NANT GWERNOL Blockpost
Вставка
- Опубліковано 15 жов 2024
- Tallyllyn Railway - Nant Gwernol Blockpost
Nant Gwernol station was built and opened as part of the Talyllyn Railway’s “extension” works to reach the original end of the line where the railway met the quarry railway system at the foot of the lowest of the quarry inclines. Passenger traffic never normally ran to this point there being only sidings here. In 1976 the railway extended its line along the track bed from Abergynolwyn to reach Nany Gwernol and a station with platform , station office and Blockpost were also built at the same time. All trains terminate here and the locomotive runs round the train before heading back to Abergynolwyn. The simple 3 lever ground frame at this location originally came from the Derwent Valley Railway. The Blockpost which is rarely used contains all the same equipment as elsewhere along the line to allow trains to be fully signalled between here and Abergynolwyn.
I've had a couple of days doing Nant Gwernol over the last few years. It's quite enjoyable to do, although you really need to do it on a pink timetable or gala day for it to be a worthwhile day!
Il have to check out a gala day 😁. Thankyou
Nant was staffed last Thursday for the Children's Day event .. did you catch it?
@@filmclipuk unfortunately not, I was there filming several months back now, hope the event went well 🫡