IS 1200 Part 3 Mode of Measurement of Brick Work - Construction Billing Engineers Quantity Surveyors
Вставка
- Опубліковано 2 вер 2021
- Dear Friends,
In this video I have discussed about method of mode of measurement of brick works for construction billing & quantity estimation wors inline to IS 1200 Part 3 & some general basic rules.
I hope this video helpful to all civil engineers for understanding of basics for mode of measurement of brick work
Always learn new things from your vedios
After two weak I get a new your video .. good and new information for everyone ......
Great sir, good teaching style. Bless you.
I just came through ur channel, its simply Amazing explanation
Best Topic and Best Explanation
Bohot acche se explain kiya sir
Very good presentation and ready reconer tips.
Great work sir ji
Thank you very much
Great sir
Narayan Bless 🙏 You
Sir.... please make a video on piling and its process and then load testing on piles like initial load and routine load test process and purpose of doing that
Thanks sir jee ☺️
Sir
Also make a video on rate analysis for Gypsum work and wall putty
Sir
Please make a video on JCB output with average rates with format
Sir, Nice explained on brick work.
I have a question that if clear height of brick work is More than 3M then in that case is extra height will claim or not.
Sir
Please make a video on rate analysis for painting work internal and external side
Plz upload video of false ceiling measurement and paint
Sir pls make video that how to calculate total area of any residential building floor wise
Sir dry cladding sand stone k bare me video banaye.
A very helpful video..Jo pillar as an extra item apne btaya..Sir kya iske rates DSR mein available hain ya kya iske DAR mein iske analysis hain??Jahan se iske rates liye jaa sakein
Yes
Sir billing engeer banne ke liye ak complete course banaye na aap...start to end ...step by step..full billing
Folded staircase ki ek video banado sir,plz.building me karwani hai sir.
Sir Civil b.e. ke baad MBA Kis branch-- finance ,hr ,marketing or Production management,, se kre ki Civil job career se picha chuut jaye .
Good afternoon Sir, is there any video on method of measurement of "Slab/Plinth rate" "Item rate as well as Lumpsum" with material & with out material (i.e. only Labour), i mean per Sft 35, 50...so & so... Please provide...
Sir at my site the main & partition walls both are constructed in single brick of 6" having header bond. What will be the unit of measurement sq.m?
Is the mode of measurement is different in IS 1200 and CPWD Specs?
Sir mere project k BOQ mei Half aur single brick ka item hai, stairs k step ka brick work half mei liya jata hai ki single brick mei?
brickwork k time extra excavation and pcc hota hai, ye excavation and pcc alag se measure hoge ya nahi ??
What if the single brickwork of 230mm i mean 6" is done for main and partition wall. Do we have to measure it in sq.m
And ye jo mortar qty. Freeze h 0.25 cum for 230 mm b/w non modular bricks ke liye h but brick ki size change hone par ye qty. Varry krega n sir aur Reconciliation ke liye isi method se cement ki qty. Nikalna hota h kya
Yes, this fix qty by cpwd
@@FactualCivilEngineering sir please give the reference for freeze value for .25cum & .28 cum .
You have mentioned (Time 5:10) that the height of brickwork in foundation is up to 1200 mm from GL. please give reference.
Bhai earth lift ka extra item kaise claim krna hota h.....or lift ki quantitiy kaise nikalte h
Bhai please jldi s bna do video muze apni site pe claim krna h
Sir kindly assumed dimensions in feet and inches instead of meter and millimeter
sir hight section main milega elevation main
Sir,kg of cement 250 kaise drive out karte hain
Good morning sir
Sir how you took the cement qty as a 250 kgs. In CM 1:6
Extra item kaise bnaya jata hai?
Circular or semicircular brick work k case main radius kahan se kaha taak gintey hai? Aagar kisi ko pata hai to pls samjao kynku sir to rpy hi ny detey.
Sir how do i get sand quantity requirement
Lintel beam depth include nhi hogi deduction k waqt
Sir brick paya ke liye extra item kese banega
Sir my aapko janta hu m3m job karte hi na sir aapka class of line kha chalta hi
Sir .25 aya kaha se please calculations .25
1500×1500 mm brick work column measurement of 1 MTR ht ??
Sir 6m radius above circular brick work ka claim kisa hoga?
General Item Main
OK sir thank you so much
1.35 should be taken instead of 1.25
Sir how to measure length of circular b/w inside , outside or center perimeter
Centre line
250 kg weight of mortar kaha se aaya kaha se aaya
Kch b ne dikh raha