When should I do Electrical with Spray Foam Insulation on Metal Buildings? | WolfSteel Buildings

Поділитися
Вставка
  • Опубліковано 29 сер 2024

КОМЕНТАРІ • 5

  • @1246pop
    @1246pop 2 місяці тому +6

    Trust me on this, spray foam everything, do it once do it right, then put up ply board on walls. Paint over with fire retardant paint, and run waterproof conduit on walls, keep away from the floor. When your electrical contractor or if its yourself, run ample 220 volt, 120volt, sockets, along with at least 50 amp service for welding equipment even if you do not have a welder. You will be shocked as to what future needs could be. The fire retardant paint is an absolute must if any equipment gets too hot or you have a small fire, it can save your life and your family, and possibly your house, antique car, tractor, snow mobile, truck, you get it.
    I am hoping that this post helps at least one person.

    • @wolfsteelbuildings
      @wolfsteelbuildings  2 місяці тому

      GREAT FEEDBACK! Thanks for the comment
      We couldnt agree more with the comment: You will be shocked as to what future needs could be.

  • @bradjenkins932
    @bradjenkins932 22 дні тому +1

    Do you prime the galvanized steel first?

    • @wolfsteelbuildings
      @wolfsteelbuildings  13 днів тому

      The tubular buildings are not primed. They have the galvanized coating on them

    • @bradjenkins932
      @bradjenkins932 13 днів тому +1

      @@wolfsteelbuildings Galvanize has to be primed before spray foam.