"Shipping Full On" Tesla Gigafactory Texas 10/10/2024. 9:37AM

Поділитися
Вставка
  • Опубліковано 22 жов 2024

КОМЕНТАРІ • 38

  • @BTSflyer
    @BTSflyer  13 днів тому +2

    The shipping lot very busy today with many car carriers loading up and moving out. South Extension still busy and work on the cooling towers continues. Plenty of casing stack outside on the NE side of the Gigafactory.
    Please Like and Subscribe to this channel. Click the bell for notifications.
    Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4

  • @rayc.8555
    @rayc.8555 13 днів тому +9

    The Forza sipping company specializes in shipping to Mexico,

  • @DessieDoolan
    @DessieDoolan 12 днів тому +7

    Thanks Brad.
    *Sort by Newest First or Top Comments if only the first few lines are visible*
    0:22. River Road, intersection. Left. From this angle the ‘fork’ sculpture not particularly noticeable in amongst the power-poles and light-posts.
    1:24. Cyber Circle, easement. Pipeline works. Trench boxes in the excavation around the uncovered existing NG pipeline dogleg.
    1:54. Southend, east. Tank farm, Level 2. Right. Insulated pipework around the valve assembly. Some one working behind the blue screen.
    2:42. Southend, east. Level 1. Left. Steel framework for a large door opening.
    2:59. Southend, south. Centre Fire Escape Passage. Adding fill for the landing and ramp.
    3:51. Southend, west. Ready for glazing. Black glazing channels installed, Level 2 perimeter floor beam clad in sheet-metal.
    5:39. Westside, storage. Magnetron transformers. Doors open, someone at work.
    5:52. Westside, storage. Left. 50 or more of the silver wrapped crates.
    6:27. Westside, triangular storage yard. 63 Prolec transformers on the ground, 2 on the trailers?
    7:20. Westside, Sand Hill Lateral Extension Pipeline project. Long southward drilling under the river seems to be giving them grief compared to the shorter runs under the highway, and to the north at 8:42 where the pipe has been pulled through the bore.
    14:13. New switchyard/substation. Centre. Stripping the formwork from a circuit breaker footing.
    14:26. New switchyard/substation. Centre. Stack of framework. Similar section (square) to the busbar frames either side of the existing transformers.
    15:15. Casting, east. Right. Canopy overhang being lined on the underside.

    • @memrjohnno
      @memrjohnno 12 днів тому +1

      ' 63 Prolec transformers on the ground, 2 on the trailers?' Indeed but why would they need two trailers unless they are going to different locations?

    • @DessieDoolan
      @DessieDoolan 12 днів тому +3

      @@memrjohnno Additional I think. Only 57 there last time I counted, although they are hard to count.

    • @memrjohnno
      @memrjohnno 12 днів тому +1

      @@DessieDoolan Cheers mate.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 12 днів тому +1

      @@DessieDoolan I can't help but wonder if the transformers at both locations are just being stored there for use offsite at a later time?

    • @DessieDoolan
      @DessieDoolan 12 днів тому +2

      @@DavidJohnson-tv2nn For sure not to be used on this site west of the highway.
      Another BESS seems a reasonable guess.

  • @ModernProjectManager
    @ModernProjectManager 12 днів тому +1

    Good Job! Thank you for the Tesla Factory Construction Flyby!

  • @benguthrie49
    @benguthrie49 12 днів тому +1

    Thanks Brad

  • @hal3137
    @hal3137 13 днів тому +1

    Excellent work.

  • @DanielMurphySr
    @DanielMurphySr 13 днів тому +2

    Looking busy!

  • @andreandre1051
    @andreandre1051 12 днів тому +1

    Merci👍👍👍

  • @franklubeck9405
    @franklubeck9405 13 днів тому +1

    👍

  • @memrjohnno
    @memrjohnno 12 днів тому +1

    Cheeeeeers mate.

  • @DavidJohnson-tv2nn
    @DavidJohnson-tv2nn 13 днів тому +3

    Thanks Brad!
    Substation expansion project:
    @ 14:15 Concrete pad poured for the new set of 345 kV circuit breakers.
    Also @ 14:15 To right of the new concrete pad.... Set of 3 new switches next to the structure they will be mounted on.
    @ 14:25 (By the telehandler) Structural steel components.
    Still to be done.... Drilling holes, concrete piles, and the construction of 2 A-frame towers.

    • @Gig0Surf
      @Gig0Surf 13 днів тому +2

      Plus the piles and components south of the transformer, presumably to be added after the transformer is in place.

    • @DavidJohnson-tv2nn
      @DavidJohnson-tv2nn 12 днів тому +2

      @@Gig0Surf Yep, you're right. I momentarily forgot about that.

  • @tashi282
    @tashi282 13 днів тому +2

    enclosed trailers to Mexico.

    • @fernandocosta1025
      @fernandocosta1025 13 днів тому

      Possible Dry Vans to Canada also?

    • @memrjohnno
      @memrjohnno 12 днів тому +1

      @@fernandocosta1025 Would they not use transporters or rail up to Canada?

  • @stephenreeves21
    @stephenreeves21 13 днів тому +1

    Brad, great recon!
    What’s going out of the rail yard?
    Thanks

  • @musk-eteer9898
    @musk-eteer9898 13 днів тому +4

    does anyone know about $7500 tax credit for the non-foundation cybertruck yet??? i'm waiting to start designing mine from the invite.

    • @mini2nut67
      @mini2nut67 12 днів тому +2

      Chinese sourced material for 4680 batteries, does not qualify for $7500 tax credit. Maybe in a 3-6 months.

  • @josephpotterf9459
    @josephpotterf9459 12 днів тому +3

    I saw my first tesla truck in Atlanta on the highway. Absolutely the ugliest moving trash dumpster i've ever seen. To each it's own.

    • @memrjohnno
      @memrjohnno 12 днів тому +1

      lol One man's pleasure is another man's poison, as we say over here in the UK.

  • @kkarllwt
    @kkarllwt 12 днів тому +1

    Using the slider, I watched 3 minutes an 20 seconds of this video. There wasen't much there , there. Most of the video could have used footage from 2 weeks ago.