DMA _ kR COBALT CLOSED ENG

Поділитися
Вставка
  • Опубліковано 23 вер 2024
  • Remote Frozen Product Cabinet KR COBALT CLOSED
    INSTALLATION GUIDE
    1. Reception and unpacking
    1.1 Checking the order
    1.2 Equipment Handling
    1.3 Check Ground Levelling
    1.4 Unit Identification
    1.5 Installation Tools
    1.6 Packaging support desassembly
    1.7 Feet adjustment
    1.8 Unpacking
    2. Levelling and joining units
    2.1 Levelling
    2.2 Joining Units
    2.3 Door Closing Check
    2.4 Base Assembly
    2.5 Protective coating removal

КОМЕНТАРІ •