Level Crossing, Wingham NSW, Part 3.

Поділитися
Вставка
  • Опубліковано 23 лис 2023
  • The first activation is shown at 2:31
    This is the Wingham Road level crossing at Wingham, New South Wales. Since I last filmed the crossing in June 2020 the Safetran mechanical bell has been replaced by a Western Cullen Hayes mechanical bell.
    In March 2021 the town of Wingham was inundated by major flooding which lasted for several days, during this time the railway line was covered by water which caused continual activation of the level crossing. It is likely that this prolonged activation was a contributing factor in the Safetran bell dying so quickly.
    The Safetran bell can be seen here in part 2 • Level Crossing Update,...
    Part 1 • Level Crossing, Wingha...
    Train information:
    1st train: NT36 XPT service from Grafton to Sydney.
    2nd train: 2WB7 Qube steel service from Port Kembla to Brisbane, with locomotives QL005 and QL007.
    Filmed on September 4, 2023.

КОМЕНТАРІ • 15

  • @PTFSFanB0y
    @PTFSFanB0y 7 місяців тому

    I kinda like those level crossing

  • @jacktherailwayenthusiast3343
    @jacktherailwayenthusiast3343 7 місяців тому

    Great video Michael

  • @trainman758
    @trainman758 7 місяців тому

    Nice video and crossing!

  • @kcmorailfan4784
    @kcmorailfan4784 7 місяців тому

    Nice video! Shame the safetran mechanical bell here was replaced. Least it wasn't an E Bell that replaced it though.

  • @TheBCRailfan
    @TheBCRailfan 7 місяців тому

    Great video! I see the bell has gone back to a WCH mechanical once again.

    • @STUAA2024
      @STUAA2024 6 місяців тому

      Not a black one this time, but it sounds almost like the normal.

  • @TrickyMario7654
    @TrickyMario7654 7 місяців тому

    Looks like the Safetran bell is done for, this time for good. At least they replaced it with a new WCH m-bell.

    • @McKHAust
      @McKHAust  7 місяців тому +1

      The Safetran bell actually sounded better when it was here compared to Taree, but guess the floods finished it off.

    • @PTFSFanB0y
      @PTFSFanB0y 7 місяців тому

      Yo MCK&H, wanna collab?

    • @TrickyMario7654
      @TrickyMario7654 7 місяців тому

      @@McKHAust Yeah, it sure did.

  • @TazzieTransport
    @TazzieTransport 7 місяців тому +1

    Great video! Amazing that the signal masts still exist from original condition

  • @PTFSFanB0y
    @PTFSFanB0y 7 місяців тому

    Try do Murray bridge or Adelaide crossing next please

  • @azurecorviknight4189
    @azurecorviknight4189 7 місяців тому

    Do Urunga's one dammit!
    Also whats the point of having a one track sign on a railway crossing there, they should take it off!