4/30/2024 GRANVILLE BRIDGE CONNECTOR Construction Zone at the Downtown Loops, Vancouver, BC

Поділитися
Вставка
  • Опубліковано 27 жов 2024

КОМЕНТАРІ • 4

  • @kephalopod3054
    @kephalopod3054 5 місяців тому +1

    Speechless.

  • @edwinstar100
    @edwinstar100 6 місяців тому

    I wish they had turned the north end into park, and put half the pedestrians through the super-structure below. Over-all pretty good, less noise I hope.

  • @Cartoondude135
    @Cartoondude135 5 місяців тому

    I didn't read anything about them going to demolish the bridge.

    • @jaygray7102
      @jaygray7102 3 місяці тому

      They've been reporting on this project for quite some time. I was a little stunned to hear the Georgia St. viaduct was going to be removed, I grew up with it being there. I don't live in the city anymore, but there's construction and rebuilding EVERYWHERE...take a drive out to the Fraser Valley, now they're talking about letting Sumas Lake return....better decide before that stretch of the #1 gets redone. It'll be interesting to see how it all ends up.