In this video Thumb rules for labours in construction, labour productivity is explained. Approximate Labour ratio of various trades in building construction is also shown.
In this video we will give you various thumb rules, labour productivity per day (8hours). These are general thumb rules, actual figures may vary according to the local conditions of the place where work is carried out. Hope you found it helpful.
The first step to increase productivity in construction is to understand the thumb rules of labour productivity.
Labour productivity in construction refers to how fast a project can be built, and how much it costs to build. These are critical factors that influence the cost and duration of any particular construction project. In this video I have explained some of the thumb rules for labour productivity i.e Labour production ratio's for various trades in building construction.
For Thumb rules series previous videos Please click the link below
Thumb rules in construction
• Thumb Rules In Constru...
Thumb rules for concrete, steel, RCC Work • Thumb rules for Concre...
Thumb rules for shuttering works
• Thumb Rules For Shutte...
Please watch my other videos on my channel.
/ knowledgehubllt
Please watch, like & share my videos.
Don’t forget to subscribe my channel.
Please join our Facebook Group
/ 472006393930839
Also visit my Blog on
civilersedge.blogspot.com/
Follow me on:
/ mukundvvk
/ knowledgehubllt
Knowledgehubllt?s=08
t.me/KnowledgeHubllt
#civil
#civilengineering
#civilknowledge
#civilengineeringknowledge
#kh
#knowledgehubllt
#knowledgehublltcivil
#knowledgehubcivil
#khcivil
#khllt
#khlltcivil
Note- NOTE: ALL THE IMAGES/PICTURES SHOWN IN THE VIDEO BELONGS TO THE RESPECTED OWNERS AND NOT ME...
I AM NOT THE OWNER OF ANY PICTURES SHOWED IN THE VIDEO
---------------------------------------------------------------------------------------------------------
Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in the favor of fair use.
Very nice..... work oriented 🎉🎉🎉
Thank you
Informative👌👌
Well done
Amazed knowledge u have friend.God bless u for ur endless efforts.🙏🙌🙏🙌👍👍🌺🌹💐💐
Thanks
Great info
Thanks
Good.
In depth analysis on labor 👍👍👍👍👍 prodivity
Thanks
Nice information 👌👍
Thanks
Sir RCC work jese 4 lane flyover m scaffolding or steel Shuttering labour productivity including staging and steel bta dijiye please
This labour productivity is for building
Project palaning construction video
Thanks Sir for sharing your knowledge.
Kindly let me know this thumb rules are from your experience or you refer to some standard also you not mention for electrical and plumbing works productivity.
Thank you. Thumbrules I have mentioned are as per standard practice..I will post the video on Tumbrules for electrical & plumbing soon..
@@KnowledgeHubllt Thank you sir for your reply. I will be waiting for you videos on electrical and plumbing thumb rules
Ok sir
Please make video on Post tensioning slab
Ok
How only 1.25 sqm work of 4.5" brick work can be done ie only comes to 13.45 sft it's too less productivity to be checked again please reply
Ok
Sir im a new subscriber here..can you give me example Problem..using your thumb rule labor ratio..thanks😊
Ok sure
@@KnowledgeHubllt ill wait for it here sir
Sir, I have doubt. For 200thk AAC blockwork productivity is more (10sqm) than compared to 100-150thk AAC blockwork masony. Not able to understand its logic. Kindly clarify.
for 100-150 thk AAC blockwork, productivity is told as 8sqm
For 100 mm thick blockwork binders Or patali beams are required after every 1m height...
I observed that Bathroom flooring gives less productivity than room flooring, because of less work space, desired slope towards trap. 2) Painting work productivity taken very high..pls confirm...3) Waterproofing productivity taken very less..
Ok
Sir agar 1 ton steel cutting and binding karwana ho to kitna Mason and labour lagega ek din me
5 fitter and 5 helpers lagega
Sir , gulf construction labor productivity pls explain, their woman workers are not , pls rply
Ok, will check....
सरिया fitter एंड कारपेंटर एक दिन में कितना productvity होता है ।
Fitter कितना______ kg
कारपेंटर _____sqm
Already mentioned in video please watch full video
@@KnowledgeHubllt sariya fitter+Helper = 200kg.
Shuttering work- 5 sqm.
Low nhi he. Work productivity.
It is a standard labour productivity, which may change based on labour efficiency..
sir concrete ki labour productivity nahi di.
Ok will check
Sir , it is not do practically, I know I am civil field ,it is not possible for practically 😄
Source of your presentation??
Practical
@@KnowledgeHubllt ok.. But boss the fact is that no one in the market agrees to this information and contractor may incurr losses.
Moreover, cpwd recommendations are somewhat contrasting from your figures..
It depends upon efficiency of workers. It may change as per efficiency of workers. Like skilled , semiskilled.... It's as per practical experience for reference. Theoretically it may be different.
Sound quality not good
Ok