    This video i have explained about the how find out the cost and estimation of civil & structure building by thumb rule method over super built up & total built-up Area, and what in the per sqft cost of cement, steel, shuttering & concrete works.
    If you are want to know...
    How much per sqft cost of Cement in a civil & structure
    How much per sqft cost of Steel in a civil & structure
    How much per sqft cost of Concrete in a civil & structure
    What the per sqft cost of Form Work / Shuttering.
    FOR A RESIDENTIAL PROJECT
    WHAT IS THE WAY FORWARD FOR WORKING OF COST CALCULATION OVER SUPER BUILT-UP AREA VS. BASEMENT AREA.
    If You have any kind of Query, Please Comment.

КОМЕНТАРІ • 87

  • @SorabhporbalPorwal
    @SorabhporbalPorwal 5 років тому +4

    Apke Sare video bahut hi valuable h, I have 6 year experience. But your video help me for grow my carrier

  • @vivekjha4218
    @vivekjha4218 3 роки тому +1

    Steel 4.5 kg to 6 kg / sft wo bhi Built Up Area pe..... Na ki Super Built Up pe..... India ka top Developer ki baat kar rha hu.... Unke 4 project ka tender dala tha hamne

  • @Mixxeddtube
    @Mixxeddtube 5 років тому

    ua-cam.com/video/hkcCc8zA1Pk/v-deo.html
    In this video you have taken 5.28kg/sqft for super built up and for total built up it comes out to be 3.91 kg/sqft?
    Here in this video you are taking 7.5kg/sqft?
    Need clarification.
    Thanks.

  • @Truthofnakedeye
    @Truthofnakedeye Рік тому

    Appart from RCC. Reinforcent steel where your considering??

  • @sandeepgupta-gj8bv
    @sandeepgupta-gj8bv 4 роки тому +1

    Can u made video for petty contractor rates like per cum labour rate for concrete in different element, rate for tile fixing, kota stone in floor, staircase, moulding, shuttering, steel binding, lift charges with or without crane, etc. All areas of residential project to be covered and rates as per project rates.

  • @Psatyam1997
    @Psatyam1997 3 роки тому

    How to calculate amount of different dia.of bars by thumb rule.
    Jaise ki ek building me 10 ,12, 16 ,25 mm ka bar lga ho to usse thumb rule se kaise nikalenge kitna kon sa steel lgega@Factual civil engineer.

  • @musichome4276
    @musichome4276 4 роки тому +1

    Bhai steel 4 kg hota hai per sqft thumbs rule mein ap ny 7.5 kg likha hai plz Explain..?

  • @kiranshetty6620
    @kiranshetty6620 4 роки тому +1

    I guess You have mentioned Super Structure Area as Super Built UP Area.
    Total Builtup Area =Basement Area(Below Plinth)+ Super Structure Area (Above Plinth)
    Builtup, SuperBuiltup and Carpet Area is AS Follows
    Carpet Area: Area were you can Spread Flooring inside the Flat
    Builtup Area= CarpetArea+Wall Thickness (20-30% Area of Carpet Area)
    SuperBuiltup Area= Builtup Area+ Common Amenities Proportionate Share (I.e Common Area Share: Corridor, Lift Lobby Etc)
    Steel Coefficient Will Again Depends on Number of Floor

  • @sunilkumarrai9537
    @sunilkumarrai9537 3 місяці тому

    If possible make a complete video for every component, it will be helpful

  • @kumarpandit8179
    @kumarpandit8179 Рік тому

    Sir electrical and plumbing ka cost kya ayga??

  • @mehulchauhan258
    @mehulchauhan258 3 роки тому +1

    Can you please justify, how to cost calculate for external development work including hardscaping and softscaping work by thumb rule method? ( I have asked for a commercial purposes)

  • @shamstabrez1090
    @shamstabrez1090 2 роки тому

    Sir apne bola tha 1 lakh subscriber hojaye ga to QS p ek video series bnaunga

  • @ranjeetkumar-jk1uo
    @ranjeetkumar-jk1uo 3 роки тому +1

    Dear sir, please tell me, ye coefficient jo aapne bataye hai wo only structure ke liye hai ya with all finishing work.

  • @arshadgholam2799
    @arshadgholam2799 4 роки тому +1

    There is something wrong here. How come RCC and Shuttering mentioned in Kg per sft ??

  • @atifsam6592
    @atifsam6592 2 роки тому

    Are yaar kahan se engineering Padhe ho tum kuch bhi galat salat padha rhe ho are bhaiyyaaa area square feet me bata rhe ho rate rate and quantity square meter and bags me bata rhe ho

  • @souviksaha6408
    @souviksaha6408 5 років тому +1

    Aur ek video app sey reqst karunga, beam size, column size, footing size, beam k location, colmn k location yeh sab kaise thumb rule sey pata kare? Kyun har time to chota mota project k liye desigener log stadd or Etabs ka use nehi karte

  • @kumarpandit8179
    @kumarpandit8179 Рік тому

    Sir ye G+5 residential k lye applicable h?

  • @sumankoley6666
    @sumankoley6666 5 років тому +2

    Kindly give a microplanning excel sheet of building

  • @tejasshah7504
    @tejasshah7504 2 роки тому

    What will be kg/sq.ft steel requirement in steel structure for building Upto 4 floor, 4 to 8 floor, 8 to 12 floor, 13 and above(high rise)??? Pls can you help me on this... I'm doing a project on this topic.

  • @ashokgarg5702
    @ashokgarg5702 3 роки тому

    Hw u r taking RCC and shuttering in kg /sqft

  • @uniquehut7083
    @uniquehut7083 Рік тому

    Very helpful...is this co efficient changes as per building type......very happy if i get reply from you sir

  • @miteshparmar2015
    @miteshparmar2015 2 роки тому

    Narayan Bless 🙏 You

  • @AshishSharma-xt7fo
    @AshishSharma-xt7fo 5 років тому +2

    Sir RCC works or shuttering k description mai Kg wala scene kch smjh ni aaya

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому +1

      Abhi ye pahli video thi jisme basic bataya h, aane wale video main aur ache se explain karunga

  • @arsadmoola7271
    @arsadmoola7271 2 роки тому

    Please make more video related to estimation and costing...
    Thanks❤️❤️❤️

  • @harishnaik1543
    @harishnaik1543 3 роки тому

    Kindly make video on how to prepare preliminery budget for high rise residential project with co- efficient or thumb rule

  • @ravinkumar9406
    @ravinkumar9406 3 роки тому

    Sir, Please how to Form work of Beam, Column & Slab Rate Analysis

  • @ankushnowal
    @ankushnowal 4 роки тому

    Sir ye sheet mil jaegi? Would be really helpful. Ya apki website se.
    Also pls isme finishing bhi per sqft cost batao plus landscaping wagaah me kitna per sqft cost aa jata hai.
    Thank you

  • @souviksaha6408
    @souviksaha6408 5 років тому

    Sir app pls various thumb rule ke liye 1 video banay jo construction site mey use hota hai, like development length, lap length, slump, spacing of ties, stirrups, distribution bar iss sabkey bare mey. IS code mey jo diya o to accurately har time site mey nehi use hota isilye app sey yeh reqst hai

  • @mohammadmajeeduddin3545
    @mohammadmajeeduddin3545 5 років тому +2

    Sir what is the cost of finishing work of building like plaster, brickwork / block work, plumbing, electrical etc and other work
    Please guide us about it.

  • @ar.avadheshsingh2616
    @ar.avadheshsingh2616 5 років тому +1

    please upload MS Excel sheet

  • @shivendrashahi3477
    @shivendrashahi3477 4 роки тому

    Bhai tumne basement ke coefficient ko super builtup area me dikha diya h

  • @nrengineer
    @nrengineer 5 років тому +1

    Reinforcement 90kg per cubic of concrete , sahi h Kya ya or Kuch h ... Bataey

  • @parvjain5268
    @parvjain5268 4 роки тому

    I request you to upload finishing work coefficient in residential building ?
    Alternatively you can also tell me where I can find that..

  • @manojfarkunde7312
    @manojfarkunde7312 2 роки тому

    Full budget mep , fire fighting, landscaping

  • @anoopyadav1555
    @anoopyadav1555 4 роки тому

    Dear,kindly attach all excels, drawings,explained in each vedio.it would be great help

  • @vidyasagarmoogi3379
    @vidyasagarmoogi3379 3 роки тому

    Sir wat Labour Cost is it included in that Coefficient

  • @arshadgholam2799
    @arshadgholam2799 4 роки тому +1

    You have cleverly avoided sqft and sqmt or cft and cumt part as far as shuttering and RCC goes and created confusion. You have mentioned coefficients for RCC in sft and Shuttering in sft then from where sqmt and cum came?

  • @vinaysinghthakur3898
    @vinaysinghthakur3898 5 років тому +1

    Plz tender process explain kro sir

  • @structuraldrawingsforfresh9437
    @structuraldrawingsforfresh9437 4 роки тому

    Mep and tiles doors paints steel window doors v add hona chahhiye

  • @rohitangane507
    @rohitangane507 4 роки тому

    Why cement and rcc seprat if u build only rcc sheep

  • @thesabyasachi8524
    @thesabyasachi8524 4 роки тому

    I am really helpfull by your lessons.Thank you very much sir..
    Your depth of teaching is really appreciable.

  • @rahulbhatt5107
    @rahulbhatt5107 5 років тому

    Please also make a video on difference between costing of residential and commercial project construction..

  • @wasimbagwan7481
    @wasimbagwan7481 2 роки тому

    Sir pls share excel sheet for better understanding

  • @anupsharma4200
    @anupsharma4200 5 років тому

    Apke channel bahut acha h, kyu hame pata chalta ki is type ki working bhi hoti h, big fan your sir

  • @SunilPatel-nk3pg
    @SunilPatel-nk3pg 5 років тому +1

    Nice video sir

  • @khanna5433
    @khanna5433 4 роки тому

    coefficent for shuttering is on 0.3 kq/sft, but rate is 450/sqmt , please explain this

    • @mananjain2473
      @mananjain2473 3 роки тому

      This rate includes material, Labour

  • @adeebkamil8203
    @adeebkamil8203 4 роки тому

    Please tell me thumb rules book and author name

  • @Rajofficial-d7x
    @Rajofficial-d7x 5 років тому

    Sir staircase ki shuttering k upar video banae, aap bahut ache se samjha sakte ho staircase k concept ko

  • @sandeepgupta-gj8bv
    @sandeepgupta-gj8bv 5 років тому

    Please make video on expansion joint and rate along wid different option.

  • @nitinsharma228
    @nitinsharma228 5 років тому

    Sir provide this pdf please sir

  • @anupsharma4200
    @anupsharma4200 5 років тому

    Bahut sahi sir, saare coefficient bataye, thx sir

  • @pallabdutta4273
    @pallabdutta4273 3 роки тому

    Can you share the XL sheet

  • @parveenaggarwal4802
    @parveenaggarwal4802 4 роки тому

    Labour kha gai

  • @rafeeqsheriff5658
    @rafeeqsheriff5658 4 роки тому

    Sir nice video but in description of rcc work u put sqft but in units u put sqm I'm confused in that can u plsss explain clearly rest of it very useful

  • @anupsharma4200
    @anupsharma4200 5 років тому

    Dhanyawad aap ne channel banaya, jispe aap costing batate ho

  • @shouvikbanerjee2178
    @shouvikbanerjee2178 5 років тому

    Please attach the spreadsheet

  • @MoinKhan-yf8bs
    @MoinKhan-yf8bs 5 років тому

    Sir productivity ki koi PDF h

  • @vijaysharma-je7hy
    @vijaysharma-je7hy 2 роки тому

    Good info.....

  • @Dasariprashanth
    @Dasariprashanth 2 роки тому

    excellent

  • @rameshkumar-ph4rz
    @rameshkumar-ph4rz 5 років тому

    Thanks sir

  • @biting.scorpio
    @biting.scorpio 5 років тому

    Can we have this excel file?

  • @civilsitevisitandengineeri3434
    @civilsitevisitandengineeri3434 5 років тому

    Koi ar video dalo sir