With the price of pipe/elbows/hoses these day, it’s definitely cha-ching…. just perhaps not necessarily in a direction which favours our bottom line 😂😂😂
Good times 🎉 Boom pumping 💪, nose to nose 39 meter putzmeister action Love the sound of boom pipe slapping 👌 Thanks for the technical knowledge knowhow ❤ Gotta love a pump nerd 😂
ive noticed, both your 39 and 56 have double oil coolers. is that something putz does factory for the 13 and 18 cell kits? none of the 16 cell pumps the company I work for run have double coolers.
That’s a really good question. I always just assumed it was due to the larger hydraulic pumps and increased flow of the 13HPD and 18HLS kits. I’m going to see if I can’t get a more definite answer on this one.
Hey Scott what's up man I hope everything's going well up there for everybody yeah on your you ask the question about those hose clamps the pan and the other one for that you have their I think the pan depending on what you're doing is easy easier you know but because it has a hooks the handles on it the other one that you have their from the the company those are good because they don't look like they don't look on anything you can drag them anywhere so it depends on what your situation is
Hey buddy! I’ve found it really depends on the size and spacing of the rebar which we are pulling the hose over top of. For the majority of situations, the concrete placers seem to prefer the hose-eggs, but there definitely are some instances where the hose-pans work a little better.
@@canadianconcretepumper1979 Side note.. 42m Liebhrer does have a smaller footprint..... and you can do funkier setups with their outrigger capabilities.... 43sx with whatever punp kit is a volume production machine and some how has low ceiling height .....i dont sell them and dont makd a dollar but its a great machine... rear telescoping outriggers would always a preferred choice
In just the past few weeks we’ve had to re-pipe 3 full boom kits. It’s definitely the sound of $$$. The question becomes, in which direction exactly is the $$$ flowing??? 😂😂😂
It would be well above my concrete pump operator pay grade to speculate how much bar is/is not sufficient. I just do my best to make the concrete go into one end of the pump, and reappear out the other. 😁😁😁
YOU GOT A COUPLE OF THE BIG BOYS OUT THERE TODAY, GOD I MISS POURING MUD AND FORMING IT UP , I DON'T MISS STRIPPING FORMS THOUGH, THAT WAS NOT THE BEST THING I EVER DID
It’s pretty common in our market for the forming contractors just to sub-contract out the stripping of forms to a crew which specializes in doing so. Stripping forms all day, every single day… what a gig!!!
Love the slapping of the pipes and the Kriss cross boom good job as always ❤❤❤❤
Appreciate that James!
That sound! It’s the sound of money! Cha-Ching !👍🇨🇦
With the price of pipe/elbows/hoses these day, it’s definitely cha-ching…. just perhaps not necessarily in a direction which favours our bottom line 😂😂😂
Good times 🎉 Boom pumping 💪, nose to nose 39 meter putzmeister action
Love the sound of boom pipe slapping 👌
Thanks for the technical knowledge knowhow ❤
Gotta love a pump nerd 😂
“Pump-nerd” ???? How dare you Mark!!!
lol!!! I will gladly own the title of “Ginormous Pump-Nerd” 😁😁😁
@@canadianconcretepumper1979 Quite possibly the most interesting "ginormous pump 🤓 nerd" on UA-cam 😀🤓🤙🏻
Music to my ears!
Excellent, well done!
Thanks guys. Appreciate that! 👊🏻👊🏻👊🏻
When the concrete here and it’s gotta be pumped Who ya gonna call. A Js pumping.
I feel like this could the chorus to our first hit single!!!!
ive noticed, both your 39 and 56 have double oil coolers. is that something putz does factory for the 13 and 18 cell kits? none of the 16 cell pumps the company I work for run have double coolers.
That’s a really good question. I always just assumed it was due to the larger hydraulic pumps and increased flow of the 13HPD and 18HLS kits. I’m going to see if I can’t get a more definite answer on this one.
Big video building Machines Loading
Damn the water pipe over the water box is pretty awesome
If you want to see a kick-ass water-box full setup, checkout our Liebherr vids we shot a few weeks ago.
that's the sound I love to her in the morning when ther is no concrete to pump work is not fun
Hey Scott what's up man I hope everything's going well up there for everybody yeah on your you ask the question about those hose clamps the pan and the other one for that you have their I think the pan depending on what you're doing is easy easier you know but because it has a hooks the handles on it the other one that you have their from the the company those are good because they don't look like they don't look on anything you can drag them anywhere so it depends on what your situation is
Hey buddy! I’ve found it really depends on the size and spacing of the rebar which we are pulling the hose over top of. For the majority of situations, the concrete placers seem to prefer the hose-eggs, but there definitely are some instances where the hose-pans work a little better.
I use a 4-3.5 reducer too...
Pumping all the way also from 🇵🇭 Mack's a good pump truck, but it has mobility issues, it cannot go on tight corners
Our bigger Mack trucks with the steerable rear axles do pretty well, but are quite cumbersome I believe to many of the available options overseas.
pans ovet eggs every day except when line dragons are in play....
43sx is a place anywhere pump, my opinion
I’ve heard nothing but great things about those 43SX Schwing from guys who’ve run them.
@@canadianconcretepumper1979
Side note.. 42m Liebhrer does have a smaller footprint..... and you can do funkier setups with their outrigger capabilities....
43sx with whatever punp kit is a volume production machine and some how has low ceiling height .....i dont sell them and dont makd a dollar but its a great machine...
rear telescoping outriggers would always a preferred choice
Pipe slap = $$$
In just the past few weeks we’ve had to re-pipe 3 full boom kits. It’s definitely the sound of $$$. The question becomes, in which direction exactly is the $$$ flowing??? 😂😂😂
500 meter mit 2 Pumpen?
Yes. Saved us roughly 4-5 hours of pour time here.
Lotsa bar doing lotsa nothing @5:10.....
It would be well above my concrete pump operator pay grade to speculate how much bar is/is not sufficient. I just do my best to make the concrete go into one end of the pump, and reappear out the other. 😁😁😁
@@canadianconcretepumper1979 Fair enough 😂
YOU GOT A COUPLE OF THE BIG BOYS OUT THERE TODAY, GOD I MISS POURING MUD AND FORMING IT UP , I DON'T MISS STRIPPING FORMS THOUGH, THAT WAS NOT THE BEST THING I EVER DID
It’s pretty common in our market for the forming contractors just to sub-contract out the stripping of forms to a crew which specializes in doing so. Stripping forms all day, every single day… what a gig!!!
I am pump oprator putzmeister i want work permit canada plz give me your contact number i am Pakistani i work saudia Arabi 10 year experience 😮😊