  • New station at Cambridge South - Project case study
    PWI Thames Valley Section meeting (Hybrid)
    5 June 2024

КОМЕНТАРІ • 4

  • @ianhenderson4560

    Fantastic presentation.

  • @andrewreynolds4949
    @andrewreynolds4949 28 днів тому

    Secondary egress paths from the platforms are a noticeable feature of new stations elsewhere in the world, such as the Brightline system in Florida

  • @matthewjohnbornholt648

    No discussion of the 185 million cost which is at least 3-5 times the cost of comparable European or East Asian stations. Typical.