DMA _ kR COBALT CLOSED ENG
Вставка
- Опубліковано 23 вер 2024
- Remote Frozen Product Cabinet KR COBALT CLOSED
INSTALLATION GUIDE
1. Reception and unpacking
1.1 Checking the order
1.2 Equipment Handling
1.3 Check Ground Levelling
1.4 Unit Identification
1.5 Installation Tools
1.6 Packaging support desassembly
1.7 Feet adjustment
1.8 Unpacking
2. Levelling and joining units
2.1 Levelling
2.2 Joining Units
2.3 Door Closing Check
2.4 Base Assembly
2.5 Protective coating removal