  • @nick_1551
    @nick_1551 4 місяці тому +5

    14:08 those beams are under the EDTP project as part of the 2nd viaduct for Tebrau Highway to accomodate the height of the OHLs, not RTS.

    • @thebiannualtravellers
      @thebiannualtravellers  4 місяці тому

      Ah, ok, I was wondering where else they were going to eract a second set for RTS. Now it makes sense.

    • @nick_1551
      @nick_1551 4 місяці тому +4

      @@thebiannualtravellers the original Tebrau Highway viaducts were replaced under the EDTP because
      1) height too low for OHLs
      2) one of the 2 original viaduct was actually more of an underpass with the space of only a single-track, which is likely the reason why that was the first of the 2 to be demolished & rebuilt, in order that the 2nd track can be installed below while this new 2nd viaduct is being replaced, which they are doing now. The 2nd new track is more of less completed already

  • @abuzek2447
    @abuzek2447 4 місяці тому

    I can feel megaproject HSR will be another plan in to do list.

  • @ravindrandoraisamy9758
    @ravindrandoraisamy9758 4 місяці тому +1

    After Operational…conduct a drill on how to manage “10000”.. people in the event of a breakdown or system fault..,

    • @thebiannualtravellers
      @thebiannualtravellers  4 місяці тому +4

      this simulated mass evacuation drill / fire drill is definitely a requirement (in Singapore Context) before the service can commence to test out the egress systems and plans.

    • @nick_1551
      @nick_1551 4 місяці тому

      Such have to be conducted even before operations, in not just an event of breakdown, but also matters of national security like a terrorist attack even in the ICQs

  • @Iamwhatiam76
    @Iamwhatiam76 4 місяці тому

    Hopefully they have plans to extend to Larkin for JB and Yishun for SG

    • @nick_1551
      @nick_1551 4 місяці тому

      No. RTS line is meant to be an entirely separate line for security purposes. We can make new rail connections from both stations, but not an extension of it.

  • @marktan3668
    @marktan3668 4 місяці тому +1

    Concrete web, cement complex. Very heavy use of cement. Where do they manufacture the cement ?

  • @mtay65
    @mtay65 4 місяці тому +1

    Hope to see completion by end 2025.

    • @thebiannualtravellers
      @thebiannualtravellers  4 місяці тому +2

      yesss, we are hoping the same. Can't wait to ride on it after following the building process.

  • @afizi1213
    @afizi1213 4 місяці тому +2

    13:55 this new bridge is build to go to the rts changar hill?\

  • @farhan-5705
    @farhan-5705 4 місяці тому +1

    How does the construction process for the center feature work? (Esp the middle most one that marks the border) Do workers from both countries access to work on the piece?

    • @thebiannualtravellers
      @thebiannualtravellers  4 місяці тому +3

      Hi, good question, i believe the iron workpiece is delivered from malaysia side, and i saw the delivery of the sky lifts using a barge from the SG side. so i would assume the workers are from both Singapore 🇸🇬 and Malaysia 🇲🇾.

  • @rolandyeo3619
    @rolandyeo3619 4 місяці тому

    Curious what the night illuminations on the bridge will look like?

  • @mekvek
    @mekvek 4 місяці тому

    How would the truck at 4:50 make a 3-point turn if it wants to go to the opposite direction?!

    • @thebiannualtravellers
      @thebiannualtravellers  4 місяці тому

      It would most likely need to reverse all the way, guided by a worker.

  • @Dragon-gl1rw
    @Dragon-gl1rw 4 місяці тому

    After this project is completed, the next one may be the new Causeway to replace the old one.

  • @erictayverystrongimaginati1662
    @erictayverystrongimaginati1662 4 місяці тому +2

    🇲🇾🇸🇬👍✌️🙏

  • @hatihitam5724
    @hatihitam5724 4 місяці тому +4

    7:30 TMJ COMING

  • @afizi1213
    @afizi1213 4 місяці тому +2

    2:05 look how the beautiful concrete they do for rivers

  • @afizi1213
    @afizi1213 4 місяці тому +1

    3:11 what is this bro

  • @azmiharon8621
    @azmiharon8621 4 місяці тому +1

    Singapura Johor Bahru tidak dapat dipisahkan semakin dirapatkan.Penduduk singapura semakin ramai yang tua tidak produktif pekerja tenaga malaysia semakin juga tidak dapat dipisahkan.Harap duit singapura kekal tinggi

    • @KeristamingSariSakti
      @KeristamingSariSakti 4 місяці тому

      Kalau suatu nanti SGD1=RM0.20 sekalipun KERAJAAN SINGAPORE tiada masalah!!!! Banyak warga China berbondong datang kijer di Singapore yg semakin lengkap public transport smart mereka!!!!

    • @azmiharon8621
      @azmiharon8621 4 місяці тому

      Workers are the same.Different is that no house,less basic needs less electric and water to be use ,since Malaysian workers stay in Johor Bahru plying everyday to Singapore.So it can be said less burden to Singapore than workers from other countries that have to stay in Singapore making more crowded to Singapore enviorement and surrounding houses or flats ang public transport