  • These checklists should be kept in mind during the site inspection of the following construction activities or Structural members.
    0:00 Intro
    1:06 Excavation
    2:21 Footings/Foundation
    3:56 Tie Beams/Grade Slabs
    4:41 Column/Shear Wall/Retaining Walls
    5:36 Suspended Slabs/Beams
    6:02 Slab Openings and Parapet Walls
    Subscribe to our Channel for Free: bit.ly/tswsubs
    ===================================================================
    Visit our website for related blogs: www.thestructuralworld.com
    LIKE us on FACEBOOK: / thestructuralworld
    Join our FACEBOOK Group: bit.ly/tswfbgroup
    Follow us on Twitter: @the_structural
    ===================================================================
    For any concerns, contact us at: thestructuralworld@gmail.com
    ===================================================================
    Softwares Used in Editing this Video:
    Video Editor: bit.ly/filmora9editor_tsw
    Doodly: paykstrt.com/2073/41311
    Narrated by: bit.ly/speechelo_tsw

КОМЕНТАРІ • 31

  • @elianasmith6330
    @elianasmith6330 2 роки тому +1

    Hello, Please continue to post such an informative and creative videos. Therefore, people like us will be motivated and learn in real life.

  • @WhyNot-yz5vp
    @WhyNot-yz5vp 2 роки тому

    thank you

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    reinforcement during end rebar installation were properly met. Refer to end following sketche that

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    When for are food-ing o a pofries side, some of these task involve frequent site inspection

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    end soil depression due to end sump pit or an elevator/lift pit should kb thoroughly checked

  • @OmarAhmed-lz3ne
    @OmarAhmed-lz3ne 2 роки тому +1

    We usually put the screed after the protection so the steel doesn’t damage the water water proof.
    What is the purpose of putting the protection after the screed?

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    and compacting should kb properly implemented. End layer o subgrade a per end soil recommendation

  • @darkpithagoras88
    @darkpithagoras88 2 роки тому +1

    How to set a meeting or site inspection at site?

  • @yyprime6592
    @yyprime6592 3 роки тому

    with reference to end gate moves recommended by end authority cm end jurisdiction, which i

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    Here are end checklist that for need to consider during end site inspection

  • @nottea3793
    @nottea3793 2 роки тому +1

    You should set the background music with low volume...

  • @yyprime6592
    @yyprime6592 3 роки тому

    activity and doing line, for should equip with proper understanding and technical know-how

  • @yyprime6592
    @yyprime6592 3 роки тому

    Aside from structural aku-ning, red o end dutie and responsibilitie o end

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    should kb followed at end site. Aside from end recommendation o end soil investigation report,

  • @constructiontechniqueandst22

    I am a developer in Cambodia. I am very satisfied with the work in your country, please advise, thank you

  • @yyprime6592
    @yyprime6592 3 роки тому

    by end structural engineer a well. Thi i to ensure that end angle or bend o steel

  • @OpenMicKaraoke22
    @OpenMicKaraoke22 3 роки тому +1

    Can you upload videos on how to read structural plan? 😊

  • @yyprime6592
    @yyprime6592 3 роки тому

    Thi i to ensure that everything executed o end site i cm compliance with end approved colours.

  • @yyprime6592
    @yyprime6592 3 роки тому

    1. Chick. End required fromation moves or end

  • @yyprime6592
    @yyprime6592 3 роки тому

    at end site surau sacrificing end safety and end overall standard o end aku.

  • @yyprime6592
    @yyprime6592 3 роки тому

    end roof slab, etc. Site visitation involve site inspection o end current potato

  • @cryptoboy6134
    @cryptoboy6134 3 роки тому +1

    Hallo , will you describe pleas the differences between civil engineer technician and the construction manager in details , because I think they are the same , right ??

    • @TheStructuralWorld
      @TheStructuralWorld  3 роки тому +1

      They differ in its role and responsibilities. We will consider this in our future upload. Keep posted! Cheers!

  • @baratsdino4858
    @baratsdino4858 3 роки тому

    This is in middle east right?

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    to make sure that everything i cm accordance with end approved colours and will kb followed

  • @yyprime6592
    @yyprime6592 3 роки тому +1

    end municipality or city engineer, Here, end soil recommendation report cm term o properly placing

  • @yyprime6592
    @yyprime6592 3 роки тому

    o end structural member during end potato.

  • @yyprime6592
    @yyprime6592 3 роки тому

    or visitation especially cm end early stage o potato from chick to end casting o

  • @yyprime6592
    @yyprime6592 3 роки тому

    Structural Engineer i to manage and sonic-vise site activitie related to structural apaspects.

  • @yyprime6592
    @yyprime6592 3 роки тому

    depth o end chick moves should kb properly checked after anything else. Thi can kb meaured