  • @john-l4n
    @john-l4n 3 місяці тому

    UPC code is slightly different. You should mention what code your state has adopted.

  • @BlueAlgon
    @BlueAlgon 4 місяці тому

    Well presented. Thx.

  • @donaldblank8873
    @donaldblank8873 11 місяців тому

    First of all the stud plate is not the floor, How high from the floor to what part of the sanitary T shall there be a minimum of 6 inches. Be specific please

    • @clyon23
      @clyon23 6 місяців тому

      Finished floor to waste inlet of the tee is 6-18”

  • @kevinwelsh7490
    @kevinwelsh7490 2 місяці тому

    I wish I lived in Omaha

  • @zakkissack1857
    @zakkissack1857 9 місяців тому +1

    So you’re in Omaha??? 🙄

  • @travlangley1
    @travlangley1 11 місяців тому +1

    Get a real washer box with hammer arrestors… this is what a handyman who doesn’t know any better would do… no way you’re a plumber, yet playing pretend

    • @jeffmummplumbing9321
      @jeffmummplumbing9321  11 місяців тому +11

      Hurr duh durrr duh durrr "no way you're a real plumber". Sir you probably live in north carolina and got your license by signing a paper at the courthouse. Here we go to school for years and have strict code. Thanks for your input!