Porthmadog Signalbox - 5 hours in 6 minutes

Поділитися
Вставка
  • Опубліковано 19 жов 2024
  • Video time-lapse recorded with Yi 4k action cam at 1 frame per half second (with quiet moments edited out). Porthmadog Harbour Station, Ffestiniog & Welsh Highland Railways. Recorded at 4k and cropped to 1080p.
    Music:
    Fig Leaf Times Two Kevin MacLeod (incompetech.com)
    Licensed under Creative Commons: By Attribution 3.0 License
    creativecommons...

КОМЕНТАРІ • 3

  • @adamwilliams725
    @adamwilliams725 8 років тому

    is the LC TMOB or MCB-CCTV?

    • @autisticadventuressteam83
      @autisticadventuressteam83  8 років тому +2

      Neither - open crossing, no barriers (it is too large and has two road junctions within). Crossing is initiated by turning the single line token in a key switch either end, usually done by the loco driver, and is cancelled by a button on the lever frame in the signal box with CCTV monitored by the signalman as you can see. Not only is it a long crossing but it is on a tidal bridge. The railway crossed here many years ago, taking an even longer route and carrying on to occupy another road for a distance on the original route, which ceased use in the 1940s. The modern route opened late 2010 and has a deviated route to minimise road occupation but still draws spectators 6 years on, whom are free to wander within the crossing as it's also sort of a tramway - just another unique feature of our line - we also have a unique flat crossing with the Network Rail Cambrian line in Porthmadog which I also operate but locally (the flat crossing may become remotely operated from the signalbox one day).

  • @denysowen1681
    @denysowen1681 8 років тому +1

    Perhaps a little TOO fast!!