Discovery Head Quarters, Sandton, South Africa - Construction Timelapse for Growthpoint & Zenprop

Поділитися
Вставка
  • Опубліковано 29 сер 2024
  • Our pioneer longterm construction timelapse project is done! The long-awaited Discovery Head Quarter in Sandton is finally completed and so is the video. With three cameras running since April 2014, Timelapse SA has been capturing the progress of this project everyday until March 2018.
    With over 16 TB of data, more than 650 000 still images captured, producing around 9 hours of footage, this surely was a production of epic proportions!
    The new Discovery head office in Sandton is one of the most iconic buildings in Sandton today and has received a 5-star Green Star rating from the Green Building Council of South Africa. One Discovery Place was developed in joint venture by Growthpoint Properties and Zenprop Holdings and is one of the largest and greenest office buildings in Africa.
    With various awards form the South African Property Owners Association (SAPOA), among others in 2019 such as top honours in the Interiors and Office Developments for the Corporate category, it was also named the Overall Winner.
    History in the making, like never seen before.
    What a monumental task!
    Some interesting stats on the development:
    Demolitions started in February 2014
    Excavated soil and rock - 100,000 m3 = 12,000 swimming pools = 100,000 truck trips
    Excavation depth 36m, which holds 200,000m2 of parking = 20 rugby fields
    12,700 ton of reinforcing steel = 22 A380 Airbuses
    20,000 concrete truck deliveries
    7 tower cranes on site
    Gross building area - Approximately 320 000m²
    Office GLA area - 116 594m²
    Façade area - 29 000m²
    Atrium roof area - 2700m²
    Atrium and concourse balustrades - 3 495 m
    Total volume of earthworks - 569 000 m3
    Total area of Lateral support walls - 15 392 m2
    Total volume of concrete - 132 000 m3
    Total tonnage of reinforced steel - 14 178t
    Lifts - 35x
    Escalators - 20x
    Parking - Nine stories underground basement
    Roof recreational areas ,including a 6-a-side soccer court and multi sports court 6700m²
    CREDITS:
    Produced by: The Construction Timelapse Company
    Directed by: Joe Louw / Jonelle Louw
    DP: Joe Louw
    Offline editing & grading: Jonelle Louw / Jennifer Pillinger
    Online editing & Graphics: Nanette Dreyer - Handmade Media
    For more information on our services, and to see other completed projects, visit
    www.constructi...

КОМЕНТАРІ • 7

  • @SJR_Media_Group
    @SJR_Media_Group 10 місяців тому +5

    What a gorgeous building. The parking garage is bigger than many commercial buildings. Most people have no clue how much work is done before a building comes up out of the ground.

  • @yassirrasheed2296
    @yassirrasheed2296 Рік тому +3

    Miraculous

  • @zusibone
    @zusibone 8 місяців тому +1

    South Africa, Johannesburg, Sandton

  • @whoosh1425
    @whoosh1425 Рік тому +2

    nice

  • @BhekumuziMkhonto-pd5id
    @BhekumuziMkhonto-pd5id 4 місяці тому

    Can I have a full Video of a Hotel with such Looks and how much would it cost me without the expertise a Professional

  • @user-bl2vf3rp5g
    @user-bl2vf3rp5g Рік тому +2

    сТроЙкА

  • @idkidk8278
    @idkidk8278 7 місяців тому

    Not the same Discovery as Discovery media...