Subgrade for Basement & Setting Steel columns & I-beams with a Skid Steer Nudura ICF House Build
Вставка
- Опубліковано 13 гру 2024
- Preparing Subgrade with 3/4 clean stone. Cutting, welding, torching, mag drilling, and fabricating Steel I beam columns and Beams from Used steel from Facebook marketplace. Using Bobcat T200 compact Track Loader and PC100-6 excavator to Fly and set the Beams, and then finally laying 2" of XPS Foam for inulation under 4.5" Concrete slab.
Definitely a man of many skills. Nice job
hello from the Netherlands .
thanks for the video .
Sincerely Hollandduck
Muito bom!
I think I am behind the game? Is this an addition to the house , that may be part of the business? I watched the truck build and missed this part.
It's technically an addition as we live over the garage now. But it is going to be our family's home.
Sucesso
Asé ô. A benção Tata
Is a 4" ledge enough to hold an I beam?
@@DevilTravels they're bearing on 10 inch
@@andersonpropertymaintenanc952 that's a 10" ledge? Gosh, that must be a very thick foundation wall
@@DevilTravels 8 inch core with 2inch ledge poured by cutting out foam and extending the concrete to the interior surface