EDTP - Final 197KM KTM-ETS Route in Peninsular Malaysia

Поділитися
Вставка
  • Опубліковано 3 лют 2025

КОМЕНТАРІ • 351

  • @imanabdullah3263
    @imanabdullah3263 9 місяців тому +83

    Our small city should take advantage of this program amd turn their town planning to be Transit Oriented...

  • @rickydimas2674
    @rickydimas2674 9 місяців тому +119

    as Indonesian who recently watching southeast asian train progress, this project one of my biggest attention like imagine if we visit Singapore and then took the RTS to JB connected w ETS all the way to KL and going up to Penang, looks fun

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому +26

      ETS connect JB to padang besar Perlis .. than you can take other train to go Hat Yai
      thailand
      sure you and enjoy trip to penang as well ..
      3 country vaction trip
      🇸🇬🇲🇾🇹🇭

    • @Muhdmzkr
      @Muhdmzkr 9 місяців тому +11

      can go to thailand also

    • @naimsukarno9060
      @naimsukarno9060 9 місяців тому +11

      Eventually u can take 2 metro that cross the sea in d future..RTS from SG to JB and then LRT from Mainland Penang to Penang Island..
      Imagine u take RTS from SG, then ETS from JB to Butterworth (Penang Mainland) and continue ur journey from Butterworth to Georgetown (Penang Island) via LRT

    • @SuperZI
      @SuperZI 8 місяців тому +2

      ​@@KasutBarai79494Berape Panjeng Rutenye?

    • @KasutBarai79494
      @KasutBarai79494 8 місяців тому +11

      ​​​@@SuperZI
      45km 🇲🇾Padang besar - 🇹🇭Hatyai
      886km 🇲🇾Padang besar - 🇲🇾Johor bharu (ETS)
      4km 🇲🇾Johor Bharu - 🇸🇬 Singapore ( RTS )

  • @cheehuigoh9363
    @cheehuigoh9363 9 місяців тому +41

    as a person who loves road trip, I've been to all these places, but by car... and now i'm very excited to plan for my first ever "train trip" soon

  • @NES292
    @NES292 9 місяців тому +51

    Yes! Thanks for the update sir! It's almost there,Segamat 2.0 will officially debut on July 2024. Maju Johor!
    Also,glad to see the first utilization of elevated tracks by KTMB

  • @aungmyintoo4635
    @aungmyintoo4635 9 місяців тому +16

    I am really appreciate your hardwork to give us view from drone and on the road for each stations. Thank you so much!

  • @KhamisRosely
    @KhamisRosely 9 місяців тому +20

    Pucuk dicita ulam mendatang. Semoga kerja2 penyambungan landasan ETS berjalan dgn lancar, sempurna dan selamat. Penantian yg menampakkan kemajuan utk semua kawasan2 dan bandar2 disetiap laluan. Tahniah utk KTM. Malaysia terus membangun. Menuju ke alaf baru yg lebih bermakna. Kesejahteraan utk semua raayat. Semoga Malaysia dilindungi dan terjaga sebaik mungkin. Jgn sampai raayat Malaysia kehilangan negeri yg diberkahi ini. ❤ Malaysia ❤

  • @azidinzidin4915
    @azidinzidin4915 9 місяців тому +20

    Terbaik lh.. npk cantik menunjukkan ketelusan projek ini ke arah memacu kemajuan negara.. in shaa Allah

  • @MyName-bo6ed
    @MyName-bo6ed 9 місяців тому +51

    Lawa semua stesen2nya.. Hrp2 kakitgn dan rakyat malaysia khususnya reti menjaga elok2...

  • @dariuskonka2644
    @dariuskonka2644 9 місяців тому +19

    Buat pertandingan landskap utk cantikkan setiap pekan..pohon2 yg sesuai ditanam, bunga-bungaan,arca apa saja..

  • @kopeesoosoo8740
    @kopeesoosoo8740 9 місяців тому +67

    Min 2:05 Majlis Perbandaran Segamat & KTMB harap dpt cantikkan dan pulihara jambatan lama tu

    • @mndan76
      @mndan76 9 місяців тому +15

      Dah pulihara, tak nampak ke siap ada gerbang, tempat photoshoot di situ

    • @AZRI135
      @AZRI135 9 місяців тому +14

      Jambatan lama keretapi itu bukan dibawah tanggungjawab KTMB lagi. Sekarang ini dibawah tanggungjawab pihak Majlis yang ko sebutkan tadi. Jambatan lama keretapi itu dah takde kaitan dengan KTMB lagi.

    • @fuadhashim9038
      @fuadhashim9038 9 місяців тому +7

      lain kali pi segamat tu tgk jambatan lama besi..mmg cntik lgi2 waktu mlm chaya ngn lampu2

    • @ez1963-j8z
      @ez1963-j8z 9 місяців тому +2

      OK boss

    • @normahsalim455
      @normahsalim455 6 місяців тому +1

      Alhamdulillah dah siap ye,,last balik ke Segamat ,,tpi ETS sampai Gemas,,jdi sambung tren biasa,dari Gemas _segamat,,dah siap boleh terus dari BM _segamat

  • @hamiltonastan
    @hamiltonastan 9 місяців тому +41

    at last, a huge progress in the southern region's double-tracking project with most of the alignment completed. the upcoming ETS extension to Segamat commencing on 1 July marks a stepping stone for the EDTP operations in Johor which can be stated in the Segamat chapter. From Segamat onwards, the contractors need to finalise the touch-ups on the electrification as well as the construction works at the Labis railway flyover and Kempas Baru depot. soon, the southern edtp operation can be slowly extended stage by stage from Kluang onwards. most importantly, there will be a direct connection between Padang Besar and Singapore using the latest ETS train service to jb.

  • @รักพงษ์เจนอนุวัฒน์

    สุดยอด😊😊 สถานีที่สวยงามและเรียบง่ายเน้นประโยชน์ใช้สอย😊😊

  • @izzaniielachannel
    @izzaniielachannel 9 місяців тому +7

    Terima kasih admin atas perkongsian nye..memang menarik naik ETS nie😊

  • @ganesanm2172
    @ganesanm2172 9 місяців тому +8

    Waiting for this ....TQ admin

  • @norshardinalgismail-mz6hf
    @norshardinalgismail-mz6hf 9 місяців тому +6

    Alhamdullilah. Allah permudahkan Segamat dan Malaysia.
    Johor maju jaya..

    • @AnoySelamat
      @AnoySelamat 5 місяців тому

      Semua negeri2 yg ad d mlysia nk maju bsama mlysia

  • @akifiskandar4186
    @akifiskandar4186 9 місяців тому +24

    Rasanya lepas ni harap2 la landasan KTM ke Pasir Gudang dibuat double track dan elektrifikasi untuk perkhidmatan Komuter Selatan. Senang orang PG dgn Masai dan Seri Alam nak pegi JB x payah hadap jem dan jalan berlubang highway Pasir Gudang.

    • @ahmadsuhaimichedin
      @ahmadsuhaimichedin 9 місяців тому +1

      Minta YB Parlimen petik sikit pada kerajaan.

    • @anandoraemamu
      @anandoraemamu 9 місяців тому +4

      Aah..komuterkan area bndar penawar-PG-kulai-senai-JB-skudai-Pontian

    • @mang6879
      @mang6879 7 місяців тому

      ​@@anandoraemamuTMJ ckp takde duit.. suruh federal buat..😅

    • @AnoySelamat
      @AnoySelamat 5 місяців тому

      ​@@mang6879
      Duit Nk Bli pemain Bola

  • @weng-soonlow7370
    @weng-soonlow7370 9 місяців тому +11

    Looks like the double tracks are almost fully completed. Now to complete the electrical cables and the stations

  • @Snoopy-mr8qu
    @Snoopy-mr8qu 9 місяців тому +9

    My family has bought kl condo in anticipation of this.. boleh balek selalu jumpaxmak bapa Nd save ..

  • @mohdshahril9429
    @mohdshahril9429 9 місяців тому +22

    Stesen Segamat paling strategik..berdekatan dengan stesen bas dan pusat beli belah Segamat Sentral

  • @mohannarendran8623
    @mohannarendran8623 9 місяців тому +11

    Thank you for this well-done video

  • @groovy92me
    @groovy92me 9 місяців тому +4

    Xsabar nak balik kluang naik KTM, pastu bole ngopi kt stesen kluang.. nak balik kg dr KL pun boleh balik hari... thumbs up KTM!!!!!

  • @user-tl9wv6wu9h
    @user-tl9wv6wu9h 9 місяців тому +23

    I strongly agree with proposed elevated ART project in JB because :
    Time saving : Building elevated road is quicker than LRT tract.
    Cheaper : Elevated roads aren’t expensive compared LRT rail.
    Reliable trip & frequency : Self automation, no need to stop at traffic lights, dedicated lanes & no stuck at traffic jams.
    Clean energy & no pollution : Electric vehicles & self-charge.
    Previous johor IMBRT proposal is big no no ❌ because the bus still needs to stop at traffic lights + other vehicles might carelessly using that BRT lanes & disrupting bus frequency-arrival times.

    • @RedzyRezali
      @RedzyRezali 9 місяців тому +4

      I concur. What a brilliant point of view. Couldn't agree more.

    • @kaiwen353
      @kaiwen353 9 місяців тому +1

      More the capacity of the art more than imbrt

    • @amirism91
      @amirism91 9 місяців тому +3

      yes also it just the same as lrt but it operates on road tarmac so it is way cheaper

    • @aungmyintoo4635
      @aungmyintoo4635 9 місяців тому +1

      I would choose BRT like Sunway BRT which it has its own flyover and wont interrupt traffic below.

    • @user-tl9wv6wu9h
      @user-tl9wv6wu9h 9 місяців тому +4

      @@aungmyintoo4635 BRT with classic bus needs driver to move … sick, toilet, late are inconvenience for passengers. ART is automatic yet driverless.

  • @muhdsharmi4431
    @muhdsharmi4431 9 місяців тому +25

    Harap lepasni ktm boleh sambung jajaran kl sentral ke melaka tengah jasin muar batu pahat. Sepatutnya bandar melaka pusat pelancongan dapat impak dari kereta api ni untuk menyenangkan pelancong datang ke melaka

    • @edaysiha7561
      @edaysiha7561 8 місяців тому +3

      dengar nya akan datang akan ada tapi tak pasti ets atau pon apa … muar dia akan menyelusuri tepi sungai

  • @amirism91
    @amirism91 9 місяців тому +48

    Stesen kat belah Johor ni mmg cantik gila berbanding belah utara

    • @shafiqikmal930
      @shafiqikmal930 9 місяців тому +22

      Betul tu.. saya yang berasal dari Alor Setar, Kedah pun kagum dengan keunikan dan keindahan station2 baru di Johor dari Segamat sampai di area JB Sentral. Berbanding dengan station KTM ETS di Alor Setar. Semoga bila dah siap 100% nanti boleh saya cuba dari Alor Setar ke KL Sentral ke JB Sentral dengan family saya. Salam dari Kedah.

    • @Patamon-ov2kk
      @Patamon-ov2kk 9 місяців тому +15

      ECRL punya stesen lagi gempak.

    • @shafiqikmal930
      @shafiqikmal930 9 місяців тому +8

      @@Patamon-ov2kk saya tahu sebab max speed ECRL beza dari ETS punya iaitu 160 km/h. Yang ECRL tu pun nanti kalau dah siap 100% saya nak naik dari Gombak ke Kota Bharu.

    • @shafiqikmal930
      @shafiqikmal930 9 місяців тому

      @@Patamon-ov2kk awak asal pantai timur ke?

    • @selendanghitam2477
      @selendanghitam2477 9 місяців тому +4

      ye lah dah 30 tahun ets wujud baru nak merasa. so fair enough lah

  • @tinglestingles
    @tinglestingles 9 місяців тому +5

    Progress never stops! I saw another transport bus/metro system in progress in Kuching - KUTS?

  • @alifalimazlan181
    @alifalimazlan181 9 місяців тому +14

    We need a better road insfrastructure to connect Johor and the East Coast. Maybe a proper highway/railway from JB to Kuantan.

  • @adyfery23
    @adyfery23 8 місяців тому +5

    Stasiun nya sangat besar,rapi nan bersih semoga selalu terjaga

  • @amirism91
    @amirism91 9 місяців тому +32

    Pemaju² mesti geram je nak ambil tanah sawit sebelah stesen ets tu nak buat perumahan. Nak buat perumahan boleh tapi jgn lah sampai cekik darah sampai xde org beli. Pemaju pun rugi sbb xde sapa yg nak beli

    • @asyrafarmy2001
      @asyrafarmy2001 9 місяців тому +13

      Pintu masuk ke Stesen baharu Paloh cuma ada 1 jer. Patutnya kena buatlah pintu kedua di kawasan kelapa sawit tu

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому +3

      iya

    • @daengzool6023
      @daengzool6023 9 місяців тому +7

      Perlu buat rumah mampu milik bukan mampu tengok, sebab mereka ni lah yg akan guna kretapi?

    • @imaknaktamales
      @imaknaktamales 7 місяців тому

      Besar kemungkinan tanah sawit tu pemaju dah borong. Macam dekat tempat aku ada stesten erl. Kawasan sekeliling stesen tu asalnya tanah kelapa sawit. Fast forward tahun 2014 baru tahu, rupa-rupanya Sime Darby dah lama beli tanah tu. Sekarang ada plan nak naik perumahan kat situ.

  • @radzizainal1998
    @radzizainal1998 8 місяців тому +6

    Kalau ada rezeki nnti nak naik ets dari jb ke padang besar

  • @asriasri1861
    @asriasri1861 9 місяців тому +12

    Dapat bina lintasan baru hubungkan Stesen baru KTM.Kulai dan Terminal Bas Kulai...

  • @farhan-5705
    @farhan-5705 9 місяців тому +28

    They should build sheltered linkway all the way from the train to the bus station

    • @nick_1551
      @nick_1551 9 місяців тому +4

      Bus station not under their charge. So they have no jurisdiction to build a shelter all the way there.

    • @user-tl9wv6wu9h
      @user-tl9wv6wu9h 9 місяців тому +8

      @@nick_1551state government + town council have power to relocate bus stations. More integrated (public transport), more markets, more developments.

    • @nick_1551
      @nick_1551 9 місяців тому +6

      @@user-tl9wv6wu9h yes. What I mean is that they don't fall under the project's scope. Just like how the recent announcements of the link bridge to Coronation Square from the RTS do not fall under the RTS or Coronation Square construction projects, but as a separate project.

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому +1

      Agree

  • @rajkdave391
    @rajkdave391 6 місяців тому

    Nice work Hallelujah!

  • @SzlibgeSzli
    @SzlibgeSzli 9 місяців тому +6

    Mantap JB 🎉🎉🎉

  • @Destroyer4700
    @Destroyer4700 9 місяців тому +9

    The stations aren't properly integrated with existing infrastructure.
    Look 3:53.
    You can spot the Segamat Bus terminal on the right and the overhead bridge that links it with the rest of the town center.
    But the only way to get there from the train station is a small staircase which is easier to see at 3:57.
    But not only does it lead to hazardous parking lot for cars and heavy vehicles. Right now that staircase is blocked by a red car because it is still marked as parking lot.
    Then we see at 3:58, the sheltered walkway in the middle could have been integrated with the existing sidewalk of the roundabout with a slope. Instead the ground is kept raised and the sidewalk is excluded from the station by a wall, fences and guardrails.
    It is almost like the station was designed to be as inaccessible to pedestrians as humanely possible. Do they expect people to fly to the stations?

    • @akifiskandar4186
      @akifiskandar4186 9 місяців тому +3

      Its up to the PBT to complete the infrastructure as anything outside the station is not under the purview of the RAC

    • @Destroyer4700
      @Destroyer4700 9 місяців тому +2

      @@akifiskandar4186 Excuses like this are how you end up with mediocre infrastructure in the first place.
      Was there no attempt to collaborate with local authorities? How else do you end up with a staircase that exits right into a parking lot?

    • @akifiskandar4186
      @akifiskandar4186 9 місяців тому +1

      @@Destroyer4700 I know its just that in many cases even though there were plans to enhance pedestrian connectivity to the station the uncooperative attitude of the PBT can hamper efforts to enhance pedestrian access

    • @namazlur78
      @namazlur78 8 місяців тому

      It will be upgraded once the money start flowing

    • @Destroyer4700
      @Destroyer4700 8 місяців тому

      @@namazlur78 Once the money starts flowing, even I know it will be diverted to pockets, not upgrades.
      JB Sentral bus terminal is now too small to accommodate all of the bus routes. Money is flowing, but where are the upgrades?

  • @muhdfauwazel-emin2132
    @muhdfauwazel-emin2132 9 місяців тому +14

    Bila siap sepenuhnya dan beroperasi sepenuhnya, ianya sangat permudahkan semua rakyat jelata utk balik kampung tanpa perlu hadap lebuhraya jam, tak perlu lagi bimbang akan kemalangan di jalanraya. Semuanya selamat sampai dan selamat balik ke rumah.
    Semoga teksi tidak ambil kesempatan naikkan harga tambang dari Station ke destinasi rumah.
    Nak singgah ke Singapore juga dipermudahkan. Dari 8 jam misalnya dari Ipoh, Perak....hanya sekitar 4 jam setengah misalnya dah boleh tiba di Kastam dan Imigresen Johore.
    Yang bekerja di Singapore, boleh manfaatkan peluang utk sewa rumah luar dari Johor.
    Tunggu ECRL Pantai Timur pula utk disiapkan. Jika siap, projek mesra rakyat berjaya dilaksanakan.

    • @AZRI135
      @AZRI135 9 місяців тому +2

      Bukan setakat EDTP dan ECRL je malah RTS sekali. Dari utara nak ke Singapura kena tukar tren di JB dan menaiki tren RTS dari JB ke Singapura.

    • @khookaisheng1166
      @khookaisheng1166 9 місяців тому +2

      sama2 kite harapkan yg terbaik utk negara and negara jiran. best. yg untung rakyat semua.

  • @azamisme
    @azamisme 9 місяців тому +9

    Byk elevated track di selatan..mantap

    • @amirism91
      @amirism91 9 місяців тому +4

      sbb mengenang banjir teruk di johor

  • @lim5639
    @lim5639 9 місяців тому +5

    when completed, can take ETS from Penang to JB save lots of time.
    Anyone draft a travel guides for each station along the tracks? For short trip maybe.

  • @shaifan5443
    @shaifan5443 6 місяців тому +2

    Mudahlah student parent yang nak hantar anak balik UiTM Segamat naik tren je, dah tentu takde jam kat Highway PLUS belah Nilai-Seremban. Semoga dengan siapnya tren ETS ni sampai JB mampu menarik lebih ramai pelanggan dan menyakinkan KTMB untuk tambahkan lagi trip Selatan dari 2 trip kepada 4 trip.

  • @penkendi8903
    @penkendi8903 8 місяців тому +3

    The electrified double-track project ETS is the last project initiated by Tun Dr in 2001 from Padang Besar to JB. However, the project was scaled down by Pak Lah only implemented from the KL- Padang Besar. By right, Malaysians could enjoy traveling north to south by train instead of using the North-South Highway (NSH) which is always congested.
    Today is hard to get an ETS ticket for travel from KL to Penang.

  • @frankiechiuh3401
    @frankiechiuh3401 8 місяців тому +2

    At 2:25 & 3:21 (and many other underpasses)- There should be a height restriction gantry to avoid accidentally hit by reckless vehicles which could interrupt the train operations. See 12:42, there is one height restriction gantry.

  • @kimimpown
    @kimimpown 8 місяців тому +6

    rasanya JB Sentral pon da sampai masa nak kena upgrade da...

  • @onijatitulang1943
    @onijatitulang1943 3 місяці тому

    Wow luar biasa good evening thank you 😮❤ malaysia

  • @irfanarif1009
    @irfanarif1009 8 місяців тому +2

    Nice.. alhamdulillah❤

  • @muhdnurzahin6403
    @muhdnurzahin6403 9 місяців тому +4

    lepas nie pegi port healing bekok & tangkah pengkoi naik nie je. then blh sewa moto 😅

  • @sharilaril7582
    @sharilaril7582 9 місяців тому +2

    Makin penuhlh sempadan Utara & Selatan selepas ni & ramai menjadikan Pengangkutan berasaskan rel sebagai keutamaan

  • @abdulmananmansor4273
    @abdulmananmansor4273 9 місяців тому +8

    Billion duit untuk kemudahan rakyat..tahniah KTM...

  • @roslisudin3066
    @roslisudin3066 9 місяців тому +15

    Alamdulilah may all the projects be done now i rosli bin sudin age 65 years wish to Allah allow me to see it one days and all people around world.amin amin amin.

    • @heavyunit161
      @heavyunit161 6 місяців тому

      How old are you currently?

  • @abd_rahhmann
    @abd_rahhmann 9 місяців тому +13

    1 julai 2024 ETS akan mula beroperasi untuk stesen segamat. padang besar - segamat - padang besar

    • @amirism91
      @amirism91 9 місяців тому +3

      ye dia buka fasa by fasa

  • @mohdhelmi968
    @mohdhelmi968 9 місяців тому +4

    Jangkaan RAC April 2025 siap sepenuhnya. Siapa kerja dengan projek ni boleh pastikan tak.

  • @izatemiruzer6634
    @izatemiruzer6634 8 місяців тому +2

    Diharapkan di masa hadapan, KTM boleh me wujudkan jajaran komuter di sepanjang Laluan ktmb dari utara sehingga ke selatan. Kini, Laluan komuter boleh diakses dari padang besar - penang, Penang - ipoh, tg malim - Rawang, rawang - kl, mungkin selepas ini boleh sampai ke jb.. Boleh santai2 dari utara ke selatan, banyak bandar-bandar boleh dilawati sepanjang jajaran ini.

  • @haojiechang2802
    @haojiechang2802 8 місяців тому +3

    Please make a video on KVDT2

  • @aungmyintoo4635
    @aungmyintoo4635 9 місяців тому +7

    This is the complement with ECRL and hopefully with HSR in the near future (too bad due to politic, the project delayed or could be cancelled again)

    • @namazlur78
      @namazlur78 8 місяців тому +2

      Nope malaysian opposed the hsr. We wait 10 more years for a maglev train KL to Bangkok

  • @mohdamin9543
    @mohdamin9543 9 місяців тому +4

    Macam bestnye kalau naik ETS ke selatan semenanjung, Bole try nanti kalau turun JB rilek tak perlu drive keta, perghhh mcm Seronok je naik ETS ke JB nanti

    • @fuadhashim9038
      @fuadhashim9038 8 місяців тому

      Tggu la thun dpn blh naik ets..kna sbr

  • @WanKasbi
    @WanKasbi 8 місяців тому +3

    Kami warga Pantai Timur, khususnya laluan keretapi dari Gemas ke Tumpat tidak dianaktirikan,,, Harap Kerajaan Madani, Kementerian Pengangkutan & KTMB menyambung serta meneruskan EDTP dari Gemas ke Tumpat kerana bukan semua negeri Pantai Timur khususnya kawasan Pedalaman dapat menaiki ECRL... jadi dgn adenya ETS & KOMUTER laluan Gemas ke Tumpat dpt kami rasai nikmati seperti Pantai Barat...

    • @normahfadzil1481
      @normahfadzil1481 7 місяців тому +1

      Boleh…insyallah. Kalau Anwar dan kerajaan Madani di beri peluang untuk terus perintah MAlaysia…..banyak kebaikan akan di lakukan. Jangan beri peluang kpd pembangkang2 yg tak ada idea……cuma nak rosakkan perpaduan kita demi tamak nak berkuasa saja.

    • @ediysmart9283
      @ediysmart9283 6 місяців тому

      Ecrl nnti siap..

  • @user-tl9wv6wu9h
    @user-tl9wv6wu9h 9 місяців тому +9

    Kat kempas baru tu ada development apa? Macam banyak buildings under construction

  • @syedputra5955
    @syedputra5955 9 місяців тому +6

    Sepatutnya dari kluang harus ditambah landasan komuter unutuk kurangkan kesesakan dan kelambatan servis inter city. Misalan ipoh - kuala lumpur. Sampai di rawang servis inter city terpaksa bergerak perlahan untuk beri laluan kepada tren komuter yang berhenti di semua stesen pinggir bandar.

    • @khookaisheng1166
      @khookaisheng1166 9 місяців тому +1

      kannnn. mungkin kalo ade ETS and atau train laju yg nk overtake kommuter/intercity, akan stop di Paloh yg ade lebih platform bagi lalu dulu.

  • @noraqis77
    @noraqis77 7 місяців тому +1

    Tak sabar nak pegi Padang Besar dan Hat yai naik ETS dari Kulai Johor ....

  • @nicknick3994
    @nicknick3994 9 місяців тому +8

    mohon ktmb jaga maintenance elok2 ye.. sbb tngk mostly dekat utara station & rolling stock semua maintenance kelaut.. ada station butterworth je yg ok skit sbb ada penang sentral

    • @muhammadammaranuar
      @muhammadammaranuar 9 місяців тому +4

      Itu semua under tanggungjawab RAC. KTMB hanya menjalankan operasi tren sahaja.

    • @amirism91
      @amirism91 9 місяців тому +1

      ipoh ok je

    • @namazlur78
      @namazlur78 8 місяців тому

      Lol palatau

  • @amirism91
    @amirism91 9 місяців тому +25

    Anthony loke cakap nnti ada komuter mcm kat KL & Penang

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому +13

      wajib kena ada

    • @musmuse1989
      @musmuse1989 9 місяців тому +9

      Kne ada mcm komuter ipoh-pdg besar so orang boleh ulang alik utk pergi keje dan mudahkan pelbagai urusan

  • @congji
    @congji 9 місяців тому +5

    Hope ade plan rangkaian train KTM sambung direct kepada new TBS station yg dekat Gombak tu, yg mana ada rangkaian train ECRL.

    • @AZRI135
      @AZRI135 9 місяців тому +3

      Ya jika ECRL dah siap nanti. 1 lagi terminal bas baru yang kat Gombak itu bukan dipanggil sebagai TBS tetapi dipanggil sebagai TBG (Terminal Bersepadu Gombak). Laluan tren yang ada di Gombak hanyalah tren LRT Kelana Jaya Line sahaja dan tiada laluan tren KTMB di Gombak.

    • @j0n14n4kj4ti
      @j0n14n4kj4ti 8 місяців тому +1

      Mungkin boleh dibina Terminal Bersepadu (ITT) di Serendah yang menjadi penghubung antara rangkaian ECRL & ETS(KTMB).

  • @kurryjb_ib988
    @kurryjb_ib988 9 місяців тому +5

    Imo, I think that they can do a pedestrian or bicycle track on the onld track that has been taken out. And for the old bridge, I am not sure if there could just use it and add a walking/cycling lane on top of it and just use the old foundation as it is. I know my idea will never be considered as we never bridge out another public transportation between the station to the city/ resedential streets.

  • @azmanahmad2820
    @azmanahmad2820 9 місяців тому +8

    bila nk siap dan opening ni tuan, tak sabar nak direct ETS dari Gemas ke JB,tak larat tggu shuttle dah

    • @AZRI135
      @AZRI135 9 місяців тому +4

      Hujung tahun 2025 dijangka siap sepenuhnya.

  • @Margasatwa_99
    @Margasatwa_99 5 місяців тому +2

    Harap kerajaan naik taraf juga KTMB kelantan Gemas jadi double track electric cabin....maka connectivity train in Malaysia fully integrated

    • @Woo-b9l
      @Woo-b9l 2 місяці тому

      Harap pega, pega makan padi. Berpuluh puluh tahun pegang jawatan, mana ada usaha untuk kemajuan.

  • @hufjournallife7218
    @hufjournallife7218 9 місяців тому +9

    Should get small mall like Aussie mall

  • @noa0766
    @noa0766 9 місяців тому +5

    what must be had now is... seamless connectivity

  • @nick_1551
    @nick_1551 8 місяців тому +2

    00:23 New Segamat Station opens as of today at 7am.

  • @anak-e1m
    @anak-e1m 7 місяців тому +3

    Sekolah menengah sains segamat pun baru buka, senang anak2nak balik JB,KL dan utara tanah air.

  • @jordanteh2211
    @jordanteh2211 9 місяців тому +13

    hopefully the KTMB can do better on the maintenance of the station . Look at those existing ktmb station across the nation. Lift not working, station dirty, long Q, chaos.. not enough seat ....etc....
    world class station, but no class maintenance.

    • @muhammadammaranuar
      @muhammadammaranuar 9 місяців тому +9

      Itu tanggungjawab RAC bang. KTMB is just the train operator only.

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому

      silap orang da😂

    • @khookaisheng1166
      @khookaisheng1166 9 місяців тому

      @@muhammadammaranuar betul tu.

    • @namazlur78
      @namazlur78 8 місяців тому

      Lol palatau

    • @spdfatomicstructure
      @spdfatomicstructure 7 місяців тому

      Not just the stations, but the rolling stock too. Especially the pre-ETS diesel trains

  • @amirism91
    @amirism91 9 місяців тому +22

    Bagi saya kalau nak tunggu ETS kat JB siap buka je yg Kempas Baru tu dulu. Bukan jauh pun dari JB

    • @asyrafarmy2001
      @asyrafarmy2001 9 місяців тому +14

      Memang pun macam tu. Stesen ETS akan mula beroperasi dari Utara Johor sehinggalah ke Johor Bahru.
      Akan tetapi, kawasan Kempas Baru tu banyak juga ye kena siapkan dari segi pembinaan jejambat jalan raya, Depoh EMU & sebagainya

  • @edaysiha7561
    @edaysiha7561 8 місяців тому +2

    harap akan datang ad jugak kereta api di muar batu pahat pecah laluan untuk muar dan batu pahat tak lupa jugak pontian berjumpa balik di kempas baharu cadangan sahaja harap di pertimbangkan

  • @spdfatomicstructure
    @spdfatomicstructure 7 місяців тому +1

    And once the RTS Link is completed, it would once again mean Singapore, Kuala Lumpur and Bangkok - three great metropolises in Southeast Asia - will once again be linked together by trains running more or less in a single line

  • @playhome5245
    @playhome5245 7 місяців тому +1

    Johor buatla pintu gerbang setiap daerah. Mcm dekat melaka pahang terengganu. Lawa pintu gerbang dekat tgh2 jalan.

  • @arstiahsu793
    @arstiahsu793 6 місяців тому +2

    I wish there is a direct train from JB to KL. No need change train at Gemas to KL.

  • @kohdesmond
    @kohdesmond 4 місяці тому +2

    No updates yet?

  • @TheLUSMAYS
    @TheLUSMAYS 7 місяців тому +2

    Belah Johor punya stesen memang gempak.. Belah Utara biasa biasa saja

    • @Ruriko.Y
      @Ruriko.Y 5 місяців тому +1

      stesen2 belah Johor baru dengan design yg simple & modern. belah utara ada beberapa stesen yg masih kekalkan senibina lama yg lebih nostalgic & ada unsur estetik yg tinggi.

  • @abelyazedjamaludin6450
    @abelyazedjamaludin6450 9 місяців тому +7

    Bila semua stesen mula beroperasi?

    • @AZRI135
      @AZRI135 9 місяців тому +2

      Tunggulah pengumuman rasmi dari pihak KTMB sendiri nanti.

  • @fauzirahman3285
    @fauzirahman3285 9 місяців тому +3

    At an average speed of 100 km/h, I would think the future route between JB and KL will take 4 hours or just a bit more.

  • @johanramli61
    @johanramli61 3 місяці тому +1

    20:31 Pekerja kontrak KTM selamba buang sampah dalam longkang! Betul² abc gst orang Kulai.

  • @jasmanairadaruddin9853
    @jasmanairadaruddin9853 7 місяців тому +1

    SCM pls update Kempas Baru New Station and Depot progress project, and Thanks.

  • @defbbcivy
    @defbbcivy 5 місяців тому +1

    yk what would be great? a line connecting penang and kelantan, its doable

  • @jonathans4832
    @jonathans4832 9 місяців тому +2

    Its like taking forever? When will it finally be ready?

  • @konner111
    @konner111 7 місяців тому +1

    I hope next year i can go back hometown in penang by train

  • @alberthuat5748
    @alberthuat5748 9 місяців тому +14

    20:32 woiiii staff buang sampah over the fence

    • @TimFoo6143
      @TimFoo6143 9 місяців тому +1

      This is a result of probably short term thinking and thoughtlessness. It resulted in this irresponsible and uncivilised act. KTMB (or somebody) should put an end to this.

    • @khookaisheng1166
      @khookaisheng1166 9 місяців тому +1

      tu lah, KTM semua patut ambil tindakan dan hentikan semua ni

  • @hairulnizam-m8p
    @hairulnizam-m8p 9 місяців тому +12

    Kerajaan mohon buat jajaran Baharu sambung Segamat ,Bandar Tun Razak ,Muadzam Shah Gambang ,ke Kuantan

    • @asyrafarmy2001
      @asyrafarmy2001 9 місяців тому +2

      Laluan KTMB ni adalah laluan daripada zaman kolonial British (FMSR)

    • @matdanih
      @matdanih 9 місяців тому +3

      Segamat boleh dihubungkan ke pantai timur melalui Gemas.

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому +3

      fuhh mamtab ronda2 klo mcm gitu

    • @AzraiAziz
      @AzraiAziz 9 місяців тому +3

      ​@@matdanihlaluan KTMB tak melalui Muadzam Shah & Rompin

    • @AZRI135
      @AZRI135 9 місяців тому +2

      Kalo Gambang dan Kuantan itu bukan laluan KTMB tetapi laluan ECRL.

  • @raudzahmam4210
    @raudzahmam4210 9 місяців тому +19

    Wah....mcm ni tinggal di Muar n gi kerja kat JB boleh travel setiap hari.

    • @maririnafi6129
      @maririnafi6129 8 місяців тому +2

      Muar? Train tak lalu Muar..paling2 dekat kena pergi Segamat atau Labis dulu

    • @mohamadtarmizi2246
      @mohamadtarmizi2246 8 місяців тому +1

      Muar takda stesen

  • @arstiahsu793
    @arstiahsu793 6 місяців тому +1

    Please also include the beautiful East Coast

  • @tinglestingles
    @tinglestingles 9 місяців тому +5

    So close to opening.

  • @introvertlyadam
    @introvertlyadam 8 місяців тому +3

    Ya, saya suka Malaysia jadi negara taman.

  • @afizi1213
    @afizi1213 9 місяців тому +3

    9:52 haaa elok dia bina pejalan kaki mcm nilaaa brotherr saiz yang kompak dan xtinggi sangat ,ini kat kl merepek aaa dhlaa tebal kecik xmasuk akal laa haha dhlaa xde letak longkang penutup jenis besi dan batu dia letak lubang jee apa daa

  • @masbidiljourney
    @masbidiljourney 2 місяці тому

    Can't wait to see it's done then take the ETS from JB to Padang Besar someday
    Once i did is from Padang Besar to KL Sentral only

  • @LightBluly
    @LightBluly 9 місяців тому +5

    As a Singaporean who had relatives living around Gemas, i'm surprised it took them this long when Gemas to Padang Besar had already completed almost a decade ago. What happened?

    • @nick_1551
      @nick_1551 9 місяців тому +6

      We can't really compare to that time as we know COVID is one of the biggest reasons.

    • @Patamon-ov2kk
      @Patamon-ov2kk 9 місяців тому +8

      Malaysia's government always prioritise Klang Valley & Northern Region. After that Sabah Sarawak, then the Southern Region and lastly East Coast. East Coast always get the worst treatment 😂

    • @KasutBarai79494
      @KasutBarai79494 9 місяців тому +1

      covid 19 ma

    • @AzraiAziz
      @AzraiAziz 9 місяців тому +1

      ​@@Patamon-ov2kkBukan Utara. Tapi Penang. Lagi2 kerajaan pusat utamakan Klang Valley & Penang. Kawasan lain dianaktirikan. Cuma Johor bernasib baik banyak mendapat projek dari pihak swasta

    • @ViksterG
      @ViksterG 9 місяців тому +3

      @@AzraiAziz Tak sah. Penang mendapat projek LRT setelah 20 tahun. Yang lain semua kebanyakkan nya swasta, dan Penang juga meyumbang cukai tertinggi kedua Malaysia selepas Selangor.

  • @LODEH08532
    @LODEH08532 5 місяців тому

    Menarik

  • @anyadamian8833
    @anyadamian8833 9 місяців тому +8

    Org segamat hadir 👋

  • @inulhaqim
    @inulhaqim 9 місяців тому +6

    What about senai station?

    • @AZRI135
      @AZRI135 9 місяців тому +7

      Stesen itu dikira sebagai status simpanan. Jika ada permintaan tinggi barulah kerajaan akan buat perancangan untuk bina stesen Senai itu.

    • @adminaisb5326
      @adminaisb5326 9 місяців тому +5

      Build a new station at Senai. And have a shuttle bus from the airport to the station. And serve the commuter to the city centre.

  • @namazlur78
    @namazlur78 8 місяців тому +6

    Menyala malaysiaku. ETS lebih ekonomi & menjimatkan

  • @yasserhussin21
    @yasserhussin21 9 місяців тому +1

    Bila mula operation?

  • @8spores
    @8spores 3 місяці тому

    When expected to complete ?

  • @rahamahabu1819
    @rahamahabu1819 9 місяців тому +1

    Harap dapat buat jalan susur dari Jalan Muar ke Stesen KTMB, Stesen Bas yg lebih baik utk elakkan jem teruk setiap hari terutama waktu petang

  • @inulhaqim
    @inulhaqim 9 місяців тому +1

    Hi admin , Any insider updates on when can all of us expected komuter selatan services from jb sentral up north?

    • @AZRI135
      @AZRI135 9 місяців тому

      Komuter bukan untuk perkhidmatan tren jarak jauh mcm tren Intercity dan konsepnya sama mcm MRT dan LRT. Kalo dari JB Sentral ke Utara seperti Butterworth dan Padang Besar boleh aje naik tren ETS.

  • @nick_1551
    @nick_1551 9 місяців тому +1

    So OHL works has come down all the way to Kulai. 😍