IS 1200 Part 5 - Mode of Measurement of Formwork / Shuttering

Поділитися
Вставка
  • Опубліковано 15 кві 2018
  • How to calculate shuttering area ?
    Shuttering Measurement for Shuttering in construction - Must watch for every civil billing & costing engineer for better understanding mode of Measurement of Formwork/ shuttering works, with details of extra items.
    Link for Billing Videos as per IS 1200 OR SP 27
    Mivan Shuttering OR Aluminium System Form work
    • Mivan Shuttering Work ...
    IS 1200 Part 12 - Plaster Measurement
    • IS 1200 Part 12 Mode o...
    IS 1200 Part 2 - RCC & Concrete Work Measurements
    • IS 1200 Part 2 - Mode ...
    IS 1200 Part 1 - Earth Work / Excavtion Measurement
    • IS 1200 Part 1 - Mode ...
    For More Updates Please Subscribe our Channel.

КОМЕНТАРІ • 81

  • @FactualCivilEngineering
    @FactualCivilEngineering  5 років тому +4

    If any questions, please comment below.

    • @vishvendrasinghchoudhary9369
      @vishvendrasinghchoudhary9369 4 роки тому +1

      Sir hieght wali bat code m nhi h

    • @ankushnowal
      @ankushnowal 4 роки тому

      Sir column ki shuttering kis height tak ayegi?

    • @rajivsingh9012
      @rajivsingh9012 4 роки тому

      sir when we take measurements in running meter.if its less than 200 mm or 150 mm

    • @arnabpatra52
      @arnabpatra52 3 роки тому

      Single layer scaffolding ER schedule rate Kaya ha..

    • @kaushikc235
      @kaushikc235 5 місяців тому

      Is 100 mm Pcc shuttering payable?

  • @highwayguidecivilwalk
    @highwayguidecivilwalk 5 років тому

    Very knowledgeable video thanks a lot

  • @ImperfectBelievers
    @ImperfectBelievers 4 роки тому

    Good Work Sir... keep posting such informative videos

  • @jtgeete
    @jtgeete 6 років тому

    Very knowledgeable video

  • @rainbow9649
    @rainbow9649 2 роки тому

    Bhai pasand nhi bhot pasand aai aap ki video
    Thanks

  • @Deepakkumar-812
    @Deepakkumar-812 5 років тому

    Amazing video sir

  • @gaganap6603
    @gaganap6603 2 роки тому

    Great

  • @waitwaititsdp1791
    @waitwaititsdp1791 5 років тому

    Factual knowledge ....good one

  • @wonderingcivil8808
    @wonderingcivil8808 Рік тому

    Thanks

  • @adarshkumar-qx8cp
    @adarshkumar-qx8cp Місяць тому

    Nice

  • @kamalmishra3628
    @kamalmishra3628 3 роки тому +1

    Sir column ki shuttering slab bottom tak consider karenge ?

  • @harshalgadhia
    @harshalgadhia 3 роки тому

    Nice sir

  • @user-iu4wo5jy8t
    @user-iu4wo5jy8t 5 місяців тому

    Ek cover area billing video banaye sir

  • @biting.scorpio
    @biting.scorpio 6 років тому

    Very good

  • @MrGovarathana
    @MrGovarathana 5 років тому +2

    Sir,
    One doubt
    In over head tank
    RC wall inner side another wall continues then inner side shuttering shall we deduct or not..

  • @civiltechwithap7144
    @civiltechwithap7144 4 роки тому

    sir,
    plz suggest me which book is best for QS and Billing engineer which book can use by experienced person.

  • @modassariqbal306
    @modassariqbal306 4 роки тому

    Sir Rcc slab me kaun kaun s openings area and kain Kaun s duct deduct hota hai contractor k Area nikal kr bill dene ko sir...

  • @MrGovarathana
    @MrGovarathana 5 років тому +1

    Sir,
    Please tell how to measure Staging measurement.
    Wheatger we will give staging measurement for both
    1.Concrete
    2.Reinforcement.
    Or one time it's enough..

  • @kaushikc235
    @kaushikc235 3 місяці тому

    Is PCC shuttering quantity to be consider in billing as per IS 1200?

  • @mukeshmani2003
    @mukeshmani2003 4 роки тому

    spacing between two props under the beam and slab both.

  • @govindsingh8168
    @govindsingh8168 4 роки тому

    🙏 🇮🇳 👍 😍

  • @atulkanawade9859
    @atulkanawade9859 2 роки тому +1

    Dear Sir..
    In the Case form work
    Opening upto 0.4 SQM is not deducted..
    But in the Case of Opening if Column Cross section more than 0.4 SQM is deducted or not ..
    Opening is not mentioned ...
    My Client deducted opening of Colum from Slab Shuttering...
    Please Guide

    • @kabeermeerahlawat8476
      @kabeermeerahlawat8476 Рік тому

      column cross section area will be deduction from the slab area its site rules (ultra tech cement Ltd Tadipatri, APCW line project)

  • @456895421
    @456895421 4 роки тому

    Dear,
    I need bs and us standards.
    Also Redbook and Fidic.
    Regards
    Alphyn P

  • @mdnakiullah4079
    @mdnakiullah4079 5 місяців тому

    Sir can we take shuttering qty for PCC side face?

  • @MrGovarathana
    @MrGovarathana 5 років тому +2

    In shuttering
    Labour bill
    Tie rod measurement?
    1.In RC wall both inner and outer tie rod fixed.
    One plywood - 8Tie rods connected.
    How many nos we will give measurement
    8 nos or 16 Nos

  • @princesharma-cg6sc
    @princesharma-cg6sc 5 років тому

    Please uplaod all parts

  • @ManojKumar-vj7kx
    @ManojKumar-vj7kx 5 років тому

    Agar column ka size 2.0 m ka hai or Beam ka size 1.0m X 1.5m hai to kya deduction nahi hoga

  • @aashishsharma6964
    @aashishsharma6964 3 роки тому

    Sir
    Edge of slab and breaks in floor and wall ki measurement kaise lenge.

  • @rex_montis2125
    @rex_montis2125 Рік тому

    What is height of column taken in formwork if slab height floor to floor 3.6 m and slab thickness is 0.15m.

  • @hjadav57
    @hjadav57 4 роки тому

    Sir mera 1 sawal he ki mera water tank kam chalo he 12mm ka steel he 150c/c he jo niche me lag gaya he upper lep karna to khatam hogaya he but mere pass only 8 mm ka steel he to me ushka lep ketna c/c karo kg b mech karna he steel ka ye wall k leye poch raha hu PL answer jaror dena sir.

  • @kumararvind8357
    @kumararvind8357 4 роки тому

    मेरा दो सवाल है,
    1॥डबल height shuttering me सिर्फ कॉलम की height क्लेम होती है या और भी कुछ.
    2.agar slab का thickness 200mm से ज़्यादा है तो एक्सट्रा item के तौर पे हम क्या क्लेम कर सकते हैं

  • @mayanksharma9007
    @mayanksharma9007 5 років тому

    Sir ydi secondry beam m aakr koi dusri secondry beam judti hai.. To us conditions m seondry beam ki side se jo beam ka jo cutout area bnta hai... Vo minus hoga ya nhi... Reply plz...

  • @shafatali1627
    @shafatali1627 5 років тому

    sir apnay antitermite aur backfilling ka video ni upload kiya.

  • @VenuGopal-po7wj
    @VenuGopal-po7wj 4 роки тому +1

    Sir if I take slab area for shuttering,if columns opening area less than 0.4 m2 ,there will be no deduction for column area sir

  • @mayanksharma9007
    @mayanksharma9007 2 роки тому

    Sir Billing Engineer k liye koi course launch kijiyega Plz.. Sir How i can contact you

  • @shahulhameed9261
    @shahulhameed9261 6 років тому

    Is there any mode of measurements for solids concrete block work

    • @FactualCivilEngineering
      @FactualCivilEngineering  6 років тому

      Shahul Hameed its depend on work order BOQ Item, generally its measured in sqm for 100mm & 200mm thick block works

    • @shafishaikh1281
      @shafishaikh1281 4 роки тому +1

      @@FactualCivilEngineering sometimes it is only measured in sqmt for 100mm and more than that can be measured in M3.

  • @shafatali1627
    @shafatali1627 5 років тому +1

    sir 1200 k aur Bhi part upload kryay. plz

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому +1

      Please send your mail id, i will send you SP27 book for all IS 1200

    • @amitsaini1145
      @amitsaini1145 2 роки тому

      @@FactualCivilEngineering pls s nd me SP 27

  • @MrShaikhzaid
    @MrShaikhzaid 4 роки тому +1

    Kya slab thickness deduct hoga? In case of inner side column shuttering. IS code m yeh baat nhi di hui hai. Pls reply.

    • @FactualCivilEngineering
      @FactualCivilEngineering  4 роки тому

      Di hui h, column should be measured upto bottom of slab

    • @MrShaikhzaid
      @MrShaikhzaid 4 роки тому

      @@FactualCivilEngineering Thanks Sir. Also explain reason behind that.

  • @Bharatinfra02
    @Bharatinfra02 3 роки тому

    Sir column waala point fir se samjha dijiye

  • @kumararvind8357
    @kumararvind8357 4 роки тому

    Arch का shuttering and concrete Qty का फॉर्मूला क्या है

  • @vishvendrasinghchoudhary9369
    @vishvendrasinghchoudhary9369 4 роки тому

    Sir extra iteam ke lie konsa is code kahta

  • @AmitKumar-fj2ih
    @AmitKumar-fj2ih 6 років тому

    Sir plywood ka density kya hota hai..

    • @FactualCivilEngineering
      @FactualCivilEngineering  6 років тому

      According to IS 875 Part 1 ( Page No. 16) density of plywood should be 700kg / cum minimim, used for construction works, also you can watch my video Density of Building Material

  • @ramkumar-rt9oi
    @ramkumar-rt9oi 5 років тому

    Kindly tell me scaffolding measurement

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      Dear Ram, Scaffolding measured in two types Sqm OR Cum, as 1. paint, plaster, masonry, vertical surface works in Sqm and 2. Under shuttering case for slab supports in cum

    • @sukumarn4830
      @sukumarn4830 5 років тому

      @@FactualCivilEngineering I tnk cum not come.
      =(L+b)*h
      Like this come this also comes under sqm

  • @kumararvind8357
    @kumararvind8357 4 роки тому

    गोल calumn की shuttering निकलने का फॉर्मूला क्या है

  • @shafatali1627
    @shafatali1627 5 років тому

    sir edges of slab jo hoti h usko running metre may measure krtay h ki ni . sir generally shuttering square metre may krtay h pr kaha kaha pr running metre may krtay h . plz reply me.

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      Shafat Ali All kind of shuttering / form work measured in sqm as per IS Code, and Only touch of concrete area measured for payment in footing, column, slab, beam etc.

    • @shafatali1627
      @shafatali1627 5 років тому

      sir BOQ may diya h usmay muje 1 doubt h.

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      If it is described in BOQ item than we meaured in running meters,

  • @kamalmishra3628
    @kamalmishra3628 3 роки тому

    Sir 3mm thick polycarbonate sheet ka rate analysis karna hai DAR me nhi mil raha labour and material ka sheet ka price 70 rs per sqft hai

    • @FactualCivilEngineering
      @FactualCivilEngineering  3 роки тому +1

      Ok, i will prepare for it

    • @kamalmishra3628
      @kamalmishra3628 3 роки тому

      @@FactualCivilEngineering thanku sir
      Sir maine apko mail kiya tha kal cash flow ki sheet ke liye sir mail kardenge to help ho jayegi meri thodi

  • @vishvendrasinghchoudhary9369
    @vishvendrasinghchoudhary9369 4 роки тому

    Sir ye hieght wali bat to code m h hi nhi

  • @shafatali1627
    @shafatali1627 5 років тому

    Good morning sir, sir IS1200 part 5 k page no 7 pr (m) serial no h usmay jo likha h edges of slab and breaks in floor and walls . sir yeah point smja diyay muje.

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      Yes you are right End edges of slabs / balcony are measured in running meters upto 200mm thickness, but practically end of edges merged in outer side of beamand most of BOQ items of measured in sqm due to various thikness of slabs,

    • @mayanksharma9007
      @mayanksharma9007 5 років тому

      Sir ye ab bhi clr nhi hua ho ske to ek sketch bna kr dal dijiyegaa... Ki end edge kaise running meter m nape... Kyoki hm to balcony slav ko bhi area m napte hai

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому +1

      Dear Mayank, its only horizontal for slab fins case

  • @AshishhP1209
    @AshishhP1209 6 місяців тому

    Main aur secondary beam wala agar dimension consider krke smjhate toh aur jyada clear hota, smjh mei aaya hi nahi.
    Main beam
    length 5m width 0.3
    Secondary beam
    Length 4m width 0.3
    Then
    Shuttering will be
    5*0.3=1.5 sqm
    4*0.3=1.2 sqm
    Cutout wala smjh nhi aaya

  • @rajatmehta7682
    @rajatmehta7682 3 роки тому +1

    In case we claim shuttering extra for height more than 3.5 mtr. Can you let me know how to claim for height of 6 mtrs. Plan area can be considered 100 sq mtrs. Please do reply

    • @FactualCivilEngineering
      @FactualCivilEngineering  3 роки тому

      6 - 3.5 = 2.5 mean 3 times of plan area (3 x 100 Sqm) for a seperate rate of extra height for per metre height

  • @visheshmittal5287
    @visheshmittal5287 2 роки тому

    Thanks