Pile Capacity, c/c Spacing & Factor of Safety considerations of Bored Cast In-situ Concrete Piles

Поділитися
Вставка
  • Опубліковано 8 вер 2024
  • This Lecture 83 in series of my UA-cam Channel “Geotechnical Engineering Consultancy Tips” explains about the Vertical, Uplift, Axial, Lateral Capacity, centre-to-centre (c/c) Spacing and Factor of Safety considerations of Bored Cast In-situ Concrete Piles as per IS 2911 (Part 1/Sec 2): 2010 Code of Practice for Design and Construction of Pile Foundations PART 1 Concrete Piles Section 2 Bored Cast in-situ Concrete Piles (Second Revision)
    #geotechnicalengineeringconsultancytips #anuragkapoor #IS2911(Part1/Sec2):2010 #pilefoundationdesign #codeofpracticefordesignandconstructionofpilefoundations #IS2911Part1Section2(2010) #pilefoundationdesignasperIS2911Part1Section2(2010) #pilefoundationdesignasperIScode #minimumspacingbetweenboredpiles #IS2911 #factorofsafetyforpilefoundation #vertical/uplift/axialandlateralcapacityofpile

КОМЕНТАРІ • 3