Subgrade for Basement & Setting Steel columns & I-beams with a Skid Steer Nudura ICF House Build

Поділитися
Вставка
  • Опубліковано 13 гру 2024
  • Preparing Subgrade with 3/4 clean stone. Cutting, welding, torching, mag drilling, and fabricating Steel I beam columns and Beams from Used steel from Facebook marketplace. Using Bobcat T200 compact Track Loader and PC100-6 excavator to Fly and set the Beams, and then finally laying 2" of XPS Foam for inulation under 4.5" Concrete slab.

КОМЕНТАРІ • 11

  • @philjohnston9616
    @philjohnston9616 Рік тому +1

    Definitely a man of many skills. Nice job

  • @hollandduck79
    @hollandduck79 Рік тому

    hello from the Netherlands .
    thanks for the video .
    Sincerely Hollandduck

  • @RicardoFelippeFigueirachardao
    @RicardoFelippeFigueirachardao Рік тому +1

    Muito bom!

  • @suzylarry1
    @suzylarry1 Рік тому

    I think I am behind the game? Is this an addition to the house , that may be part of the business? I watched the truck build and missed this part.

  • @coutinho640
    @coutinho640 Рік тому

    Sucesso

  • @coutinho640
    @coutinho640 Рік тому +1

    Asé ô. A benção Tata

  • @DevilTravels
    @DevilTravels Місяць тому

    Is a 4" ledge enough to hold an I beam?

    • @andersonpropertymaintenanc952
      @andersonpropertymaintenanc952  Місяць тому

      @@DevilTravels they're bearing on 10 inch

    • @DevilTravels
      @DevilTravels Місяць тому

      @@andersonpropertymaintenanc952 that's a 10" ledge? Gosh, that must be a very thick foundation wall

    • @andersonpropertymaintenanc952
      @andersonpropertymaintenanc952  Місяць тому

      @@DevilTravels 8 inch core with 2inch ledge poured by cutting out foam and extending the concrete to the interior surface