The Watercress Line "Service 2" - 27/7/18

Поділитися
Вставка
  • Опубліковано 26 лип 2018
  • My first visit to the MHR in quite a while saw the Ivatt 2MT tank 41312 and BR Std 9F 92212 in service, operating the Standard Service 2 timetable. In this short video, the pair of engines can be seen working over the line on a - mercifully - overcast and slightly cooler day.
    All footage filmed on Friday 27th July 2018.
    Flickr: flickr.com/VehicularBrit
    Facebook: VehicularBrit
    Twitter: VehicularBrit
  • Авто та транспорт

КОМЕНТАРІ • 11

  • @TailLampProductions
    @TailLampProductions 6 років тому +1

    Great video!

  • @benjenden4997
    @benjenden4997 6 років тому

    As ever, a very brilliantly filmed and put together video.

  • @joelightrailway2362
    @joelightrailway2362 6 років тому

    Excellent video mate 😉

  • @howarth004
    @howarth004 6 років тому

    Nice footage , a great Railway

  • @Palkia792
    @Palkia792 6 років тому

    I visited on 24th when Cheltenhan was running. fine looking loco. running with 41312 due to 45379 being out of service. I got to go into the Sheds to visit 45379

  • @kineticrail
    @kineticrail 6 років тому

    Great video as ever mate. Enjoyed watching. Im surprised the watercress didnt go with a steam ban along with alot of other line given the gradients and how hard the locos are working.

    • @VehicularBrit
      @VehicularBrit  6 років тому

      Thanks man. I don't know what their strategy is to keep lineside fires to a minimum, but it seems to work.