Swapping Power at the End of the Line

Поділитися
Вставка
  • Опубліковано 26 лис 2024

КОМЕНТАРІ • 16

  • @benjaminl3084
    @benjaminl3084 Місяць тому

    It's great to see so much activity on the east end of the line!

  • @scottlindquist8417
    @scottlindquist8417 Місяць тому +1

    Hey Matty, that’s an interesting way to run a local! 👍🇺🇸

  • @kptrains
    @kptrains Місяць тому +1

    Nice footage!

  • @Watertender-lu7vj
    @Watertender-lu7vj Місяць тому +1

    Neal has 2 RS32's now! It's just like Christmas!

  • @henrym8280
    @henrym8280 28 днів тому

    Very nice! Are they still running Tuesdays and Thursdays or has it changed with the added traffic?

    • @mattygunn693
      @mattygunn693  28 днів тому

      @@henrym8280 They've been running Wednesdays and Fridays since the pandemic.

    • @henrym8280
      @henrym8280 28 днів тому

      @mattygunn693 Oh I gotcha thanks. How does it work with two jobs, do they run same day?

  • @briank.8925
    @briank.8925 Місяць тому +1

    9:37 Is that Owens Road? Did that little piece of MOW equipment clear out the trees covering the end of the line?

    • @mattygunn693
      @mattygunn693  Місяць тому +1

      1) Yes it is.
      2) It did not.

    • @briank.8925
      @briank.8925 Місяць тому

      @@mattygunn693 ok, did it help with that old siding where an engine house was going to be built?

    • @mattygunn693
      @mattygunn693  Місяць тому +1

      ​@@briank.8925I don't think so. There was some track work that took place along the east end of the line recently. It might have been for that.

  • @mattglea7563
    @mattglea7563 Місяць тому

    Do they run by SUNY Brockport or does the line end before that?

    • @mattygunn693
      @mattygunn693  Місяць тому

      They actually run through SUNY Brockport.