Thank you for the video. Engineer, this is what a contractor sent me. Please let me know if this is responsible. This is the quotation for the Borehole. After comparing prices and the durability of the borehole type. The heavy duty borehole price #15,000,00.(Fifteen million naira as the minimum they can take, yet the guarantee they give is shaky, the maintenance will be as if you digging a new one. The person I contracted is the person that is handling (LILAC) Waters borehole. This is the quotation ÷Cement#152,000,00.------Rope 2 coils=#60,000,00-----Pipe 20pcs=#150,000,00Stone 20 bags #70,000,00.-----Sumo pump 3.5 Hp#350,000,00.Wyiner#5,5oo, 00.-----Chaka pan 3pcs#225,000,00.-----Crane or Pipe holder=#15,000,00.----Tangit gum=#5,000,00.----Cutix 4 core flex cable 2.5mm---2coils#600,000,00. Labour or workmanship =#4,000,000,00.-------Total #5,632,500.
May I have his info?
I never new it was this affordable. Thank you Jesus. God bless you Sir.
It’s our pleasure.
Thanks for watching.
Hello Mr, Engineer, Realtor Benjamin Ali. Thank so much for the update.
You’re welcome Ma.
Please can u share Rasheed and your numbers for my upcoming projects. Soil-test and borehole and other projects. Thanks
We can talk here Sir: +2349077319888
Thank you for the video. Engineer, this is what a contractor sent me. Please let me know if this is responsible.
This is the quotation for the Borehole. After comparing prices and the durability of the borehole type. The heavy duty borehole price #15,000,00.(Fifteen million naira as the minimum they can take, yet the guarantee they give is shaky, the maintenance will be as if you digging a new one. The person I contracted is the person that is handling (LILAC) Waters borehole. This is the quotation ÷Cement#152,000,00.------Rope 2 coils=#60,000,00-----Pipe 20pcs=#150,000,00Stone 20 bags #70,000,00.-----Sumo pump 3.5 Hp#350,000,00.Wyiner#5,5oo, 00.-----Chaka pan 3pcs#225,000,00.-----Crane or Pipe holder=#15,000,00.----Tangit gum=#5,000,00.----Cutix 4 core flex cable 2.5mm---2coils#600,000,00. Labour or workmanship =#4,000,000,00.-------Total #5,632,500.
Just contact this guy then. Note that the price may not be 300k but it won't be as high as what your contractor told you.